Permit Information
Permit NumberBLD01-02724
StatusFinaled
Name GINO'S PIZZARIA & GILATO CAFE
Site Address 150 N 8TH ST (2ND FLR)
Project NameCAPITAL TERRACE
Customer Number 
ePlanReviewNo
Description
(GINO'S PIZZARIA & GILATO CAFE - CAPITAL TERRACE - 2ND FLR) This building is fire sprinklered to meet high-rise provisions. To create a 1,920 square foot restaurant tenant space on the 2nd floor of the Capitol Terrace building. Work is to include interior nonbearing walls, kitchen equipment, a Type II hood, service counters, and finishes all per approved drawings and plan review conditions on file. The capacity of the dining area (70) shall be posted on an approved sign near the main exit. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. This tenant space will also have 480 square feet of seating in the public terrace area. PC01-0797 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/11/20037/11/20037/11/2003 DONE
Additional values from subcontractors.
Fee Review-notes10/8/200110/8/20017/22/2002 DONE
Permanent occupancy  2/22/2002 DONE
Perm. Occ. Cert. #9038 issued 2-22-02 to Gino's Pizzaria & Gilato Cafe.
Permanent Occupancy 2/21/20022/21/2002 DONE
Details
FIRE-Final Inspection2/20/20022/21/20022/21/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/20/2002 at 17:01:05. Contact: ###-####.
BLD-Final2/20/20022/21/20022/21/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/20/2002 at 17:02:52. Contact: ###-####...card to bldr, ok for c/o. 2/25/2002 2:11:36 PM
BLD-Other2/19/20022/20/20022/20/2002APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/19/2002 at 11:16:46. Contact: ###-####. Firestop ass'y ok at 2hr floor (sink) 2/21/2002 9:21:53 AM
FIRE-Final Inspection2/18/20022/19/20022/19/2002AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/18/2002 at 12:35:44. Contact: ###-####. occupant load sign; door hardware removed and sign; 2/19/2002 9:23:48 AM
BLD-Other1/22/20021/23/20021/23/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/22/2002 at 16:55:13. Contact: ###-####...part, ok to move service counter, rec'd modified drawing; complete firestops at floor sinks per detail...lower side from floor below, ok to continue. 1/23/2002 11:24:24 AM
BLD-Other1/10/20021/11/20021/11/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/10/2002 at 14:43:45. Contact: ###-####. grid...c/n, support offsets, add perim wires as need, chk at final. 1/11/2002 12:52:34 PM
BLD-Framing/Rough-in1/11/20021/11/20021/11/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/11/2002 12:53:18 PM tunnel lids by corridor ok
FIRE-Sprinkler Rough-in1/9/20021/10/20021/10/2002APASS
DetailsRick Jackson
###-#### james okay to cover 1/10/2002 8:46:36 AM
BLD-Other1/7/20021/8/20021/8/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/07/2002 at 17:13:59. Contact: ###-####. ok to use tunnel ceiling at rooms adjacent to corridor....not specified on plan 1/8/2002 5:47:15 PM
BLD-Wall cover12/26/200112/26/200112/26/2001PPART
DetailsCarl Dependahl
###-####...walls ok 12/26/2001 2:26:37 PM
BLD-Conference12/21/200112/21/200112/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/21/2001 7:09:25 PM w/ bldr re rated walls, floor penetrations.
BLD-Conference12/21/200112/21/200112/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/21/2001 7:09:25 PM w/ bldr re rated walls, floor penetrations.
BLD-Conference12/20/200112/20/200112/20/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/20/2001 3:09:38 PM w/ bldr re insp req's
Issue PAID IN FULL permit  11/19/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/15/2001 PASS
Print Occupancy Form  11/15/2001 DONE
Inspection Record Card- Bld  11/15/2001 DONE
Telephone call  11/15/2001 DONE
permit ready
Plan assigned to (CJW)10/15/2001 11/15/2001 PASS
DetailsCarl Westfall
11/15/2001 09:21:32 CJW - activity updated through activity BLDA022 from case BLD01-02724.
Routing - PLAN CHECK11/7/2001 11/15/2001 PASS
Plan resubmittals received  11/14/2001 DONE
Received two copies of revised sheet three and one copy of cover letter. Routed to Carl W. kmm
Plan resubmittals received  11/13/2001 DONE
Received two sets of resubmittal sheets Two, Three and a response letter. Routed to Carl Westfall.
Routing - PUBLIC WORKS11/5/2001 11/7/2001 PASS
Routing - PLANNING Land Div11/5/2001 11/5/2001 PASS
land division ok. Routed to Public Works.
Routing - FIRE10/31/2001 11/5/2001 PASS
Plan Review Completed(1st rev)  11/5/2001  
Failed first UBC, Public Works, and Land Division reviews.
Plan resubmittals received  11/1/2001 DONE
Received two sets of resubmittal sheets M-1. Routed to Carl Westfall.
Routing - PLAN CHECK10/22/2001 10/31/2001  
Failed first UBC plan review. UBC plan review started October 29, 2001 and finished the next day. A response from the architect was required. See the conditions list.
Routing - PLUMBING10/19/2001 10/22/2001 PASS
Drawings approved.
Routing - PUBLIC WORKS10/19/2001 10/19/2001  
Incomplete site plan.
Routing - PLANNING Land Div10/15/2001 10/19/2001  
Failed first review. Incomplete site plan.
Plan resubmittals received  10/18/2001 DONE
Received two sets of sheets One & Three. Routed to Carl Westfall.
Plans ACCEPTED BY PLAN TECH  10/9/2001 DONE
CDH approved by Carol Johnson.
Application received  10/8/2001  
Recd Pcfee & Taken To Pln CK  10/8/2001