BLD-Aging Inspection | 7/4/2005 | 7/4/2005 | 7/6/2005 | | CANC |
Jim Sly
|
|
|
Expired
|
DOC - Permit Expired | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | PASS |
Jim Sly
|
|
|
As per Dave Hannah ... I assume Dave did the research when he finaled this permit. He stated that the scope of work was transferred to a 2002 permit and was part of a phased construction.
|
Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Final | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/13/2002 at 10:02:21. Contact: ###-####. ok for occ the work on this permit is now under a 2002 permit this was phase one of a three part remodel 3/14/2002 9:34:48 AM
|
FIRE-Final Inspection | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Troy Cobbley
|
|
|
Fire life safety finaled. FIRE ALARM SYSTEM NOT FINALED 3/13/2002 3:51:12 PM
|
FIRE-Final Inspection | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | NR |
Troy Cobbley
|
|
|
exit signs and fire extinguishers need to be installed 3/11/2002 11:26:57 AM
|
BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 | P | CANC |
Dave Hannah
|
|
|
jim ###-#### fn occ temp
|
BLD-Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 17:18:24. Contact: ###-####. needs other trades sing offs 3/8/2002 3:27:55 PM
|
BLD-Framing/Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 | P | PASS |
Russ Owen
|
|
|
ceiling grid\\###-#### jim
|
BLD-Framing/Rough-in | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/08/2002 at 13:11:17. Contact: ###-####.west wall ok. 2/11/2002 11:12:12 AM
|
BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 16:43:50. Contact: ###-####. steel studs infill of roll up doors insulated and one layer of rock on one side ok to add next layer of rock this is a 2hr wall 1/30/2002 10:04:51 AM
|
Issue PAID IN FULL permit | | | 1/7/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/26/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/26/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/26/2001 | | DONE |
|
|
|
permit ready
|
Routing - PLAN CHECK | 11/14/2001 | | 11/21/2001 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2001 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 11/1/2001 | | 11/21/2001 | | PASS |
Carl Westfall
|
|
|
11/21/2001 11:54:52 CJW - activity updated through activity BLDA022 from case BLD01-02863.
|
Plan resubmittals received | | | 11/20/2001 | | DONE |
|
|
|
Received two sets of resubmittal sheets A-1, and A-2. Routed to Carl Westfall.
|
Routing - FIRE | 11/9/2001 | | 11/14/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 11/14/2001 | | |
|
|
|
Failed first UBC review.
|
Routing - PLAN CHECK | 11/2/2001 | | 11/9/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started November 7, 2001 and finished November 9, 2001. A response was required from the architect. See the conditions list.
|
Routing - PLANNING Land Div | 11/1/2001 | | 11/2/2001 | | PASS |
|
|
|
n/a - tenant improvement w/out expansion. **There is still a lot line under the building so if they expand later, they will have to do a density reduction ROS to remove it. E-mailed Kathy M. to correct parcel # in all cases. Routed to Public Works.
|
Routing - PUBLIC WORKS | 11/2/2001 | | 11/2/2001 | | PASS |
|
|
|
|
Application received | | | 10/26/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/26/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/26/2001 | | DONE |
|
|
|
|
Fee Review-notes | 10/26/2001 | 10/26/2001 | | | |
|
|
|
|