Case Summary (BLD) | | | 3/9/2009 | | |
|
|
|
|
Fee Review-notes | 11/30/2001 | 11/30/2001 | 3/22/2004 | | DONE |
|
|
|
|
BLD-Final | 5/13/2003 | 5/15/2003 | 5/15/2003 | A | PASS |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Letter of compliance | | | 5/15/2003 | | DONE |
|
|
|
Letter of Compliance #22936 issued 5-15-03.
|
FIRE-Final Inspection | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | PASS |
Troy Cobbley
|
|
|
Sprinklers finaled on 5/9/2003 5/14/2003 9:17:43 AM
|
FIRE-Final Inspection | 5/7/2003 | 5/9/2003 | 5/9/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinklers finaled 5/9/2003 11:22:19 AM
|
BLD-Framing/Rough-in | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | PART |
Dave Hannah
|
|
|
fr john- ###-#### -call 1st before insp.. thanks ok to cover after fire sprinkler and elec r/i 3/12/2002 10:20:08 AM
|
BLD-Foundation | 12/28/2001 | 12/31/2001 | 12/28/2001 | A | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 12/28/2001 | 12/28/2001 | 12/28/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 12/28/2001 2:23:33 PM ftgs for column on south and east side for two story
|
Inspection Record Card- Bld | | | 12/28/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/28/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/28/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/24/2001 | | 12/27/2001 | | PASS |
|
|
|
Re-submittals inserted into original plan of 11/30/01. Copies of architects & engineers response attached to and part of approved plans. Routing to permit desk for issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2001 | | PASS |
|
|
|
To permit desk to issue.
|
Plan assigned to (DRS) | 12/7/2001 | | 12/27/2001 | | PASS |
Dan Stuart
|
|
|
12/27/2001 18:13:51 DRS - activity updated through activity BLDA022 from case BLD01-03110.
|
Routing - FIRE | 12/19/2001 | | 12/24/2001 | | PASS |
|
|
|
APPROVED AS DRAWN
|
Plan Review Completed(1st rev) | | | 12/24/2001 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 12/21/2001 | | DONE |
|
|
|
Received one copy of calculations, EIFS system submittal, and cover letter. Routed to Dan Stuart.
|
Routing - PLAN CHECK | 12/7/2001 | 12/17/2001 | 12/19/2001 | | FAIL |
|
|
|
Additional details, engineering required from architect. Resubmittals required. Copy of plan review to architect. Routing to fire code analsyt for review.
|
Telephone call | | | 12/17/2001 | | DONE |
|
|
|
Called Bill Matter to review questions on welding and special inspection; if approved fabricator if welding done in shop; design details & engineering for the saddle caps to carry the GLB & welding requirements to the new TS columns; clarification on differences between the engineered footing size of 11.5' and the 11.25' drawn on plans; the difference of the bolt hole location on the engineered stacked post cap submitted, F/A1.1 detail at 3-1/4" instead of 3-3/4" engineered;Minimum rebar cover by concrete per engineering - note on plans - 3-1/2"; Deferred submittal note on plans for the truss'; Evaluation Services Report from ICBO for the "Parax System" &/or "Texcot" System.
|
Routing - PLANNING | 12/7/2001 | | 12/7/2001 | | PASS |
|
|
|
Aprroved per DRH01-00202.
|
Plans ACCEPTED BY PLAN TECH | | | 11/30/2001 | | DONE |
|
|
|
|
Application received | | | 11/30/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/30/2001 | | |
|
|
|
|