Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD01-03095
StatusFinaled
Name BOISE FIRE DEPARTMENT
Site Address 1666 W COMMERCE AVE
Project NameFIRE STATION #7
Customer Number 
ePlanReviewNo
Description
Fire Station #7 * To remodel a an existing pre-engineered building and to add a new 2500 sq ft second story to house a fire station. The Fire Dept. will occupy the entire building and rooms with undeclared uses under this permit will be declared S-1 storage. The second floor will house the living quarters for the Fire Fighters. All work is per the approved plans and attachments. CUP01-00135
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/15/200312/15/200312/15/2003 PASS
DetailsJim Storey
3/4 12/15/2003 8:04:43 AM
DOC - Permit Finaled12/15/200312/15/200312/15/2003APASS
DetailsJim Storey
Finaled by inspector at 12/15/2003 8:04:45 AM
Fee Review-notes7/14/20037/14/20037/14/2003 DONE
Permanent Occupancy 3/4/20033/4/2003 DONE
Details
FIRE-Final Inspection3/3/20033/4/20033/4/2003APASS
DetailsRick Jackson
BOYD; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Permanent occupancy  3/4/2003 DONE
Perm. Occ. Cert. #9573 issued 3-4-03 to Fire Station #7.
FIRE-Final Inspection2/28/20032/28/20032/28/2003PNR
DetailsRick Jackson
boyd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie talked to Boyd and they to do some work on the generator 2/28/2003 1:32:40 PM
BLD-Final2/26/20032/27/20032/27/2003PPART
DetailsJim Storey
###-#### ###-#### final occ ok pending fire sign off. 2/27/2003 4:22:02 PM
FIRE-Final Inspection2/27/20032/27/20032/27/2003PFAIL
DetailsRick Jackson
need strobe replaced in room 2 restroom; need remote reset switches for detectors on northside; need 2 hr test paperwork for generator; need to test transfer switch for main power to generator; remove exit sign by FACP; need zones at FACP 2/27/2003 4:52:09 PM
Code Occupancy Approval2/11/20032/11/20032/11/2003PPASS
DetailsWm. Michael Meloy
Compliance met. 2/11/2003 2:04:54 PM
BLD-Final1/20/20031/21/20031/21/2003ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/20/2003 at 11:09:46. Contact: ###-####. contractor wanted mech final not bld. 1/21/2003 8:53:14 AM
BLD-Other1/17/20031/17/20031/17/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/17/2003 at 07:32:37. Contact: ###-####. ceilling ok for cover pending mech and ele approval. 1/17/2003 10:08:21 AM
BLD-Framing/Rough-in10/29/200210/30/200210/30/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/29/2002 at 17:16:46. Contact: ###-####.west bay wall and east bay wall ok 10/30/2002 3:09:34 PM
BLD-Framing/Rough-in10/16/200210/17/200210/17/2002APART
DetailsJim Storey
framing ok pending other insp. 10/17/2002 10:09:47 AM
BLD-Framing/Rough-in10/15/200210/16/200210/16/2002PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/15/2002 at 10:54:15. Contact: ###-####.out of time. 10/16/2002 5:29:07 PM
BLD-Wall cover10/10/200210/11/200210/11/2002PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/10/2002 at 10:45:21. Contact: ###-####.exterior sheer ok for cover keth jones walk through with myself and approved aplacations that were noted on previous insp. 10/11/2002 1:54:24 PM
BLD-Framing/Rough-in9/25/20029/26/20029/26/2002ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/25/2002 at 13:23:19. Contact: ###-####.
BLD-Wall cover9/19/20029/19/20029/19/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/19/2002 at 07:22:57. Contact: ###-####. int shear wall north west side ok to rock over 9/19/2002 10:41:33 AM
BLD-Framing/Rough-in9/6/20029/9/20029/9/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/06/2002 at 11:41:17. Contact: ###-####.south wall framing bolts and holddowns ok for cover. 9/9/2002 10:06:22 AM
BLD-Footing8/7/20028/8/20028/8/2002APART
DetailsJim Storey
###-#### ###-####rebar ok special insp. pending. mti 8/8/2002 9:51:28 AM
Issue PAID IN FULL permit  7/3/2002 DONE
Routing - PLANNING6/4/2002 6/4/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/4/2002 DONE
Inspection Record Card- Bld  6/4/2002  
Print Occupancy Form  6/4/2002  
Telephone call  6/4/2002 DONE
LEFT MESS FOR RUSS PHILLIPS THAT PERMIT IS READY & NEED ACHD
Plan assigned to (MLO)11/29/2001 6/4/2002 PASS
DetailsMike Otto
6/4/2002 10:31:20 MLO - activity updated through activity BLDA022 from case BLD01-03095.
Routing - PLANNING5/15/2002 6/3/2002 PEND
CUP01-00135 pass on 06/03/2002. Needs to be reviewed by Design Review to be complete.
Routing - PUBLIC WORKS5/13/2002 5/15/2002 PASS
Routing - PLANNING Land Div5/15/2002 5/15/2002 PASS
Approved per Dave A. and Wayne Gibbs
Routing - FIRE5/10/2002 5/13/2002 PASS
Routing - PLAN CHECK5/9/2002 5/10/2002 PASS
Plan resubmittals received  5/9/2002 DONE
Received two copies of complete revised sets of plans and two copies of reubmittal const. manual. Revised title blocks with new firm name. All phone, fax & consultants ar the same. Routed to Mike O. kmm
Routing - FIRE2/14/2002 2/21/2002 FAIL
hydrant location
Plan Review Completed(1st rev)  2/21/2002 FAIL
Routing Off Site - STRUCTURAL2/7/2002 2/14/2002 PASS
contacted pdq to take plans to outside eng. kmm
Plan resubmittals requested  2/14/2002 FAIL
UBC tenant areas and separations
Routing - PLAN CHECK2/5/2002 2/14/2002 FAIL
corrections sent to architect.
Plan resubmittals received  2/5/2002 DONE
Received two sets of resubmittal sheets A2.01, A2.02, A3.01, S1.0, M0.0, M1.0, M2.0, M2.1, P1.0, P1.1, P2.0, P2.1, FP1.0, E1.00, E2.00D, E2.00F, E2.00L, E2.00P, E2.00S, E2.01, E3.00, and three sets of resubmittal sheets S1.0, S2.0, S3.0, S4.0, S5.0 with (2) sets of structural calculations, a letter from Engineering Incorporated, and cover letter from Olson & Associates. routed to Mike Otto.
Routing - FIRE1/2/2002 1/4/2002 FAIL
DetailsBill Alexander
Question on UG work meeting NFPA 24 (running under the building). Question on walls not correlating with details and plans? Need Hydrant location/s. Need storage room commodities and storage system incorporating.
Plan Review Completed(1st rev)  1/4/2002 DONE
Plan resubmittals requested  1/2/2002 DONE
UBC and Structural corrections
Routing - PLAN CHECK12/7/2001 12/28/2001 FAIL
corrections sent to architect
Routing Off Site - STRUCTURAL11/29/2001 12/28/2001 FAIL
Contacted PDQ to take plans to outside eng. kmm
Routing - PLUMBING12/5/2001 12/7/2001 PASS
use boise city approved flammable liquids interceptor detail, attached, trench drains must be trapped, combination waste and vent system will be allowed, vent branch lines over 15'. thermol expantion protection will be required between water heater and upstream check valve. additional cross connection protection may be required.
Routing - PLANNING12/4/2001 12/5/2001 FAIL
Routing - PUBLIC WORKS12/3/2001 12/4/2001 FAIL
Routing - PLANNING Land Div11/29/2001 12/3/2001 FAIL
This appears to be illegally divided. Need deeds or evidence showing otherwise since it is a portion of an original lot platted after 10/30/65. Faxed rejection slip to Russ Phillips. Routed to Public Works. (blc)
First Notice11/29/200111/29/200111/29/2001 DONE
Application received  11/29/2001  
Plans ACCEPTED BY PLAN TECH  11/29/2001 DONE
Plan routing begun/NEW & ADDTN  11/29/2001 DONE
Override - Parcel Holds  11/29/2001