BLD-Final | 11/1/2002 | 11/4/2002 | 11/4/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 16:00:12. Contact: ###-####.
|
DOC - Permit Finaled | 11/4/2002 | 11/4/2002 | 11/4/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 11/4/2002 4:18:02 PM
|
BLD-Final | 10/31/2002 | 11/1/2002 | 11/1/2002 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/31/2002 at 15:46:36. Contact: ###-####.
|
BLD-Final | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | NR |
Tony Young
|
|
|
|
BLD-Final | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | NR |
Tony Young
|
|
|
|
BLD-Final | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 10:33:01. Contact: ###-####....keep c/n, need elec, pool eng'g... 10/29/02 9:26:07 AM
|
BLD-Grading Inspection | 10/24/2002 | 10/24/2002 | 10/24/2002 | | BOND |
Rita DeYoung
|
|
|
Grading and drainage have been completed. Revegetation is not complete but a $400.00 bond has been submitted to ensure satisfactory completion. Therefore, the grading is conditionally approved.
|
BLD-Concrete | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 08:13:49. Contact: ###-####. city approved plans call for the pool tobe 8" cast in place concrete/shot crete with #4s at 12" oc ew contracter has a cast in place bottom with cmu walls need engineering for walls 6/19/2002 3:03:57 PM
|
BLD-Footing | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 10:09:04. Contact: ###-####. bottom of pool needs engineering for sides of pool 5/16/2002 3:56:43 PM
|
BLD-Wall cover | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 09:32:50. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 08:50:34. Contact: ###-####.
ok to insulate, unaffected areas only, c/n still posted 5/10/2002 3:57:33 PM
|
BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | FAIL |
Jim Storey
|
|
|
1. (Fire blocks and draft stops) In combustible construction, fireblocking and draftstopping shall be installed to cut off all concealed draft openings (both vertical and horizontal) and shall form an effective barrier between floors, between a top story and a roof or attic space, and shall subdivide attic spaces, concealed roof spaces and floor-ceiling assemblies. The integrity of all fire blocks and draft stops shall be maintanined. (1997 UBC 708.1)
2. need fire place permit and insp./ return air in exterior wall cavity must meet engery code report/ 4 " dryer duct must be in 4" wall space.
|
BLD-Conference | 4/25/2002 | 4/26/2002 | 4/26/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 14:58:15. Contact: ###-####.
conf. on framing 4/26/2002 10:51:59 AM
|
BLD-Framing/Rough-in | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 08:26:41. Contact: ###-####.ext shear nailing ok 2/12/2002 7:37:45 AM
|
BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 11:35:24. Contact: ###-####.
not complete 2/7/2002 11:17:38 AM
|
BLD-Foundation | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 11:23:33. Contact: ###-####.
rear/west retaining wall 1/29/2002 2:57:37 PM
|
BLD-Footing | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 15:00:46. Contact: ###-####. owner bldr has photos...soi 1/15/2002 12:28:22 PM ls report not onsite; east portion previously poured & insp'd 1/15/2002 12:30:33 PM
|
BLD-Footing | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 09:55:48. Contact: ###-####.
int. ftgs ok 1/11/2002 3:28:20 PM
|
BLD-Grading Inspection | 12/20/2001 | 12/20/2001 | 12/20/2001 | | PASS |
Rita DeYoung
|
|
|
The geotechnical engineer has approved the subgrade for all of the house footings and the retaining wall on the east side of the house.
|
BLD-Footing | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 11:18:18. Contact: ###-####.wip 12/19/2001 4:08:36 PM
|
BLD-Footing | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 16:44:27. Contact: ###-####. northeast retaining wall footing 12/13/2001 11:04:26 AM
|
BLD-Footing | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 11:01:01. Contact: ###-####.done by 408 already 12/13/2001 3:45:36 PM
|
BLD-Foundation | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 08:23:12. Contact: ###-####.
8' wall, wip, ok when ready for wall only, no ftgs yet 12/10/2001 2:18:47 PM
|
BLD-Footing | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 08:50:46. Contact: ###-####.ok for part of rear retaining wall ftg pending soil report, pass 12/4/2001 10:12:09 AM
|
Inspection Record Card- Bld | | | 11/20/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/20/2001 | | DONE |
|
|
|
permit ready
|
Issue PAID IN FULL permit | | | 11/20/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 11/19/2001 | 11/19/2001 | 11/19/2001 | | PASS |
Dan Overy
|
|
|
11/19/2001 16:41:50 DJO - activity updated through activity BLDA022 from case BLD01-02877.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/19/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 11/19/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/19/2001 | | |
|
|
|
|
Routing - FIRE | 11/9/2001 | | 11/9/2001 | | DONE |
|
|
|
No fire sprinklers required but a Class A roof and 30' defensible space is required.
|
Routing - PLANNING | 11/7/2001 | | 11/9/2001 | | PASS |
|
|
|
Approved as per CFH01-00029
|
Routing - PUBLIC WORKS GRADING | 10/29/2001 | | 11/6/2001 | | PASS |
Rita DeYoung
|
|
|
APPROVED AS CATEGORY 1 WITH CONDITIONS OF APPROVAL FROM CFH01-00029
|
Routing - PUBLIC WORKS | 11/6/2001 | | 11/6/2001 | | PASS |
|
|
|
|
Application received | | | 10/29/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 11/13/2001 | | | | |
|
|
|
|
Pending Assignment by DJO | 10/29/2001 | | | | |
Dan Overy
|
|
|
|