BLD-Final | 9/20/2002 | 9/23/2002 | 9/23/2002 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 9/23/2002 1:46:30 PM
|
DOC - Permit Finaled | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 9/23/2002 1:46:39 PM
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Energy code compliance | 2/15/2002 | 2/19/2002 | 2/19/2002 | A | PASS |
Jim Sly
|
|
|
###-####- burt smith -energy code
|
BLD-Framing/Rough-in | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | PASS |
Jim Sly
|
|
|
###-#### BURT
|
BLD-Framing/Rough-in | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | PART |
Jim Sly
|
|
|
###-#### SHEER WALL Shear OK. 1/8/2002 4:01:51 PM
|
BLD-Foundation | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | PASS |
Jim Sly
|
|
|
###-#### CAL
|
BLD-Footing | 11/20/2001 | 11/26/2001 | 11/26/2001 | A | PART |
Jim Sly
|
|
|
###-#### GAL Footing for crawl OK. 11/26/2001 9:12:08 AM
|
BLD-Foundation | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Dave Hannah
|
|
|
###-#### work in progress 11/15/2001 10:07:13 AM
|
BLD-Footing | 11/9/2001 | 11/9/2001 | 11/9/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/09/2001 at 07:23:45. Contact: .
|
Issue PAID IN FULL permit | | | 11/8/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 11/6/2001 | 11/6/2001 | 11/7/2001 | | PASS |
Dan Overy
|
|
|
11/7/2001 14:17:45 DJO - activity updated through activity BLDA022 from case BLD01-02891.
|
Plan Reviewer's activity | | | 11/7/2001 | | DONE |
|
|
|
burt smith faxed engineering for concrete lintel. will red-line and issue one approved plan set.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/7/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 11/7/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2001 | | |
|
|
|
|
Telephone call | | | 11/7/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 11/6/2001 | | PEND |
|
|
|
plans do not meet wall bracing requirements. additional holdowns will be required. basement section does not indicate re-inforcing. engineering will be provided for concrete lintels. have contacted DRE and informed designer of additional information required for issuance of permit. designer will contact contractor.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/6/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 11/2/2001 | | 11/5/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 10/31/2001 | | 11/2/2001 | | PASS |
|
|
|
|
Application received | | | 10/30/2001 | | |
|
|
|
|
Pending Assignment by DJO | 10/30/2001 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 11/5/2001 | | | | |
|
|
|
|