Case Summary (BLD) | | | 12/19/2008 | | |
|
|
|
|
Fee Review-notes | 7/14/2003 | 7/14/2003 | 7/14/2003 | | DONE |
|
|
|
Additional value from subcontractor.
|
Fee Review-notes | 11/15/2001 | 11/15/2001 | 12/16/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/27/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9086 issued 3-27-02 to World Sports Humanitarian Hall of Fame in the 9th Street Warehouses.
|
BLD-Final | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 09:21:41. Contact: ###-####. c/n ok ,ok for c/o 3/26/2002 2:52:54 PM
|
Permanent Occupancy | | 3/26/2002 | 3/26/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Carl Dependahl
|
|
|
fn occ- ###-####- allan ;elec finalled on card 3/22/2002 1:36:51 PM c/n; door closer, ok for t/o 3/22/2002 2:26:27 PM
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### ALAN corridor pents ok, landing still in complete 3/4/2002 2:02:48 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 2/28/2002 5:26:13 PM c/n: seal corridor penetrations, landing at storage 3/1/2002 12:16:24 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | NR |
Carl Dependahl
|
|
|
###-####; unable to contact left msg. 2/28/2002 6:14:46 PM
|
FIRE-Sprinkler Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/22/2002 12:38:07 PM okay to cover; r/i okay
|
BLD-Framing/Rough-in | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PART |
Russ Owen
|
|
|
###-####. 18 in clearance at lower east door would be acccepable. 1/10/2002 3:19:18 PM
|
Plan assigned to (CJW) | 12/28/2001 | | 1/3/2002 | | PASS |
Carl Westfall
|
|
|
1/3/2002 08:36:15 CJW - activity updated through activity BLDA022 from case BLD01-03006.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2002 | | PASS |
|
|
|
Plan modification approved.
|
Telephone call | | | 1/3/2002 | | DONE |
|
|
|
permit ready plan mod
|
Routing - PLAN CHECK | 12/28/2001 | | 1/2/2002 | | PASS |
|
|
|
Approved plan modification.
|
Routing - FIRE | 1/2/2002 | | 1/2/2002 | | PASS |
|
|
|
Approved plan modification.
|
Plan Modification Accepted | | | 12/28/2001 | | |
|
|
|
Plan modification excepted for World Sports Humanitarian Hall of Fame for the redesign of 1-hour corridor on Sheet 2of2. Routed to Carl Westfall.
|
BLD-Framing/Rough-in | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### walls ok pend elec 12/21/2001 6:43:52 PM
|
BLD-Framing/Rough-in | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | NR |
Carl Dependahl
|
|
|
###-####, nh, recall 12/20/2001 4:01:14 PM
|
Inspection Record Card- Bld | | | 12/6/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/6/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/6/2001 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 12/6/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/3/2001 | | 12/5/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2001 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 11/19/2001 | | 12/5/2001 | | PASS |
Carl Westfall
|
|
|
12/5/2001 16:02:28 CJW - activity updated through activity BLDA022 from case BLD01-03006.
|
Routing - FIRE | 11/30/2001 | | 12/3/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/3/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/21/2001 | | 11/30/2001 | | PASS |
|
|
|
UBC plan review started November 29, 2001 and finished the next day. The drawings were approved with conditions. See the conditions list.
|
Routing - PUBLIC WORKS | 11/19/2001 | | 11/21/2001 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 11/19/2001 | | 11/19/2001 | | PASS |
|
|
|
n/a - tenant improvement w/out expansion. If they expand, they will have to prove legal land division. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 11/15/2001 | | DONE |
|
|
|
1. Code and year is not listed on plans.
2. Plans not fully dimensioned.
3. Plans state that "electrical and mechanical work will be design/build and are not included in these drawings". I informed the gentleman that brought in the plans that the plan reviewer might require these drawings.
|
Application received | | | 11/15/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/15/2001 | | |
|
|
|
|