Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/12/2003 | 4/26/2005 | | DONE |
|
|
|
|
First Notice | 11/19/2001 | 11/19/2001 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 12/12/2003 | 12/12/2003 | 12/12/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 12/12/2003 8:14:11 AM
|
BLD-Aging Inspection | 12/12/2003 | 12/12/2003 | 12/12/2003 | | PASS |
Jim Storey
|
|
|
|
Fee Review-notes | 7/14/2003 | 7/14/2003 | 7/14/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent occupancy | | | 4/5/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9097 issued 4-5-02 by Rita to Dent Pro.
|
FIRE-Final Inspection | 4/2/2002 | 4/3/2002 | 4/3/2002 | A | PASS |
Rick Jackson
|
|
|
###-#### ROD
|
BLD-Final | 4/2/2002 | 4/3/2002 | 4/3/2002 | P | PASS |
Jim Storey
|
|
|
###-#### ROD final ok recieved arch. resubmital to disignate mech space above office in archive. 4/3/2002 4:33:11 PM
|
BLD-Final | 4/2/2002 | 4/3/2002 | 4/3/2002 | P | CANC |
Jim Storey
|
|
|
###-#### ROD
|
Permanent Occupancy | | 4/3/2002 | 4/3/2002 | | DONE |
|
|
|
|
BLD-Conference | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | NR |
Jim Storey
|
|
|
ROD ###-#### PLEASE CALL BEFORE lever hardware and signoffs. 3/28/2002 3:19:44 PM
|
FIRE-Final Inspection | 3/19/2002 | 3/20/2002 | 3/20/2002 | P | FAIL |
Rick Jackson
|
|
|
Rod Fender, ###-#### need to verify the interlock of the spraying/exhaust fan; flammable paint storage lockers not there; need warning signs; need landings at exit doors; bollards at gas meter; address 3/20/2002 3:34:02 PM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PART |
Jim Storey
|
|
|
###-#### fire wal ok for cover all ok pending mech approval. 2/22/2002 9:53:59 AM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PART |
Jim Storey
|
|
|
###-#### JUSTIN recieved arch. up stairs no storage above office attic space only/ blk and 5/8 gyp office side floor joist into occ wall. recall to verify gyp and firestopping before ceilling. bathroom ok pending mech. for cover. 2/21/2002 11:19:12 AM
|
BLD-Framing/Rough-in | 2/15/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### ROD cn posted for 1 hr occ sep 2/19/2002 2:46:41 PM
|
Issue PAID IN FULL permit | | | 1/25/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/23/2002 | | DONE |
|
|
|
talked to the arch dave to verify plans are ready..tried to call duncan goundry but no answer & no longer works for baumgart const/mls
|
Routing - PUBLIC WORKS | 1/18/2002 | | 1/22/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/22/2002 | | 1/22/2002 | | PASS |
|
|
|
Plans and permit approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2002 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 11/21/2001 | | 1/22/2002 | | PASS |
Jason Blais
|
|
|
1/22/2002 15:49:43 JCB - activity updated through activity BLDA022 from case BLD01-03018.
|
Routing - PLAN CHECK | 1/17/2002 | | 1/18/2002 | | FAIL |
|
|
|
Plans have still not passed approval for Public Works. Plans routed to Public Works for third time.
|
Routing - FIRE | 1/16/2002 | 1/17/2002 | 1/17/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 1/16/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets S-1 and S-2. routed to Jason Blais.
|
Routing - PLANNING | 1/11/2002 | | 1/16/2002 | | PASS |
|
|
|
Approved.
|
Routing - PUBLIC WORKS | 1/16/2002 | | 1/16/2002 | | FAIL |
|
|
|
Attach Briggs Eng. sewer plans to Building Plans.
|
Routing - PLAN CHECK | 12/14/2001 | | 1/11/2002 | | FAIL |
|
|
|
Plans still need approval from Public Works, Planning, and Fire Dept. Plans routed to these departments.
|
Plan resubmittals received | | | 1/10/2002 | | DONE |
|
|
|
Received two sets of plan resubmittal sheets 27-DSD DOWN SIDE DRAFT DT SHEET 1 OF 2, 27-DID SOLID BACK SHEET 2 0F 2, A-1, A-2, A-3, (2) COPIES OF MSDS, (2) COPIES OF LETTERS REGARDING RESPONSES TO NUMBER 39 AND NUMBER 8, (2) COPIES OF LETTER FROM UNITED WATER, and response cover letter. Resubmittal is in response to Jason Blais and Bill Alexander's plan review comments. Routed to Jason Blais.
|
Routing - FIRE | 12/13/2001 | 12/14/2001 | 12/14/2001 | | FAIL |
Bill Alexander
|
|
|
Lacks many fire code issues for review verification-see report.
|
Plan Review Completed(1st rev) | | | 12/14/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/5/2001 | | 12/13/2001 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept.
|
Plan resubmittals requested | | | 12/13/2001 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLUMBING | 12/4/2001 | | 12/5/2001 | | PASS |
|
|
|
a vent from the upstream chamber of the interceptor and from the discharge dip tube of the interceptor will be required, provide a vent with in 10' of the floor sump and a diptube.
|
Routing - PUBLIC WORKS | 11/27/2001 | | 12/4/2001 | | FAIL |
|
|
|
Revise sewer plans required per John Johnson. kmm
|
Routing - PLANNING Land Div | 11/21/2001 | | 11/27/2001 | | PASS |
|
|
|
n/a - tenant improvement w/out expansion. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 11/19/2001 | | DONE |
|
|
|
|
Application received | | | 11/19/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/19/2001 | | |
|
|
|
|