Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/18/2003 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 12/18/2003 | 12/18/2003 | 12/18/2003 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 12/18/2003 2:33:50 PM
|
BLD-Aging Inspection | 12/18/2003 | 12/18/2003 | 12/18/2003 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 7/25/2003 | 7/25/2003 | 7/25/2003 | A | PASS |
Tom Arcoraci
|
|
|
ok for perm occ
|
BLD-Aging Inspection | 7/24/2003 | 7/24/2003 | 7/24/2003 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/15/2003 | 5/15/2003 | 5/15/2003 | | CANC |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | PASS |
Troy Cobbley
|
|
|
Road is completed. Fire life safety finaled 5/15/2003 1:35:07 PM
|
Letter of compliance | | | 6/13/2002 | | DONE |
|
|
|
letter of Compliance #22512 issued 6-13-02.
|
FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | NR |
Troy Cobbley
|
|
|
secondary access still not complete 6/7/2002 1:56:38 PM
|
Temporary occupancy | | | 3/27/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4760 issued 3-26-02 to Republic Storage at Franklin, Bldg. #12, Sec. 1 of 2.
|
BLD-Final | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### CORNELL ###-#### CORNELL ok for temp 3/19/2002 4:33:05 PM
|
FIRE-Final Inspection | 3/18/2002 | 3/18/2002 | 3/18/2002 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/18/2002 9:55:52 AM life safety given temp per Dave Miller until secondary access road is complete
|
FIRE-Final Inspection | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | FAIL |
Troy Cobbley
|
|
|
Letter to Dave Miller required and road repaired 3/6/2002 3:55:30 PM
|
BLD-Framing/Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 | P | FAIL |
Russ Owen
|
|
|
fire wall -cornel-- ###-#### or ###-#### West side of firewall needs drywall behind red iron at south end left c/n beam to tight to rock, left c/n to have this addressed. 2/27/2002 1:44:35 PM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PART |
Russ Owen
|
|
|
###-####. Insulation and 1 st layer 3/4 in drywall at 4 hr area separation. 2/5/2002 4:04:49 PM
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | PART |
Tom Arcoraci
|
|
|
wip 1/14/2002 10:25:14 AM
|
BLD-Foundation | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### corwin
|
BLD-Footing | 11/6/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### STEVE
|
BLD-Footing | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Dave Hannah
|
|
|
###-#### STEVE work in progress 10/26/2001 10:47:13 AM
|
Issue PAID IN FULL permit | | | 10/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/12/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/28/2001 | | 10/11/2001 | | PASS |
Mike Phillips
|
|
|
10/11/2001 09:15:48 M_P - activity updated through activity BLDA022 from case BLD01-02651.
|
Routing - PLAN CHECK | 10/10/2001 | | 10/11/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/11/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/11/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 10/2/2001 | | 10/9/2001 | | PASS |
|
|
|
Approved per DRH01-7 and as noted on Sheet L-1.
|
Plan resubmittals received | | | 10/4/2001 | | DONE |
|
|
|
Received One copy of cover letter, structural notes and revised cert. of value. Two copies of struct. calculations, sheets O, A-8, F-2, RA-1, RA-2 RA-3 and RA-4 and structural response. Routed to Mike P. KMM
|
Routing - FIRE | 9/28/2001 | | 10/1/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/11/2001 | | 9/28/2001 | | FAIL |
|
|
|
Review completed, correction notice mailed. Additional informaiton required for further review.
|
Application received | | | 9/28/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/28/2001 | | |
|
|
|
|