PostCard Mailed | | | 8/4/2004 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
CHANGE STATUS TO (ISS) | | | 3/2/2004 | | DONE |
|
|
|
back to issue status per George Slane
|
PostCard Mailed | | | 10/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Conference | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PASS |
Tony Young
|
|
|
kevin ###-####
ok to cont. 12/10/2002 1:27:25 PM
|
BLD-Final | 9/16/2002 | 9/17/2002 | 9/17/2002 | P | CANC |
Tony Young
|
|
|
kevin ###-####--cancel per kevin
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Energy code compliance | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/19/2002 | 2/19/2002 | 2/19/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### kevin
|
BLD-Framing/Rough-in | 1/25/2002 | 1/28/2002 | 1/28/2002 | A | NR |
Tony Young
|
|
|
###-#### KEVIN
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Tony Young
|
|
|
kevin ###-#### shear nail
ext shear ok 1/28/2002 3:04:35 PM
|
BLD-Conference | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PASS |
Tony Young
|
|
|
kevin-- ###-#### for conf
frame conf. ok so far 1/22/2002 4:01:03 PM
|
BLD-Conference | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | PART |
Tony Young
|
|
|
KEVIN ###-####
framing matters, also hold downs in old concrete ok, demo some existing floor and wall, replace w/ new ok, epoxied bolts in sill plate on existing foundation ok 12/4/2001 2:34:33 PM
|
BLD-Footing | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Tony Young
|
|
|
###-#### ROB
|
Application received | | | 11/5/2001 | | |
|
|
|
|
Plan assigned to (PEP) | 11/5/2001 | | 11/5/2001 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2001 | | DONE |
|
|
|
|