BLD-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 | | PASS |
Jim Storey
|
|
|
passed on 10/18/02 12/9/2003 8:10:28 AM
|
DOC - Permit Finaled | 12/9/2003 | 12/9/2003 | 12/9/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 12/9/2003 8:14:56 AM
|
Permanent occupancy UNPAID FEE | | | 10/23/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9417 issued 10-23-02 to the Micron Mask Shop.
|
Permanent Occupancy | | 10/18/2002 | 10/18/2002 | | DONE |
|
|
|
|
BLD-Final | 10/17/2002 | 10/18/2002 | 10/18/2002 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 10/17/2002 | 10/17/2002 | 10/17/2002 | P | CANC |
Jim Storey
|
|
|
###-#### les
|
BLD-Final | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | FAIL |
Jim Storey
|
|
|
missing 3 inch plastic pipe collor at h-3 occ. 10/15/2002 10:39:43 AM
|
BLD-Final | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | NR |
Jim Storey
|
|
|
|
BLD-Final | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | NR |
Jim Storey
|
|
|
|
Code Occupancy Approval | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Approved 10/14/2002 2:57:45 PM
|
BLD-Final | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | NR |
Jim Storey
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | NR |
Jim Storey
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PASS |
Rick Jackson
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 10/8/2002 | 10/9/2002 | 10/9/2002 | P | FAIL |
Jim Storey
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie h2 wall protection/ door grout/ wire glazing sub fab. 10/9/2002 3:53:46 PM
|
FIRE-Final Inspection | 10/8/2002 | 10/9/2002 | 10/9/2002 | P | CANC |
Rick Jackson
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 10/3/2002 | 10/4/2002 | 10/4/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### LES fire stop new shower water line in chem room; EQ main sprinkler riser 10/4/2002 4:53:45 PM
|
FIRE-Final Inspection | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | NR |
Rick Jackson
|
|
|
FN LES ###-#### met with Les and will have to test the alarms; will reschedule 10/3/2002 10:16:30 AM
|
FIRE-Alarm Testing | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PART |
Rick Jackson
|
|
|
LES AND FINAL; Phone #: ###-#### okay to occupy/use the subfab HPM corridor and third floor corridors per letter from Earthtech 8/8/2002 4:21:21 PM
|
BLD-Other | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Jim Storey
|
|
|
LES ; Phone #: ###-####temp occ of hpm area and upper and lower fab space. card on file with scope of areas. 8/8/2002 4:23:16 PM
|
BLD-Final | 8/6/2002 | 8/7/2002 | 8/7/2002 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/06/2002 at 13:19:22. Contact: ###-####.fire chalk/ door closer/ exit sign/ fire wrap band and termanation atchement. 8/7/2002 4:46:50 PM
|
FIRE-Final Inspection | 8/6/2002 | 8/7/2002 | 8/7/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/06/2002 at 13:20:06. Contact: ###-####. met with Les and Jim Story to go over the requirements for the next phase of occupancy - fan deck and HPM corridor; will need dampers/detectors working on fan deck, exit signs and doors installed per metting with Les in HPM corridor 8/7/2002 5:01:58 PM
|
BLD-Final | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | PART |
Jim Storey
|
|
|
10:00 am apointment. temp occ for exit path around fab on first floor and all stair inclosers.for tool instal in the fab. no chem load in the bldg. with out approval and sign off for total bldg. occ. 8/2/2002 1:04:24 PM
|
FIRE-Final Inspection | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | PART |
Rick Jackson
|
|
|
###-#### with Jim Storey; approved use of corridor on level one and stair towers 8/2/2002 1:32:53 PM
|
BLD-Final | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PART |
Jim Storey
|
|
|
Las; Phone #: ###-####
|
BLD-Final | 7/25/2002 | 7/26/2002 | 7/26/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 13:09:21. Contact: ###-####.ul chem valve isue. 7/26/2002 1:48:52 PM
|
FIRE-Final Inspection | 7/25/2002 | 7/26/2002 | 7/26/2002 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 13:14:28. Contact: ###-####. received a call from Jim Storey to cancel 7/26/2002 3:44:05 PM
|
FIRE-Final Inspection | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/18/2002 at 13:58:00. Contact: ###-####. tested the VSES and EAS - okay; still not ready for final - lighting; exit signs; extension cords; etc. 7/19/2002 10:10:14 AM
|
BLD-Final | 7/18/2002 | 7/19/2002 | 7/19/2002 | P | PART |
Jim Storey
|
|
|
LES; Phone #: ###-####office only per condition list/ 7/19/2002 4:30:14 PM
|
FIRE-Final Inspection | 7/22/2002 | 7/19/2002 | 7/19/2002 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/22/2002 9:56:40 AM okay to occupy offices areas as identified on letter from Micron; the areas approved on letter are the only areas to occupy
|
BLD-Final | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 13:40:45. Contact: ###-####.doors and fire stopping/ chem room wall repair, 7/18/2002 12:29:02 PM
|
FIRE-Alarm Testing | 7/17/2002 | 7/17/2002 | 7/17/2002 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/17/2002 10:33:11 AM completed alarm testing; panel in trouble due to main board problem; vses and eas not complete;
|
FIRE-Final Inspection | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | FAIL |
Rick Jackson
|
|
|
LES ###-#### strobes obstructed in fan deck level; will continue av testing 7/17; all devices tested okay - complete with all device testing; exiting from subfab into stairs obstructed by plastic sheeting; need walls to conceal open areas between RF's in subfab; 7/16/2002 6:12:07 PM
|
FIRE-Final Inspection | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 09:35:09. Contact: ###-####. continued to test the alarms; will continue on 7/16 7/16/2002 9:48:21 AM
|
BLD-Framing/Rough-in | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | FAIL |
Jim Storey
|
|
|
les ###-#### fr les ###-#### fr insulated piping not per asslembly. 7/15/2002 5:19:19 PM
|
BLD-Other | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | CANC |
Jim Storey
|
|
|
temp occup ###-#### les called and will resch. 7/12/2002 4:23:41 PM
|
FIRE-Final Inspection | 7/10/2002 | 7/12/2002 | 7/12/2002 | A | FAIL |
Rick Jackson
|
|
|
###-#### started testing detectors - didn't shut down MAU's; will continue on 7/15 7/12/2002 3:44:29 PM
|
BLD-Framing/Rough-in | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | NR |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | NR |
Jim Storey
|
|
|
###-#### les
|
FIRE-Final Inspection | 7/10/2002 | 7/11/2002 | 7/11/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### tested pull stations and sprinkler tampers/flows; labels for some pull stations not correct 7/11/2002 4:34:40 PM
|
FIRE-Conference | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 13:06:40. Contact: ###-####. met with GC about getting leter in for temporary occupancy to Dave Miller 7/10/2002 11:00:04 AM
|
BLD-Framing/Rough-in | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | FAIL |
Jim Storey
|
|
|
fr les- ###-#### fr les- ###-#### chem trays not per listing 2 hr not patched. 7/9/2002 3:49:46 PM
|
BLD-Framing/Rough-in | 7/2/2002 | 7/3/2002 | 7/3/2002 | A | PART |
Jim Storey
|
|
|
ceiling insp- les- ###-#### main office only 7/3/2002 10:22:37 AM
|
BLD-Framing/Rough-in | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PART |
Jim Storey
|
|
|
les- ###-####fr inspclean rm ceilling grid ok/ fire wall at rain leader needs patch at unastrut and chec pipe penatration. 7/1/2002 3:45:03 PM
|
BLD-Framing/Rough-in | 6/24/2002 | 6/25/2002 | 6/25/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### LES fire stopping. 6/25/2002 4:04:07 PM
|
BLD-Framing/Rough-in | 6/18/2002 | 6/19/2002 | 6/19/2002 | A | PART |
Jim Storey
|
|
|
###-#### ###-####2 hr north ele penatration next to duct. 6/19/2002 5:24:31 PM
|
BLD-Framing/Rough-in | 6/17/2002 | 6/18/2002 | 6/18/2002 | P | CANC |
Jim Storey
|
|
|
FIRE WALL ###-#### LES called work not done will re-sch. 6/18/2002 2:51:14 PM
|
Override - Condition Holds | | | 6/18/2002 | | |
|
|
|
|
Override - Condition Holds | | | 6/18/2002 | | |
|
|
|
|
BLD-Other | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | CANC |
Jim Storey
|
|
|
###-#### ###-#### less called and cancled. 6/14/2002 3:27:50 PM
|
Inspection Record Card- Bld | | | 6/12/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/12/2002 | | DONE |
|
|
|
|
FIRE-Conference | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PART |
Rick Jackson
|
|
|
###-#### met with Les and went over exit signs and requirements for occupancy; reviewed alarm plans and locations of devices; will need additional strobes in main electrical room and dectector for damper in boiler room wall 6/12/2002 7:39:01 AM
|
BLD-Framing/Rough-in | 3/13/2002 | 6/6/2002 | 6/6/2002 | A | NR |
Jim Storey
|
|
|
###-#### or ###-#### Les c/n stands. 6/6/2002 12:06:39 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 5/30/2002 | 5/30/2002 | A | NR |
Jim Storey
|
|
|
###-#### or ###-#### Les ###-#### or wip.###-#### Les 5/30/2002 12:53:47 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 5/23/2002 | 5/23/2002 | A | PART |
Jim Storey
|
|
|
###-#### or ###-#### Les all lateral bracing ok in all exterior ok to cover balance of interior side of walls./ raillroad seam and new ele penatration in east side of 2 hr wall north end./ drinking foutian in 2 hr wall c/n resolved / srair 6 wall alinment needed to maintaine wall assemblie./ ele fire stopping submitals pending review. 5/23/2002 11:59:39 AM
|
BLD-Framing/Rough-in | 5/17/2002 | 5/17/2002 | 5/17/2002 | P | PASS |
Jim Storey
|
|
|
les ###-####south 2 nd floor exterior wall ok for cover and north 2nd floor / west stair mech shaft wall and stair incloser ok for cover fire stopping ok. 5/17/2002 3:59:39 PM
|
FIRE-Conference | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | CANC |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/15/2002 12:41:19 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 5/16/2002 | 5/16/2002 | A | NR |
Jim Storey
|
|
|
###-#### or ###-#### Les
|
BLD-Framing/Rough-in | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | PART |
Jim Storey
|
|
|
###-#### les ###-#### lesrain leader at 2 hr wall gyp repair ok 5/14/2002 9:35:57 AM
|
BLD-Framing/Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | FAIL |
Jim Storey
|
|
|
LES ###-#### OR ###-#### c/n stands. 5/10/2002 11:23:19 AM
|
BLD-Framing/Rough-in | 3/13/2002 | 5/9/2002 | 5/9/2002 | A | NR |
Jim Storey
|
|
|
###-#### or ###-#### Les c/n stands. 5/9/2002 10:40:53 AM
|
BLD-Energy code compliance | 5/3/2002 | 5/7/2002 | 5/7/2002 | A | PART |
Jim Storey
|
|
|
###-#### ###-####west side of 2 hr wall assemblie ok/ 5/7/2002 11:24:35 AM
|
BLD-Conference | 5/7/2002 | 5/7/2002 | 5/7/2002 | A | FAIL |
Jim Storey
|
|
|
1. (Wall through penetrations that prevent passage of flame & hot gases) Where the penetrating items are steel, ferrous, or copper pipes or steel conduits, the material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste when subjected to 1997 UBC Standard 7-1 time-temperature fire conditions under a minimum positive pressure differential of 0.01 inch of water column at the location of the penetration for the time period equivalent to the fire rating of the construction penetrated. (1997 UBC 709.6.1 Exception #2)
2. (Wall membrane penetrations) Membrane penetrations of fire-resistive walls shall comply with 1997 UBC Section 709.6 as required for wall through penetrations. (1997 UBC 709.7)
3. submit fire stopping listing for all trades for insp.
|
BLD-Wall cover | 5/2/2002 | 5/3/2002 | 5/3/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### LES 2 hr wall /rain leader/seam lap and screw sch./box and fire shuder in loby corridor. 5/3/2002 4:42:58 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 5/2/2002 | 5/2/2002 | A | FAIL |
Jim Storey
|
|
|
1. (Fire-resistive walls) Fire-resistive walls and partitions shall be assumed to have the fire-resistance ratings set forth in 1997 UBC Table 7-B. (1997 UBC 709.1) Generic fire-resistance ratings (those not designated as PROPRIETARY in the listing) in the "Fire-Resistance Design Manual", Fourteenth Edition, dated April 1994, as published by the Gypsum Association, may also be accepted. (1997 UBC Table 7-B footnote a) Selected systems shall be completely described or detailed on the drawings (including attachments).butt joints and lap distances not achived on 2 hr wall on g line as well as screw sch. remove finsh layer and repair.
|
BLD-Framing/Rough-in | 3/13/2002 | 4/25/2002 | 4/25/2002 | A | FAIL |
Jim Storey
|
|
|
4/25/2002 1:18:06 PM gyp on area septration wa;ll at each end needs lap of 24 horrizontal. 4/25/2002 1:46:20 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 4/18/2002 | 4/18/2002 | A | FAIL |
Jim Storey
|
|
|
1. (Stairway rise and run) The rise of steps and stairs shall not be less than 4 inches nor more than 7 inches. The greatest riser height within any flight of stairs shall not exceed the smallest by more than 3/8 inch. Except as permitted for circular, winding, and spiral stairways, the run shall not be less than 11 inches as measured horizontally between the vertical planes of the furthermost projection of adjacent treads or nosings. Stair treads shall be of uniform size and shape, except the largest tread run within any flight of stairs shall not exceed the smallest by more than 3/8 inch. (1997 UBC 1003.3.3.3) Note the exception to tread and riser dimensions for private stairways and stairways to unoccupied roofs and. Also, note the exception to dimensions of risers adjoining a sloping public way. 2. need engineering for previous c/n.
|
BLD-Concrete | 4/16/2002 | 4/16/2002 | 4/16/2002 | P | FAIL |
Jim Storey
|
|
|
lap splice at 3/e not achived at cold joint. provide splice or engineered repair.
|
BLD-Framing/Rough-in | 3/13/2002 | 4/11/2002 | 4/11/2002 | A | CANC |
Jim Storey
|
|
|
###-#### or ###-#### Les
|
BLD-Concrete | 4/4/2002 | 4/4/2002 | 4/4/2002 | P | PART |
Jim Storey
|
|
|
rebar les- ###-#### covered with special insp 4/5/2002 7:36:16 AM
|
BLD-Framing/Rough-in | 3/13/2002 | 4/4/2002 | 4/4/2002 | A | PART |
Jim Storey
|
|
|
###-#### or ###-#### Les pending special inspction. 4/4/2002 12:10:30 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 4/4/2002 | 4/4/2002 | A | CANC |
Jim Storey
|
|
|
###-#### or ###-#### Les
|
BLD-Framing/Rough-in | 3/13/2002 | 3/28/2002 | 3/28/2002 | A | PART |
Jim Storey
|
|
|
###-#### or ###-#### Les roof decks ok 3/28/2002 4:41:54 PM
|
BLD-Framing/Rough-in | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PART |
Jim Storey
|
|
|
###-#### LES c/n made ok archived info from engoineer into file/cup roof deck welding ok pending special insp. report on area not complet./diphram on office roof to be checed thursday. 3/25/2002 4:10:18 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 3/21/2002 | 3/21/2002 | A | PART |
Jim Storey
|
|
|
###-#### or ###-#### Les c/n stands.wip 3/21/2002 11:00:39 AM
|
BLD-Concrete | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Jim Storey
|
|
|
###-#### ok pending si report. 3/18/2002 3:54:11 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | FAIL |
Jim Storey
|
|
|
###-#### or ###-#### Les c/n missing hair pin at n/4 . steel fit up justify substanal contact peramitor by engineer./ rfi to prefab to spec. diphram screw sch. 3/14/2002 10:30:40 AM 3/14/2002 10:35:39 AM
|
Routing - PLAN CHECK | 1/28/2002 | | 2/5/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/5/2002 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 2/5/2002 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 10/25/2001 | | 2/5/2002 | | PASS |
John Menard
|
|
|
2/5/2002 08:20:11 JCM - activity updated through activity BLDA022 from case BLD01-02848.
|
Routing - FIRE | 1/28/2002 | 1/28/2002 | 1/28/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 12/19/2001 | | 1/28/2002 | | |
|
|
|
|
Plan resubmittals received | | | 1/25/2002 | | DONE |
|
|
|
Received two copies of revised sheets A2.B.1, A2.BD.1, A2.1.1, A2.1A.1 One copy of transmittal letter. Routed to John M. KMM
|
Plan Reviewer's activity | | | 1/25/2002 | | PASS |
|
|
|
Reviewed and approved revised plans as submitted. JCM
|
Plan resubmittals received | | | 1/7/2002 | | DONE |
|
|
|
1. Received comment letter addressed to John Menard. Routed to John Menard.
2. Received comment letter addressed to Bill Alexander with Memorandum for chemical quantities. routed to John Menard.
|
Routing - FIRE | 12/14/2001 | 12/19/2001 | 12/19/2001 | | FAIL |
Bill Alexander
|
|
|
Emailed requirements to Paul Marcolina-Micron.
|
Plan resubmittals requested | | | 12/14/2001 | | |
|
|
|
Mailed James Wurscher and copied Paul Marcolina on a letter requesting additional revisions. JCM
|
Routing - PLAN CHECK | 12/3/2001 | | 12/14/2001 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 12/11/2001 | | DONE |
|
|
|
Received two sets of plan resubmittal sheets PP0.02, PP2.B.2, PP2.BA.2, PP2.BB.2, PP2.BD.2, PP2.U.2, PP2.UA.1, PP2.UB.1, PP2.1.2, PP2.1A.1, PP2.1B.2, PP2.1C.2, pp2.1D.2, PP2.3.1, PP2.3A.1, PP2.3B.1, PP2.3C.1, PP2.3D.1, PP2.4.1, PP4.01, PP4.02, PP4.03, PP4.04, PP4.05, PP4.06, PP4.07, PP4.08, PP5.01, PP5.02, PP5.03. Routed to John Menard.
|
Plan resubmittals received | | | 12/10/2001 | | DONE |
|
|
|
Received two sets of resubmittal sheets A2.BA.1, A2.BD.1, A2.1.1, A2.1A.1, A2.1B.1, A2.1C.1, A2.1D.1, A2.3.1, A2.3A.1, A2.3B.1, A2.3C.1, A2.3D.1, A2.4C.1, A7.01, A8.02, A8.05, a8.06 WITH RESPONSE LETTER AND COPIES OF CHANGE IN WORK REQUEST. Routed to John Menard.
|
Routing - FIRE | 11/30/2001 | 12/3/2001 | 12/3/2001 | | FAIL |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 12/3/2001 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/30/2001 | | |
|
|
|
E-mailed Paul Marcolina at Micron a copy of the review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 11/19/2001 | | 11/30/2001 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 11/29/2001 | | 11/29/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 11/7/2001 | | 11/19/2001 | | PASS |
|
|
|
all vents shall be piped to the exterior or scrubber duct, example = 4 page PP4.08 1" vent to room, per plans and 2000 upc.
|
Routing - PLANNING | 11/5/2001 | | 11/7/2001 | | PASS |
|
|
|
Approved per DRH01-127.
|
Routing - PUBLIC WORKS | 10/29/2001 | | 11/5/2001 | | FAIL |
|
|
|
Need flow data for processing to finish sewer fee calcs per Jon Williams.
|
Routing - PLANNING Land Div | 10/25/2001 | | 10/29/2001 | | PASS |
|
|
|
OK - section land > 5 acres, not building over property lines. Routed to Public Works.
|
Plans ACCEPTED BY PLAN TECH | | | 10/25/2001 | | DONE |
|
|
|
|
Plan routing begun/TENANTS | | | 10/25/2001 | | DONE |
|
|
|
|
First Notice | 10/24/2001 | 10/24/2001 | 10/24/2001 | | DONE |
|
|
|
|
Application received | | | 10/24/2001 | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
|