Fee Review-notes | 7/14/2003 | 7/14/2003 | 7/14/2003 | | DONE |
|
|
|
Additional value from subcontractors.
|
Case Summary (BLD) | | | 9/26/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/27/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9228 issued 6-27-02 to the Cafe de Paris.
|
BLD-Final | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | PASS |
Carl Dependahl
|
|
|
###-#### MATHEW; c/n ok, ok for c/o. 6/19/2002 2:11:27 PM
|
Permanent Occupancy | | 6/19/2002 | 6/19/2002 | | DONE |
|
|
|
|
Fee Review-notes | 11/16/2001 | 11/16/2001 | 4/26/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 3/29/2002 | 4/2/2002 | 4/2/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-#### EARLY PM? c/n, thresholds, firestops at alley, closer,seal at demising door, signage...ok for t/o. 4/2/2002 2:45:07 PM
|
Temporary occupancy | | | 4/2/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4774 issued 4-2-02 to the Cafe De Paris.
|
FIRE-Final Inspection | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### extinguisehr; address; tape on sprinkler heads; penetrations through wall ???; using plywood on alley side of walll 4/1/2002 2:37:33 PM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Jim Storey
|
|
|
###-#### walls ok for cover. alley opening not approved need reinsp. 2/22/2002 4:07:09 PM
|
Issue PAID IN FULL permit | | | 1/24/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/7/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2002 | | PASS |
Ron Hill
|
|
|
|
Inspection Record Card- Bld | | | 1/7/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/7/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/7/2002 | | DONE |
|
|
|
left mess for tracy that permit is ready
|
Plan assigned to (R_H) | 11/19/2001 | | 1/7/2002 | | PASS |
|
|
|
1/7/2002 08:59:20 RMH - activity updated through activity BLDA022 from case BLD01-03017.
|
Routing - PLAN CHECK | 12/19/2001 | | 1/7/2002 | | PASS |
Ron Hill
|
|
|
|
Plan resubmittals received | | | 1/2/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A1.0, A2.0, M1.0, M1.1, with cover letter and (1) copy of submittal on firestopping collars. Routed to Ron Hill.
|
Plan Review Completed(1st rev) | | | 12/19/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 12/17/2001 | | 12/19/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/26/2001 | | 12/17/2001 | | FAIL |
Ron Hill
|
|
|
Faxed requirements to the architect Bruce Poe, on 12-17-01, Routed plans to the fire department same day.
|
Case Summary (BLD) | | | 12/17/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/28/2001 | | DONE |
|
|
|
Received one copy of a revised dishwasher drain detail and electric hot water heater detail with transmittal. Routed to Ron Hill.
|
Routing - PLUMBING | 11/26/2001 | | 11/26/2001 | | PASS |
|
|
|
dish washer drain must be secured at counter top height, drain pan required under water heater, piped to floor sink.
|
Routing - PLANNING | 11/21/2001 | | 11/26/2001 | | DONE |
|
|
|
Jeff Neberman.
|
Routing - PUBLIC WORKS | 11/19/2001 | | 11/21/2001 | | PASS |
|
|
|
|
Routing Off Site - C.D.H | 11/19/2001 | | 11/19/2001 | | PASS |
|
|
|
Carol Johnson.
|
Routing - PLANNING Land Div | 11/19/2001 | | 11/19/2001 | | PASS |
|
|
|
n/a - tenant improvement w/out expansion. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 11/16/2001 | | DONE |
|
|
|
1. Construction type not shown on cover sheet.
2. Plans not fully dimensioned.
|
Application received | | | 11/16/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/16/2001 | | |
|
|
|
|