Permit Information
Permit NumberBLD01-02748
StatusExpired
Name DENNIS LARSON
Site Address 415 N BROOKDALE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of a screened enclosure for an existing concrete slab. All work is to be done with walls, ceiling, and slab to meet the min requirements for the Boise City Energy Code, that windows may be added in the future to become more living space. R-1c setbacks ok per ajb All per the approved plans as marked.. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/16/20027/17/20027/17/2002AFAIL
DetailsTony Young
fn carol- ###-####
c/n posted,, no inspection made 7/17/2002 1:15:49 PM
PostCard Mailed  7/13/2002 SENT
PostCard has been mailed requesting inspection.
BLD-Energy code compliance12/10/200112/11/200112/11/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 12/10/2001 at 15:00:35. Contact: .
BLD-Framing/Rough-in12/5/200112/6/200112/6/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/05/2001 at 16:00:51. Contact: . ok to cover ext shear ok . ok to insulate framing ok 12/6/2001 2:59:06 PM
BLD-Framing/Rough-in12/5/200112/6/200112/6/2001ANR
DetailsTony Young
12/5/2001 4:37:38 PM
BLD-Footing10/29/200110/30/200110/30/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/29/2001 at 15:09:03. Contact: ###-####. new ftg under old slab 10/30/2001 1:01:10 PM
BLD-Conference10/22/200110/22/200110/22/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 10/22/2001 2:27:57 PM . 10/22/2001 2:40:08 PM. Talked with contractor about the plans and the requirements for load bearing walls to have footings to frost depth. Posted c/n. Note: This structure is 494 sq ft and will be insulated and completly drywalled on the inside, and only has 13 percent of floor area in window openings. This proposed structure is designed no different than any typical R-3 addition. And by code should not be constructed on a slab, Even if room use is labled screened room on plan/permit. 10/22/2001 2:55:52 PM
BLD-Footing10/12/200110/15/200110/15/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/12/2001 at 16:28:28. Contact: . NOTE, This is an addition of a frost depth mono pouer slab approx 8 foot ext,onto an existing slab with no footing as shown on approved plans this area can not be used as heated habitible space .Existing slab should have been required to have a frost depth footing as it supports a trussed roofed screen room with ceiling fans shown on plans and plan also indicates room to be used year round ? New footing as per approved plans. 10/15/2001 10:57:39 AM
Application received  10/11/2001  
Plan assigned to (PEP)10/11/2001 10/11/2001 PASS
DetailsPerry Paine
10/11/2001 11:06:48 PEP - activity updated through activity BLDA022 from case BLD01-02748.
Inspector's copy Bld permit  10/11/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/11/2001 DONE
Inspection Record Card- Bld  10/11/2001 DONE
Issue PAID IN FULL permit  10/11/2001 DONE