Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02966
StatusFinaled
Name LAKEPOINTE CENTRE 1
Site Address 300 E MALLARD DR
Project NameLAKEPOINTE CENTRE 1
Customer Number 
ePlanReviewNo
Description
(LAKEPOINTE CENTRE 1-2ND FLR) Second floor remodel to upgrade building core restrooms to current accessibility standards in existing building. Work to include demolishing a few interior walls and inaccessible toilet stalls, a new accessible toilet stall in each existing restroom, some new interior walls, providing minimum maneuvering clearance at Men's restroom door when exiting, verifying or providing other fixtures mounted at accessible heights, interior finish, suspended ceiling work, fire sprinkler work, fire alarm work, plumbing work, mechanical work, and electrical work. This is a Scope of Work Permit. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. NOTE: This building is fully fire sprinklered for one-hour substitution. (PC#0850-01) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes11/13/200111/13/200112/16/2002 DONE
Letter of compliance  1/24/2002 DONE
Letter of Compliance #22137 issued 1-24-02.
BLD-Final1/14/20021/14/20021/14/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/14/2002 at 10:47:20. Contact: ###-####. final ok no card found. l/c 1/14/2002 2:42:45 PM
BLD-Conference11/29/200111/30/200111/30/2001APASS
DetailsJim Storey
CREG ###-#### framing ok for cover upon approval from others plm na for use of floor mounted grab bar within 18 inches of c/l of water closet. 11/30/2001 3:56:49 PM
Routing - FIRE11/19/2001 11/29/2001 PASS
apppoved without written comment
Issue PAID IN FULL permit  11/28/2001 DONE
Inspection Record Card- Bld  11/26/2001 DONE
Print Occupancy Form  11/26/2001 DONE
Telephone call  11/26/2001 DONE
left mess that permit is ready with matt rhees
PLANS/APPL TAKEN TO FRONT DESK  11/23/2001 PASS
Routing - PLAN CHECK11/20/2001 11/23/2001 PASS
Permit and plans approved and taken to front desk.
Plan assigned to (JCB)11/13/2001 11/23/2001 PASS
DetailsJason Blais
11/23/2001 09:23:52 JCB - activity updated through activity BLDA022 from case BLD01-02966.
Plan resubmittals received  11/21/2001 DONE
Received two sets of plan resubmittal sheet A1.0 to include response letter. Routed to Jason Blais.
Plan Review Completed(1st rev)  11/20/2001 FAIL
Routing - PLAN CHECK11/14/2001 11/19/2001 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  11/19/2001  
Plan resubmittals and response required for further review.
Routing - PUBLIC WORKS11/13/2001 11/14/2001 PASS
Plans ACCEPTED BY PLAN TECH  11/13/2001 DONE
Application received  11/13/2001  
Recd Pcfee & Taken To Pln CK  11/13/2001 DONE