Description
To construct a three bedroom, two bathroom 1922 sq. ft. single story, single family dwelling with a 716 sq. ft. UNFINISHED basement, a attached 717 sq. ft. three car garage and a 70 sq. ft. covered back porch. A SEPARATE PERMIT REQUIRE TO FINISHED THE BASEMENT. Per approved plans, engineering and requirement list. PC#716 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/15/20022/19/20022/15/2002ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/15/2002 at 14:34:14. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/15/2002 at 15:32:23.
DOC - Permit Finaled2/15/20022/15/20022/15/2002PPASS
DetailsJim Sly
Finaled by inspector at 2/15/2002 3:38:32 PM
BLD-Final2/13/20022/15/20022/15/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/13/2002 at 09:31:17. Contact: ###-####. C/C issued. 2/15/2002 3:38:22 PM
BLD-Energy code compliance12/20/200112/21/200112/21/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/20/2001 at 11:02:20. Contact: ###-####.
BLD-Framing/Rough-in12/19/200112/20/200112/20/2001AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/19/2001 at 15:37:46. Contact: ###-####. Complete C/N 12/20/2001 9:53:15 AM
BLD-Framing/Rough-in12/20/200112/20/200112/20/2001AFAIL
DetailsJim Sly
Added by Inspector: 316 On 12/20/2001 10:29:02 AM C/N.......and Energy code previously passed by mistake.
BLD-Framing/Rough-in12/13/200112/17/200112/17/2001PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/13/2001 at 14:12:19. Contact: ###-####.c/n posted. 12/17/2001 4:11:54 PM
BLD-Wall cover12/3/200112/4/200112/4/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/03/2001 at 09:16:55. Contact: ###-####. Shear OK. 12/4/2001 8:59:01 AM
BLD-Footing11/5/200111/5/200111/5/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/05/2001 at 11:24:25. Contact: ###-####.
Issue PAID IN FULL permit  11/1/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/30/2001 DONE
Inspection Record Card- Bld  10/30/2001 DONE
Telephone call  10/30/2001 DONE
left mess that permit is ready
Routing - PLAN CHECK10/22/2001 10/30/2001 DONE
Plan assigned to (SAM)10/25/2001 10/30/2001 PASS
DetailsSteve Munroe
10/30/2001 10:29:02 SAM - activity updated through activity BLDA022 from case BLD01-02808.
Plan Reviewer's activity  10/26/2001 PEND
10/26/01 8:45 I called and left a message for Tim Johnson, the engineer, to call me regarding the concrete lintels. One of the lintels has a point load from a girder truss plus if there is a required depth for the lintels.
10/30/01 10:25 The engineer called me regarding the point load on the lintel. He wasn't concerned.
Pending Assignment by DJO10/19/2001 10/25/2001 DONE
DetailsDan Overy
10/25/2001 11:30:33 SAM - activity updated through activity BLDA183 from case BLD01-02808.
Print Pending Permit.LaserJet4  10/25/2001  
Plan Review Report  10/25/2001  
Routing - PLANNING10/19/2001 10/22/2001 PASS
Routing - PUBLIC WORKS10/22/2001 10/22/2001 PASS
Application received  10/19/2001