Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/13/2004 | 4/26/2005 | | DONE |
|
|
|
|
First Notice | 11/21/2001 | 11/21/2001 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 1/13/2004 | 1/13/2004 | 1/13/2004 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 1/13/2004 2:44:05 PM
|
BLD-Aging Inspection | 1/13/2004 | 1/13/2004 | 1/13/2004 | | DONE |
Russ Owen
|
|
|
|
BLD-Final | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Russ Owen
|
|
|
fn insp - ###-####- john walker . ok final oc. 4/1/2002 5:30:48 PM
|
Letter of compliance | | | 4/1/2002 | | DONE |
|
|
|
Letter of Compliance #22321 issued 4-1-02.
|
FIRE-Final Inspection | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/28/2002 3:37:19 PM Fire alarm, fire sprinkler and fire/life safety finaled. Card was not available to sign
|
BLD-Conference | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Russ Owen
|
|
|
john -###-#### for conf Needs fire life/safety. 3/13/2002 4:21:40 PM
|
FIRE-Final Inspection | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/13/2002 2:30:51 PM fire sprinklers finaled. Fire alarm NOT FINALED
|
FIRE-Final Inspection | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | FAIL |
Rick Jackson
|
|
|
fire fn john- ###-#### overhead door at loading tested for release with fusible link and operated properly. QR sprinklers 155 temp used in storage room on new line, not per plans 3/12/2002 8:49:48 AM
|
FIRE-Final Inspection | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | FAIL |
Troy Cobbley
|
|
|
Fire life/safety OK but fire alarm and fire sprinkler failed 3/8/2002 9:53:34 AM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PART |
Russ Owen
|
|
|
###-#### ok to drop ceiling tile. 2/22/2002 11:31:56 AM
|
BLD-Footing | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 11:51:55. Contact: ###-####. steps. 2/19/2002 12:15:41 PM
|
BLD-Conference | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 11:52:42. Contact: ###-####.
|
BLD-Conference | 2/13/2002 | 2/13/2002 | 2/13/2002 | P | PART |
Russ Owen
|
|
|
###-#### JOHN
|
BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Russ Owen
|
|
|
###-#### john. Restrooms subject to ele insp. 1/31/2002 2:08:28 PM
|
BLD-Framing/Rough-in | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | NR |
Russ Owen
|
|
|
###-####
|
Inspection Record Card- Bld | | | 1/17/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/17/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/17/2002 | | DONE |
|
|
|
talked to skip to verify plans are ready
|
Issue PAID IN FULL permit | | | 1/17/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2002 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 11/27/2001 | | 1/15/2002 | | PASS |
Jason Blais
|
|
|
1/15/2002 15:34:56 JCB - activity updated through activity BLDA022 from case BLD01-03049.
|
Routing - PLAN CHECK | 12/28/2001 | | 1/15/2002 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
Plan resubmittals received | | | 1/14/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A1.0, A3.0, with cover letter. Routed to Jason Blais.
|
Plan resubmittals requested | | | 12/28/2001 | | |
|
|
|
Plan resubmittals and written response required for further review again.
|
Routing - PLAN CHECK | 12/10/2001 | | 12/28/2001 | | FAIL |
|
|
|
Second plan review report sent and faxed to architect. Resubmittals and written response required for further review.
|
Plan resubmittals received | | | 12/21/2001 | | DONE |
|
|
|
Received two sets of resubmittal sheets A1.0, A3.0, with structural calculations and cover letter. Routed to Jason Blais
|
Plan Review Completed(1st rev) | | | 12/10/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 12/7/2001 | | 12/10/2001 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 12/7/2001 | | |
|
|
|
Resubmittal drawings and response required for further review.
|
Routing - PLAN CHECK | 11/30/2001 | | 12/7/2001 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Resubmittal drawings and response required for further review. Plans route to Fire Dept. for review.
|
Routing - PUBLIC WORKS | 11/28/2001 | | 11/30/2001 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 11/27/2001 | | 11/28/2001 | | PASS |
|
|
|
N/A - tenant improvement w/out expansion. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 11/23/2001 | | DONE |
|
|
|
1. General Notes indicate "Design Build of expansion of existing mechanical, and electrical systems".
|
Application received | | | 11/21/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2001 | | |
|
|
|
|