Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-03052
StatusFinaled
Name SUTHERLAND SHAWN D
Site Address 816 N CLOVER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 290s.f. over an existing 280s.f. garage to living area conversion. As the foundation does not support the 1st floor the 6" is ok for same. There is also a patio cover over the front of the lower level to be built. The upper level is framed using conventional framing methods. The new upper wall to existing roof connection is detailed on plans along with new upper wall to lower existing wall including the cripple wall installed to extend lower wall. All per the approved plans as marked and details or provide engineering and calculations/detaild to the building inspector at the framing inspection. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/10/20043/11/20043/11/2004PPASS
DetailsTony Young
Please call at least 15 mins before inspection//shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled3/11/20043/11/20043/11/2004PPASS
DetailsTony Young
Finaled by inspector at 3/11/2004 2:33:38 PM
BLD-Final1/12/20041/13/20041/13/2004AFAIL
DetailsTroy James
shawn; Phone #: ###-#### Internet Inspection Request from: Annette Moore
need to turn handrails into wall. 1/13/2004 10:14:43 AM
Extend Permit 180 days 8/6/20038/6/2003 DONE
BLD - Request for Extension8/5/20038/5/20038/5/2003PPASS
DetailsTony Young
###-#### shawn
last extension 8/6/2003 1:14:19 PM
PostCard Mailed  1/4/2003 SENT
PostCard has been mailed requesting inspection.
PostCard Mailed  12/6/2002 SENT
PostCard has been mailed requesting inspection.
BLD-Framing/Rough-in5/15/20025/16/20025/16/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 05/15/2002 at 12:49:55. Contact: .
BLD-Conference12/31/20011/2/20021/2/2002ADONE
DetailsDave Hannah
###-#### went over framing they will add hold downs sw corner get engineering for hand stack roof framing and changed straping second story wall to ext roof 1/2/2002 11:06:03 AM
Plan assigned to (PEP)11/23/2001 12/31/2001 PASS
DetailsPerry Paine
12/31/2001 11:49:14 PEP - activity updated through activity BLDA022 from case BLD01-03052.
Inspector's copy Bld permit  12/31/2001 DONE
Case Summary (BLD)  12/31/2001  
PLANS/APPL TAKEN TO FRONT DESK  12/31/2001 DONE
Inspection Record Card- Bld  12/31/2001 DONE
Issue PAID IN FULL permit  12/31/2001 DONE
Application received  11/23/2001