Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-02791
StatusFinaled
Name MILT ERHART INVESTMENTS
Site Address 802 W BANNOCK ST (1ST FLR)
Project NameHOFF BUILDING-1ST FLR
Customer Number 
ePlanReviewNo
Description
(MILT ERHART INVESTMENTS - HOFF BLDG - 1ST FLR) This building is fire sprinklered for building area increase, because it is a high-rise, and to comply with 1994 UCBC provisions. To remodel an existing 1,150 square foot office tenant space located on the first floor of the Hoff Building (Southeast corner). Work is to include interior nonbearing walls, a restroom accessible to the disabled, and interior finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. PC01-0811 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/18/20021/22/20021/22/2002APASS
DetailsCarl Dependahl
###-####; ok for c/o 1/22/2002 12:24:44 PM
Permanent Occupancy 1/22/20021/22/2002 DONE
Details
Permanent occupancy UNPAID FEE  1/22/2002 DONE
Perm. Occ. Cert. #8999 issued 1-22-02 to Milt Erhart Investments.
FIRE-Final Inspection1/18/20021/18/20021/18/2002PPASS
DetailsTroy Cobbley
Fire life/safety finaled 1/18/2002 3:37:52 PM
BLD-Final1/18/20021/18/20021/18/2002PCANC
DetailsCarl Dependahl
###-####
BLD-Final1/10/20021/11/20021/11/2002PNR
DetailsCarl Dependahl
fn mike ###-#### need complete fi 1/11/2002 3:18:48 PM nish items, clarify hvac 1/11/2002 3:19:03 PM
FIRE-Final Inspection1/10/20021/11/20021/11/2002AFAIL
DetailsTroy Cobbley
replace thumb turn lock on main exit with keyed hardware, replace door handles on restroom and inner closet with approved hardware (lever type) 1/11/2002 9:25:26 AM
Inspection Record Card- Bld  1/11/2002 DONE
Print Occupancy Form  1/11/2002 DONE
BLD-Framing/Rough-in12/26/200112/26/200112/26/2001PPART
DetailsCarl Dependahl
###-####
Issue PAID IN FULL permit  11/8/2001  
Routing - PLAN CHECK11/5/2001 11/6/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/6/2001 PASS
Inspection Record Card- Bld  11/6/2001 DONE
Print Occupancy Form  11/6/2001 DONE
Telephone call  11/6/2001 DONE
left mess for john price that permit is ready
Plan assigned to (CJW)10/22/2001 11/6/2001 PASS
DetailsCarl Westfall
11/6/2001 09:17:42 CJW - activity updated through activity BLDA022 from case BLD01-02791.
Routing - FIRE11/1/2001 11/5/2001 PASS
Plan Review Completed(1st rev)  11/5/2001 PASS
Routing - PLAN CHECK10/26/2001 11/1/2001 PASS
UBC plan review started October 31, 2001 and finished the next day. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS10/25/2001 10/26/2001 PASS
Routing - PLANNING Land Div10/23/2001 10/25/2001 PASS
n/a - tenant improvement w/out expansion. FYI - this parcel is made up of a portion of Lot 4, Lot 5 & 6, Block 53 of the Boise City Original Townsite. If they expand, legal land division is not approved since they might be building over the 2 lot lines. The existing building was built in 1930. Routed to Public Works.
Plans ACCEPTED BY PLAN TECH  10/18/2001 DONE
First Notice10/17/200110/17/200110/17/2001 DONE
Application received  10/17/2001  
Recd Pcfee & Taken To Pln CK  10/17/2001 DONE