(F) Reprint permit | | | 10/7/2002 | | DONE |
|
|
|
|
BLD-Final | 9/25/2002 | 9/26/2002 | 9/26/2002 | A | PASS |
Tom Arcoraci
|
|
|
Tony, I have $$ on file to cover the driveway, revegetation, downspout, grading, etc.
- Cathy
|
BLD-Grading Inspection | 9/20/2002 | 9/20/2002 | 9/20/2002 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading, roof drains, revegetation are not. Engineer recommended a $2700.00 bond for completion of these items. Upon receipt of the bond the grading and drainage is conditionally approved.
|
BLD-Framing/Rough-in | 7/11/2002 | 7/15/2002 | 7/15/2002 | A | PASS |
Tony Young
|
|
|
darrell ###-####
|
BLD-Conference | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | PASS |
Carl Dependahl
|
|
|
darrell ###-#### ok to put in conf for today per carl...will fix treads. 7/12/2002 11:47:13 AM
|
BLD-Conference | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Carl Dependahl
|
|
|
darrell ###-#### ok to put in conf for today per carl; need to fix stairs ...< 9", ok to cover except at fireplace & stairs 7/11/2002 5:09:18 PM
|
BLD-Energy code compliance | 7/3/2002 | 7/5/2002 | 7/5/2002 | A | PART |
Tony Young
|
|
|
###-####
ok to cover pending f/p pass 7/5/2002 11:23:20 AM
|
BLD-Framing/Rough-in | 6/28/2002 | 7/1/2002 | 7/1/2002 | A | FAIL |
Jim Sly
|
|
|
darrell-- -cell ###-#### re-insp fr C/N posted. 7/1/2002 10:29:21 PM
|
BLD-Framing/Rough-in | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | FAIL |
Tony Young
|
|
|
darrell wilson- call 1st before insp ###-####
c/n posted,,, no insulation 6/24/2002 4:18:11 PM
|
BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | PART |
Tony Young
|
|
|
###-#### DARRELL SHEER INSPECT
ext shear ok, verify completion of hds at frame, nailing ok on exterior 5/6/2002 3:06:19 PM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/29/2002 | 4/29/2002 | A | FAIL |
Tony Young
|
|
|
shear\\###-#### wilson
need struct. engineer to look at changes, provide letter of compliance 4/29/2002 10:27:16 AM
|
BLD-Foundation | 3/22/2002 | 3/22/2002 | 3/22/2002 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/22/2002 11:04:08 AM ok to pour garage portion; noted missed holdowns at various locations all ready poured...advised sub contractor to retro-fit equivalent hold-downs or contact engineer for alternate; no hds called for at garage front!
|
BLD-Footing | 3/19/2002 | 3/20/2002 | 3/20/2002 | A | PART |
Tony Young
|
|
|
TRAY ###-####
garage wall and ftg,, mono,, ok 3/20/2002 2:17:09 PM
|
BLD-Footing | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 17:51:42. Contact: ###-####. Nothing to look at no foarms. Told them to call back I had also called the number listed and no one answerd , contractor is on site. 3/19/2002 11:03:20 AM
|
BLD-Grading Inspection | 3/11/2002 | 3/11/2002 | 3/11/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the subgrade for the main floor footings
|
BLD-Footing | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | PASS |
Russ Owen
|
|
|
###-#### TRE
|
BLD-Footing | 3/7/2002 | 3/8/2002 | 3/8/2002 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 18:39:19. Contact: ###-####.
|
BLD-Footing | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | NR |
Tony Young
|
|
|
ft insp tre--###-####
|
BLD-Foundation | 2/18/2002 | 2/19/2002 | 2/19/2002 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 18:09:32. Contact: ###-####. no time 2/19/2002 4:41:13 PM
|
BLD-Footing | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 13:49:52. Contact: ###-####. basement footings 2/14/2002 12:33:12 PM
|
BLD-Grading Inspection | 2/14/2002 | 2/14/2002 | 2/14/2002 | | DONE |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade.
|
BLD-Footing | 2/11/2002 | 2/12/2002 | 2/12/2002 | P | NR |
Tony Young
|
|
|
|
Inspection Record Card- Bld | | | 2/11/2002 | | DONE |
|
|
|
|
BLD-Footing | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Steven Webb
|
|
|
###-#### swimming pool--ok with verbal comments to contractor. 1/15/2002 10:16:28 AM
|
Issue PAID IN FULL permit | | | 12/26/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 12/17/2001 | 12/17/2001 | 12/17/2001 | | PASS |
Dan Overy
|
|
|
12/17/2001 10:58:19 DJO - activity updated through activity BLDA022 from case BLD01-03008.
|
Case Summary (BLD) | | | 12/17/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 12/17/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/17/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2001 | | DONE |
|
|
|
permit ready and need extra site plan
|
Plans ACCEPTED BY PLAN CHECK | | | 12/17/2001 | | |
|
|
|
|
Routing - PLANNING | 12/5/2001 | | 12/10/2001 | | PASS |
|
|
|
Approved per conditions of approval attached to plan per CFH01-00030
|
Routing - FIRE | 12/10/2001 | | 12/10/2001 | | DONE |
|
|
|
No fire sprinklers required. Class A roof is required.
|
Routing - PUBLIC WORKS GRADING | 11/16/2001 | | 12/4/2001 | | DONE |
Rita DeYoung
|
|
|
Approved as category 1. CFH01-00030
|
Plan Reviewer's activity | | | 11/20/2001 | | PEND |
|
|
|
terry records returned plans to me on 11/16/01 since he will be absent because of surgury for a period of time. top of wall/bottom of footing elevations were not indicated on the foundation. darrell wilson took both plan sets on 11/19/01 and had the engineer address the elevation datum. plans were returned the same day. jim wylie is filling in for terry and will continue routing.
|
Application received | | | 11/16/2001 | | |
|
|
|
|
Pending Assignment by DJO | 11/16/2001 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/11/2001 | | | | |
|
|
|
|