Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/27/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 10/18/2001 | 10/18/2001 | 4/27/2005 | | DONE |
|
|
|
|
First Notice | | 1/16/2004 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 1/16/2004 | 1/16/2004 | 1/16/2004 | A | PASS |
Russ Owen
|
|
|
Finaled by inspector at 1/16/2004 10:44:20 AM
|
BLD-Aging Inspection | 1/13/2004 | 1/13/2004 | 1/13/2004 | | DONE |
Russ Owen
|
|
|
THIS HAS ALLREADY BEEN FINALED. 1/16/2004 10:40:19 AM
|
BLD-Final | 6/19/2002 | 6/20/2002 | 6/20/2002 | A | PASS |
Russ Owen
|
|
|
JEFF ###-####. ok perm oc. 6/20/2002 1:38:16 PM
|
Letter of compliance | | | 6/20/2002 | | DONE |
|
|
|
Letter of Compliance #22526 issued 6-20-02.
|
FIRE-Final Inspection | 6/5/2002 | 6/6/2002 | 6/6/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 6/6/2002 3:02:36 PM
|
BLD-Final | 6/5/2002 | 6/6/2002 | 6/6/2002 | P | PART |
Russ Owen
|
|
|
###-####-jeff. Ok temp oc , only item left is office door hardware. 6/6/2002 3:15:53 PM
|
BLD-Final | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### jeff door hdw, special insp letter of completion, handrail, all signatures on card went over this with cont. 6/5/2002 3:35:48 PM
|
Code Occupancy Approval | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Approved 6/5/2002 2:48:14 PM
|
BLD-Conference | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PART |
Russ Owen
|
|
|
for conf- jeff- ###-#### . went over some handra 5/23/2002 12:52:26 PM ils. 5/23/2002 12:52:29 PM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 | P | PART |
Russ Owen
|
|
|
###-####. ok to drop tile. 4/26/2002 2:05:37 PM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PART |
Russ Owen
|
|
|
suspended ceiling insp -###-#### jeff . need to add some wires to a few lights, contractor will recall for next day. 4/25/2002 3:47:58 PM
|
BLD-Framing/Rough-in | 4/2/2002 | 4/3/2002 | 4/3/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 4/2/2002 5:23:58 PM walls ok , recall for ceiling. 4/3/2002 12:22:06 PM
|
BLD-Framing/Rough-in | 4/2/2002 | 4/2/2002 | 4/2/2002 | P | CANC |
Russ Owen
|
|
|
jeff -cell ###-#### partial fr
|
Override - Parcel Holds | | | 3/26/2002 | | |
|
|
|
|
Print Occupancy Form | | | 3/26/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/26/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/20/2002 | | 3/21/2002 | | PASS |
|
|
|
Plan modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2002 | | PASS |
|
|
|
Plan Modification
|
Override - Parcel Holds | | | 3/21/2002 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/21/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/21/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/21/2002 | | DONE |
|
|
|
permit ready
|
Plan assigned to (M_P) | 2/6/2002 | | 3/21/2002 | | PASS |
Mike Phillips
|
|
|
3/21/2002 09:43:33 M_P - activity updated through activity BLDA022 from case BLD01-02798.
|
Routing - PLANNING | 3/6/2002 | | 3/20/2002 | | PASS |
|
|
|
Plan Mod. Approved.
|
Routing - FIRE | 3/1/2002 | | 3/6/2002 | | PASS |
|
|
|
Plan Modification
|
BLD-Framing/Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PART |
Russ Owen
|
|
|
partial fr -jeff- cell ###-#### insulate above the glass walls ok. Note: 3rd Resubmital has not yet been approved. 3/5/2002 11:43:47 AM
|
Override - Parcel Holds | | | 3/4/2002 | | |
|
|
|
|
Plan resubmittals received | | | 2/28/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets A0-1, A0-2, A0.3, D1-1, A1-1, A2-1, A3-1, A4-1, A4-2, A4-3, A6-1, A7-1, A7-2, A7-3, A9-1, A9-2, S1.0, S2.0, S2.1, S3.0, M-0, M-1, M-2, P-1, E-1, E-2, E-3, E-4, E-5, E-6, E-7. Routed to Mike Phillips.
|
Routing - PLAN CHECK | 2/13/2002 | | 2/28/2002 | | PEND |
|
|
|
Plan Modification
Waiting for others to approve prior to issuing permit.
|
BLD-Footing | 2/14/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/14/2002 5:34:57 PM would like as close to 1pm as possible. 2/14/2002 5:36:40 PM FRONT ROUNDED ENTRY. 2/15/2002 5:21:10 PM
|
BLD-Footing | 2/14/2002 | 2/15/2002 | 2/14/2002 | P | CANC |
Russ Owen
|
|
|
Added by Inspector: 407 On 2/14/2002 5:31:45 PM would like as close to 1pm if possible.
|
BLD-Footing | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | PART |
Russ Owen
|
|
|
###-#### JEFF part the 2 new columns at the east side, need letter from the engineer for 2500 psi concretefor waiver of special inspection. 2/15/2002 1:43:30 PM
|
Override - Parcel Holds | | | 2/13/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: No inspections for work under PLAN MODIFICATION submitted on 2/6/02 until plan mod issued. Work to include under modification ( removal of exterior canopies and roof areas.) If questions contact Mike Phillips. Reason for OverRide:
|
Override - Parcel Holds | | | 2/13/2002 | | |
|
|
|
|
Routing - PLUMBING | 2/11/2002 | | 2/12/2002 | | PASS |
|
|
|
Plan Modification
|
Routing - PLANNING | 2/6/2002 | | 2/11/2002 | | PASS |
|
|
|
PLAN MOD> Approved.
|
Routing - PUBLIC WORKS | 2/11/2002 | | 2/11/2002 | | PASS |
|
|
|
Plan Modification
|
BLD-Foundation | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PART |
Russ Owen
|
|
|
###-#### late pm. Plans have been resubmited to the office work is being trimed back for cost reasons, the work to day is a short stem wall at the front of building which will have a glass curtain wall above to existing roof which support of roof is not affected, this will be new floor area of non-bearing walls. The resubmitals have not yet been approved I have advised the contractor that work is subject to approval by our office , proceed at your own risk. The architect had called me while he was in the our office, and he had been told that I would handle all changes I told him I could approve minor changes only And the extent of new work would require a plan submital to the office./2002 5:10:29 PM 2/7/2002 5:29:09 PM
|
Plan Modification Accepted | | | 2/6/2002 | | DONE |
|
|
|
Plan Modification accepted for Larry Miller Honda for the (1) Reduction of the canopy at service recept. from 20'-0" to 5'-0" (2) Reduction of the canopy depth at front from 10'-0" to 6'-0". Adjust support. (3) Redesign of canopy at delivery area. (4) Reduction of the overall height of parapet at the showroom (to exist's height). (5) Alteration of floor plan at customer waiting/parts counter/cashier/ASM. (6) Move General Manager's office to opposite side of showroom. Routed to Mike Phillips.
|
Issue PAID IN FULL permit | | | 1/23/2002 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 1/23/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/20/2001 | | 12/21/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/21/2001 | | |
|
|
|
|
Print Occupancy Form | | | 12/21/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2001 | | DONE |
|
|
|
permit ready and need ACHD
|
Plan assigned to (M_P) | 10/19/2001 | | 12/21/2001 | | PASS |
Mike Phillips
|
|
|
12/21/2001 08:48:47 M_P - activity updated through activity BLDA022 from case BLD01-02798.
|
Routing - PLAN CHECK | 11/21/2001 | | 12/20/2001 | | |
|
|
|
|
Routing - PLANNING | 12/20/2001 | | 12/20/2001 | | PASS |
|
|
|
Approved per DRH01-170 and as noted on Sheet A-01.
|
Plan resubmittals received | | | 12/13/2001 | | DONE |
|
|
|
Received two copies of stamped and signed sheets A0-1, A0-2, A0.3, D1-1, A1.1, A2.1, A3.1, A4.1, A4.2, A4.3, A6.1, A7.1, A7.2, A9.1, A9.2, S1.0, S2.0, S2.1, S3.0, M-0 (NOT SIGNED), M-1, M-2, P-1, E-1, E-2, E-3, E-4, E-5, E-6. One copy of the above plans not stamped or signed. Four copies of plan review response letter. Routed to Mike P. kmm
|
Plan Review Completed(1st rev) | | | 11/21/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 11/20/2001 | | 11/21/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/13/2001 | | 11/20/2001 | | FAIL |
|
|
|
Plan review completed and requesting additional information for further review prior to issuing permit.
|
Print Pending Permit.LaserJet4 | | | 11/20/2001 | | |
|
|
|
|
Routing - PLUMBING | 11/2/2001 | | 11/13/2001 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/19/2001 | | 11/5/2001 | | PASS |
|
|
|
contacted pdq to take plans to outside eng. KMM
No further review for outside engineering required. 11/5/01 MJP
|
Routing - PLANNING | 11/1/2001 | | 11/2/2001 | | FAIL |
|
|
|
Plans do not comply with minimum setbacks for the parking/auto display area along Gratz. Design Review condition of approval #1a states that site design work was not identified on the submitted D.R. plans, and that none was approved. The applicant will need to resubmit plans for proposed site work in order that Design Review can provide comments, as well as obtain a variance from the Planning and Zoning Commission for the substandard parking setback. Please note that condition #1b has also not been addressed.
|
Routing - PUBLIC WORKS | 10/26/2001 | | 11/1/2001 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/24/2001 | | 10/26/2001 | | PASS |
|
|
|
Routed to Public Works.
|
Telephone call | | | 10/24/2001 | | DONE |
|
|
|
Telephone call to Kevin Mass, asking for parcel #, and he hasnt got it as of this date. We will route to Planning-Land Division.dkl per kmm
|
Plan routing begun/NEW & ADDTN | | | 10/22/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/19/2001 | | PEND |
|
|
|
Waiting for additional parcel number. per Brandi C. kmm
|
Application received | | | 10/18/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/18/2001 | | DONE |
|
|
|
|