Letter of compliance | | | 6/23/2004 | | DONE |
|
|
|
Letter of Compliance issued 6-23-04.
|
BLD-Conference | 5/18/2004 | 5/18/2004 | 5/18/2004 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/18/2004 | 5/18/2004 | 5/18/2004 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 5/18/2004 10:22:13 AM
|
BLD-Aging Inspection | 5/12/2004 | 5/12/2004 | 5/12/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 5/12/2004 | 5/12/2004 | 5/12/2004 | P | FAIL |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/12/2004 | 2/12/2004 | 2/12/2004 | | DONE |
Dave Hannah
|
|
|
wip 2/12/2004 7:37:56 AM
|
Print Occupancy Form | | | 11/24/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/24/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 11/19/2003 | 11/19/2003 | 11/19/2003 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/29/2003 | 7/29/2003 | 7/29/2003 | | PART |
Carl Dependahl
|
|
|
final ok, l/c only. 7/29/2003 1:16:28 PM
|
BLD-Aging Inspection | 5/23/2003 | 5/23/2003 | 5/23/2003 | | PASS |
Dave Hannah
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/7/2003 | | |
|
|
|
|
BLD-Final | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PASS |
Carl Dependahl
|
|
|
Dan, c/n ok, ok for perm c/o. 11/8/02 10:43:59 AM
|
BLD-Final | 11/5/2002 | 11/6/2002 | 11/6/2002 | P | CANC |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 11/5/2002 | 11/5/2002 | 11/5/2002 | P | NR |
Carl Dependahl
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ...need listing, recall. 11/5/02 4:51:48 PM
|
BLD-Final | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | CANC |
Carl Dependahl
|
|
|
Dan
|
BLD-Final | 10/14/2002 | 10/15/2002 | 10/15/2002 | P | FAIL |
Carl Dependahl
|
|
|
Dan; c/n, need as-built & listing for roll-up fire shutter. 10/15/2002 1:14:42 PM
|
FIRE-Final Inspection | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | PASS |
Rick Jackson
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | NR |
Carl Dependahl
|
|
|
###-####
|
FIRE-Final Inspection | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | PASS |
Rick Jackson
|
|
|
|
FIRE-Final Inspection | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | CANC |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
FIRE-Final Inspection | 9/16/2002 | 9/18/2002 | 9/18/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 14:23:46. Contact: ###-####. need label on south door; penetrations in corridor wall; firestopping at fire shutter counter (underneath); fire shutter not closing 9/18/2002 8:45:50 AM
|
BLD-Final | 8/2/2002 | 8/5/2002 | 8/5/2002 | A | PART |
Rick Jackson
|
|
|
PHASE #2 ###-#### WENDLE will complete the final inspection when the job is complete 8/5/2002 9:35:29 AM
|
BLD-Conference | 7/26/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Carl Dependahl
|
|
|
w/ Wendell...wants to complete job in phases, referred him to Rick J. re: fire safety devices & alarms; will consult w/ Dan re t/o for this project
|
BLD-Framing/Rough-in | 4/17/2002 | 4/17/2002 | 4/17/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 07:26:55. Contact: ###-####.Partial inspection only of southend of office reodle, I have found the ceiling above corrior is not complete as pipes have not been adequately caulked and some holes will require drywall, also pillow pad at the 4 in conduit, contractor on site for inspection will recall. Note:only partial inspection. 4/17/2002 2:22:14 PM
|
BLD-Framing/Rough-in | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | NR |
Carl Dependahl
|
|
|
###-#### DAN
|
BLD-Framing/Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PART |
Carl Dependahl
|
|
|
fr dan ###-####
|
Issue & PRINT to be Invoiced | | | 1/28/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/28/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2002 | | DONE |
|
|
|
e-mailed curtis that permit is ready
|
Routing - PLAN CHECK | 1/17/2002 | | 1/24/2002 | | PASS |
|
|
|
Approved as noted and attached
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2002 | | PASS |
|
|
|
Routing to permit desk for issue.
|
Plan assigned to (DRS) | 11/29/2001 | | 1/24/2002 | | PASS |
Dan Stuart
|
|
|
1/24/2002 16:53:27 DRS - activity updated through activity BLDA022 from case BLD01-03067.
|
Routing - FIRE | 1/14/2001 | | 1/17/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/17/2002 | | PASS |
|
|
|
|
Telephone call | | | 1/14/2002 | | DONE |
|
|
|
Called Art Albanese, ZGA Architects, to discuss the roll down counter fire door, if one listed unit. That is what his intent was and what was specified. I will put note on plan review comments that specifications for installation showing code compliance with Chapter 7, section 713 and section 1004.3.4.3.2.1 needs to be provided. The accessible counter area will be within the office space and a sign directing to the location of the accessible counter portion will be mounted on corridor wall at approriate location.
|
Telephone call | | | 1/11/2002 | | DONE |
|
|
|
Called and talked with Matthew May @ Engineering Inc. to discuss the mechanical plan call out for new or adjusted reheat coils (sealed within the ducts per Mr. May) and the table for V.A.V. Box Schedule which would not be sealed in ducts and would require a Smoke/Fire damper at each duct penetration of the rated corridor wall. Matthew May stated the reheat coils designation was correct and he would send out addendum note. I will red line on the plans.
|
Routing - PLUMBING | 11/29/2001 | | 12/3/2001 | | PASS |
|
|
|
2" waste line relocation per 2000 upc
|
Routing - PUBLIC WORKS | 11/29/2001 | | 11/29/2001 | | PASS |
|
|
|
|
Application received | | | 11/26/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/26/2001 | | PEND |
|
|
|
No code data on cover sheet.
|
Routing - PLAN CHECK | 12/3/2001 | | 1/14/2001 | | PEND |
|
|
|
No resubmittals required by architect. Routing to fire code analyst for review.
|