Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/15/2003 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 12/15/2003 | 12/15/2003 | 12/15/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 12/15/2003 8:07:26 AM
|
BLD-Aging Inspection | 12/15/2003 | 12/15/2003 | 12/15/2003 | | PASS |
Jim Storey
|
|
|
6/12/02 12/15/2003 8:07:18 AM
|
Fee Review-notes | 11/30/2001 | 11/30/2001 | 9/16/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/12/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9167 issued 6-12-02 to Arby's Restuarant.
|
BLD-Final | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | PART |
Jim Storey
|
|
|
###-#### pete temp. final ok pending sign off from others/ final affidavit from special inspection ok an in archive. 6/5/2002 5:02:56 PM
|
Permanent Occupancy | | 6/5/2002 | 6/5/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/3/2002 | 6/4/2002 | 6/4/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 08:14:54. Contact: ###-####. will occupant load sign for structural inspector 6/4/2002 3:12:19 PM
|
Code Occupancy Approval | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Framing/Rough-in | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PASS |
Jim Storey
|
|
|
PETE ###-#### ceilling and rated shaft ok for cover. 5/24/2002 10:01:06 AM
|
BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 | A | PASS |
Jim Storey
|
|
|
PETE ###-#### framing ok for cover engineering fix done and in the archive. 4/29/2002 9:40:17 AM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 10:41:43. Contact: ###-####. c/n header over plm bearing studs/ naill sheer wall at plm panel void. ok to insulate bld. 4/25/2002 3:22:48 PM
|
BLD-Framing/Rough-in | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | PART |
Tom Arcoraci
|
|
|
pete ###-#### roof deck nailing ok 4/15/2002 9:23:45 AM
|
BLD-Foundation | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 07:57:01. Contact: ###-####. pending s.i report rebar ok. 3/14/2002 4:17:07 PM
|
BLD-Footing | 3/11/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 10:48:58. Contact: ###-####. ft ok 3/12/2002 4:12:59 PM
|
Plan resubmittals received | | | 3/12/2002 | | DONE |
|
|
|
Received one copy of revised drawings ( some not stamped or signed). One copy of OZ's response to items, B2CE response to items, JVA response to items, Fullerton response to items, Fullerton building calculations and flow rates. Routed to Jim Storey.
|
(F) Reprint permit | | | 3/6/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/5/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 3/1/2002 | 3/1/2002 | 3/1/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/1/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/1/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/1/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/1/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 12/3/2001 | | 3/1/2002 | | PASS |
Mike Phillips
|
|
|
3/1/2002 11:24:34 M_P - activity updated through activity BLDA022 from case BLD01-03112.
|
Routing - PLAN CHECK | 2/5/2002 | | 2/28/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 2/28/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 2/28/2002 | | 2/28/2002 | | PASS |
|
|
|
Land division ok. Returned to Plan Review. (blc)
|
Routing - PLANNING Land Div | 2/6/2002 | | 2/6/2002 | | FAIL |
|
|
|
Land division NOT ok. New ROS submitted 02/05/02 and needs to be reviewed. Will need recorded copy of ROS, new deeds and correct parcel #s for ALL parcels before any permits will be issued.
(This was originally ok'd when routed on 12/13/01 under the belief that all land division issues were to be cleared up, but they have not yet been finished. No further permits will be issued until this is wrapped up.)
|
Routing - PLANNING | 2/1/2002 | | 2/4/2002 | | PASS |
|
|
|
Approved per DRH01-214.
|
Routing - PLAN CHECK | 1/30/2002 | | 2/1/2002 | | |
|
|
|
Routing to Planning (Marty).
|
Routing - PLANNING | 1/30/2002 | 1/30/2002 | 1/30/2002 | | PASS |
|
|
|
Approved as per CUP01-00107. Pending Design Review approval.
|
Routing - FIRE | 1/30/2002 | 1/30/2002 | 1/30/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 1/22/2002 | | 1/30/2002 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 1/24/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets COVER, C-3, A1, S1, S3, A2, A3, A4, A5, A5.1, A7, P-1, MPE-1, Cover letter w/comments, B2CE reply to plans comments, JVA response letter, Fullerton Building Systems response letter, Fullerton Building Calculations, and Fire Hydrant Flow Rate. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 1/18/2002 | | 1/22/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/7/2002 | | 1/18/2002 | | |
|
|
|
Sent to public works
|
Plan Review Completed(1st rev) | | | 1/7/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 1/2/2002 | | 1/7/2002 | | FAIL |
|
|
|
hydrant & hydrant flow
|
Routing - PLAN CHECK | 12/26/2001 | | 1/2/2002 | | FAIL |
|
|
|
Plan review completed. Sent correction report to architect requesting additional information is required for a further review prior to issuing permit.
|
Routing - PLUMBING | 12/21/2001 | | 12/26/2001 | | PASS |
|
|
|
verify premise protection with water company, provide an r.p. for cw make up to MAU-1 with auto drain valve, pvb may be required at the shake machine wall box, if an automatic soap dispensor is installed at the mop sink provide a water supply for it, additional cross connection protection may be required.
|
Routing - PLANNING | 12/19/2001 | | 12/19/2001 | | FAIL |
|
|
|
Need copy of shared parking agreement as per Condition of Approval #3 in CUP01-00107.
|
Routing - PUBLIC WORKS | 12/13/2001 | | 12/18/2001 | | FAIL |
|
|
|
Requires drainage plan revision note for inspectors
|
Additional plans submitted | | | 12/10/2001 | | DONE |
|
|
|
received two copies of landscape plans L-1 thru L-4. Put with plans. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 12/3/2001 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/3/2001 | | DONE |
|
|
|
|
Application received | | | 11/30/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/30/2001 | | |
|
|
|
|