Fee Review-notes | 7/14/2003 | 7/14/2003 | 7/14/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/17/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #4872 issued 12-17-02 to Summer Wind Retirement & Assisted Living.
|
Permanent Occupancy | | 12/16/2002 | 12/16/2002 | | DONE |
|
|
|
|
BLD-Final | 12/13/2002 | 12/16/2002 | 12/16/2002 | A | PASS |
Steven Webb
|
|
|
###-#### Fire final passed on 12/13/02-regular C. of O can be issued. 12/16/2002 8:49:04 AM
|
FIRE-Final Inspection | 12/13/2002 | 12/16/2002 | 12/16/2002 | A | CANC |
Troy Cobbley
|
|
|
inspection already done 12/16/2002 10:55:34 AM
|
FIRE-Final Inspection | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | PASS |
Troy Cobbley
|
|
|
fire alarm finaled
|
Temporary occupancy | | | 10/7/2002 | | DONE |
|
|
|
issued to Summer Wind Retirement #4872
|
BLD-Final | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok for temp occ 10/3/2002 9:07:34 AM
|
FIRE-Final Inspection | 10/3/2002 | 10/3/2002 | 10/3/2002 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given on the fire alarm system per Dave Miller's approval until the additional strobes are added in the rooms and the existing horn/strobes in the rooms are relocated
|
PubWorks Occupancy Approval | 9/5/2002 | 9/5/2002 | 9/5/2002 | | DONE |
|
|
|
Drainage project found complete 9/4/02. R.Cummings
|
Override - Parcel Holds | | | 9/5/2002 | | |
|
|
|
|
BLD-Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | FAIL |
Tony Young
|
|
|
jerry -###-####
need trades signed off 1st 9/4/2002 10:51:42 AM
|
Override - Parcel Holds | | | 9/3/2002 | | |
|
|
|
|
BLD-Other | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | NR |
Dave Hannah
|
|
|
jerry ###-#### please call before going out contractor still working on 1 hr around elec boxs 7/24/2002 4:05:17 PM
|
Override - Parcel Holds | | | 7/24/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | FAIL |
Russ Owen
|
|
|
JIM ###-####
c/n posted, also noted 2 electrical panels in 1 hr corridor, and no top plate protection. 7/19/2002 10:37:20 AM
|
Override - Parcel Holds | | | 7/18/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PART |
Tony Young
|
|
|
###-#### jim
insulation ok,, ok to rock pending mech. ok/// then call for nailing on 1st layer of rock 7/10/2002 4:32:06 PM
|
| | | 7/10/2002 | | DONE |
Rita DeYoung
|
|
|
Parcel Tag Notes: OK to issue building permit, but DO NOT issue Certificate of Occupancy until Healthcare Subdivision is recorded. Contact Subdivisions staff to verify. (blc) Reason for OverRide:
|
| | | 7/10/2002 | | DONE |
Rita DeYoung
|
|
|
Parcel Tag Notes: OK to issue building permit, but DO NOT issue Certificate of Occupancy until Healthcare Subdivision is recorded. Contact Subdivisions staff to verify. (blc) Reason for OverRide:
|
BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | FAIL |
Tony Young
|
|
|
jim- ###-#### r/i
c/n,, ok to insulate 7/10/2002 12:51:21 PM
|
| | | 7/8/2002 | | DONE |
Marsha Smylie
|
|
|
Parcel Tag Notes: OK to issue building permit, but DO NOT issue Certificate of Occupancy until Healthcare Subdivision is recorded. Contact Subdivisions staff to verify. (blc) Reason for OverRide:
|
Override - Parcel Holds | | | 7/8/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | FAIL |
Jim Sly
|
|
|
jim- ###-####-fr insp C/N on site. 7/2/2002 3:42:39 AM
|
Override - Parcel Holds | | | 7/1/2002 | | |
|
|
|
|
FIRE-Final Inspection | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PART |
Troy Cobbley
|
|
|
Inspection was not for a final. Inspection was for a tenting inspection. Tenting is OK. Sprinklers OK for cover 6/28/2002 4:04:37 PM
|
BLD-Framing/Rough-in | 6/26/2002 | 6/27/2002 | 6/27/2002 | P | NR |
Tony Young
|
|
|
jim- ###-#### fr
|
| | | 6/27/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: OK to issue building permit, but DO NOT issue Certificate of Occupancy until Healthcare Subdivision is recorded. Contact Subdivisions staff to verify. (blc) Reason for OverRide:
|
Override - Parcel Holds | | | 6/26/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 | P | NR |
Tony Young
|
|
|
JIM ###-#### R/I
|
FIRE-Sprinkler Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 | A | FAIL |
Rick Jackson
|
|
|
JIM- ###-#### R/I insulation needs to be stapled to joist or secured 6/25/2002 8:26:12 AM
|
Override - Parcel Holds | | | 6/24/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 6/24/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 6/24/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 | P | PART |
Tony Young
|
|
|
ext. shear ok, verify alt. hds at frame 5/29/2002 4:52:40 PM
|
BLD-Framing/Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | CANC |
Tony Young
|
|
|
###-#### jim
|
Override - Parcel Holds | | | 5/28/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | FAIL |
Tony Young
|
|
|
JIM ###-#### SHEER NAILING
not nailed per plan, and 2 hds are under window, called jim 5/23/2002 9:42:23 AM
|
Override - Parcel Holds | | | 5/22/2002 | | |
|
|
|
|
BLD-Foundation | 4/2/2002 | 4/3/2002 | 4/3/2002 | A | PART |
Tony Young
|
|
|
late am ###-####
wip 4/3/2002 12:48:14 PM
|
BLD-Foundation | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PART |
Tony Young
|
|
|
###-#### MIKE
ftgs ok, cleared up differences between arch. drawing and engineering on size of ftgs, also depth of frost level,,,all ok 4/2/2002 10:19:20 AM
|
Override - Parcel Holds | | | 4/2/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 4/1/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: OK to issue building permit, but DO NOT issue Certificate of Occupancy until Healthcare Subdivision is recorded. Contact Subdivisions staff to verify. (blc) Reason for OverRide:
|
Override - Parcel Holds | | | 3/22/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/22/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/28/2002 | | 3/21/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/21/2002 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/21/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/21/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/21/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/21/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/21/2002 | | DONE |
|
|
|
Gerald Teal- called permit ready, fees due and need ACHD
|
Plan assigned to (M_P) | 10/24/2001 | | 3/21/2002 | | PASS |
Mike Phillips
|
|
|
3/21/2002 09:12:40 M_P - activity updated through activity BLDA022 from case BLD01-02828.
|
Routing - PLANNING | 3/7/2002 | | 3/7/2002 | | PASS |
|
|
|
Approved as per CAR01-00045DA.
|
Routing - FIRE | 1/25/2002 | | 1/28/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/25/2002 | | 1/25/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2002 | | 1/25/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/3/2001 | | 1/18/2002 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 1/15/2002 | | DONE |
|
|
|
Received two copies of revised sheets A0-1, A1-1, A2-1, A2-2, A2-4. A2-5. A4-1, A6-1, A7-1, A7-3, P-1, E1-0, one copy of cover letter, response letter and copy of USG Gypsum sheathing information. Routed to Mike P. kmm
|
Routing - FIRE | 11/29/2001 | | 12/3/2001 | | FAIL |
|
|
|
HYDRANT LOCATION
|
Routing - PLAN CHECK | 11/14/2001 | | 11/29/2001 | | FAIL |
|
|
|
Plan review completed requesting additional information for further review.
|
Override - Parcel Holds | | | 11/29/2001 | | |
|
|
|
|
Routing - PLUMBING | 11/2/2001 | | 11/14/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 11/1/2001 | | 11/2/2001 | | FAIL |
|
|
|
Requires approval and recording of new Development Agreement (CAR01-00045/DA) prior to issuance of building permit. Condition #10 in CUP01-00084.
|
Routing - PUBLIC WORKS | 10/27/2001 | | 11/1/2001 | | FAIL |
|
|
|
Requires drainage plan revision (additional) per Brian M. KMM
|
Routing - PLANNING Land Div | 10/24/2001 | | 10/27/2001 | | FAIL |
|
|
|
Needs chain of deeds to verify legal land division. Routed to Public Works.
|
Plans ACCEPTED BY PLAN TECH | | | 10/26/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2001 | | PEND |
|
|
|
Requires: 1. Sheets A2-4 and A3-1 to be signed.
2. Three extra civil sheets.
3. O & M plan
Contacted Jerry Teal of these needs. kmm
|
Plan routing begun/NEW & ADDTN | | | 10/24/2001 | | DONE |
|
|
|
|
First Notice | 10/23/2001 | 10/23/2001 | 10/23/2001 | | DONE |
|
|
|
|
Application received | | | 10/23/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/23/2001 | | DONE |
|
|
|
|