Permit Information
Permit NumberBLD01-03001
StatusFinaled
Name ISU - BOISE CENTER
Site Address 12301 W EXPLORER DR STE 106
Project NameBRC GENESIS BLDG
Customer Number 
ePlanReviewNo
Description
(ISU - BOISE CENTER) This building is fire sprinklered for area increase. To remodel a 14,000 square foot area within an existing 49,624 square foot building. This tenant space will be used for adult education. Classrooms and offices are being constructed. Work is to include interior nonbearing walls, suspended ceilings, guardrails, and finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. NO OCCUPANCY ALLOWED UNTIL AND UNLESS THE CONDITIONAL USE IS APPROVED. PC01-0856 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/25/20026/25/20026/25/2002 PASS
DetailsJim Sly
Oops! Here is the other one : ) OK for perm Occ. 6/26/2002 2:54:19 AM
Letter of compliance  6/25/2002 DONE
Letter of Compliance #22528 issued 6-25-02.
Fee Review-notes11/15/200111/15/20011/29/2002 DONE
FIRE-Final Inspection1/18/20021/18/20021/18/2002PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 1/18/2002 1:12:15 PM Fire life/safety finaled
Temporary occupancy  1/18/2002 PART
Temp. Occ. Cert. #4707 issued 1-18-02 to the ISU - Boise Center.
BLD-Final1/16/20021/17/20021/17/2002PPART
DetailsJim Sly
###-#### OK for Temp Occ. C/N Obtain Perm Occ status within () days of this notice. 1/18/2002 2:24:44 PM
FIRE-Final Inspection1/16/20021/17/20021/17/2002AFAIL
DetailsTroy Cobbley
fire alarm given temporary per sam rogers, fire sprinkler system finaled, life safety inspection still needs emergency lights and exit signs tested. Door hardware and fire extinguishers are OK. Tenant has occupied the building, I left notice with contractor that building was not to be occupied 1/17/2002 4:26:52 PM
BLD-Conference1/11/20021/11/20021/11/2002ANR
DetailsTroy Cobbley
Added by Inspector: 430 On 1/11/2002 11:41:25 AM Met with contractor and electrician on placement of exit signage and emergency lights
BLD-Framing/Rough-in1/8/20021/9/20021/9/2002APASS
DetailsJim Sly
###-#### CEILING GRID AND WALLS BEFORE COVER
BLD-Framing/Rough-in1/7/20021/7/20021/7/2002PFAIL
DetailsJim Sly
###-#### WALL COVER NR.....Finish firestopping at Corridors. 1/7/2002 4:05:04 PM
BLD-Framing/Rough-in12/21/200112/24/200112/24/2001APASS
DetailsTom Arcoraci
###-####
Routing - PLAN CHECK12/10/2001 12/21/2001 PASS
(12-11-01) Drawings approved after resubmittal review. Drawings on hold until CU is completed. (12-20-01) Sent back to planning for conditional approval.
Plan assigned to (CJW)11/19/2001 12/21/2001 PASS
DetailsCarl Westfall
12/21/2001 08:10:52 CJW - activity updated through activity BLDA022 from case BLD01-03001.
PLANS/APPL TAKEN TO FRONT DESK  12/21/2001 PASS
Print Occupancy Form  12/21/2001 DONE
Inspection Record Card- Bld  12/21/2001 DONE
Telephone call  12/21/2001 DONE
permit ready
Issue PAID IN FULL permit  12/21/2001 DONE
Routing - PLANNING12/20/2001 12/20/2001 PASS
Per Scott Spjute, no occupancy will be issued until and unless the Conditional Use is approved.
Routing - PLANNING12/3/2001 12/10/2001  
Failed per Scott Spjute. Need a CU for school in T-1D zone. Talked to Rick Thomas and Wes Steele. Wes said they will try to submitt CU by Dec. 18th cutoff.
Plan resubmittals received  12/4/2001 DONE
Received two sets of resubmittal sheet A2.1 with cover letter. Routed to Carl Westfall.
Routing - FIRE11/29/2001 12/3/2001 PASS
Plan Review Completed(1st rev)  12/3/2001  
Failed first UBC review.
Routing - PLAN CHECK11/21/2001 11/29/2001  
Failed first UBC review. UBC plan review started November 27, 2001 and finished the next day. A response from the architect was required. See the conditions list.
Routing - PUBLIC WORKS11/20/2001 11/21/2001 PASS
Routing - PLANNING Land Div11/19/2001 11/20/2001 PASS
N/A - tenant improvement w/out expansion. Routed to Public Works. (blc)
Plans ACCEPTED BY PLAN TECH  11/15/2001 DONE
1. Mechanical, Plumbing, Electrical, and Fire Sprinkler & Alarm is noted on the plans to be "Design Build by Subcontractor". Informed individual that dropped off plans, that the plan checker might require plans for these items.
2. Plans not fully dimensioned.
Application received  11/15/2001  
Recd Pcfee & Taken To Pln CK  11/15/2001 DONE