BLD-Conference | 3/13/2002 | 3/13/2002 | 3/13/2002 | A | PART |
Bob Archibald
|
|
|
Conference w/architect and Dan Stewart. P&Z issues addressed with Sahra. Structural an mechanical on plans reviewed. Ron Thurber, architect, will be lead person for owner.
|
VOIDED CHANGE STATUS | | | 1/16/2002 | | FAIL |
Bob Archibald
|
|
|
Permit voided per Tim H.
|
Case Summary (BLD) | | | 1/11/2002 | | DONE |
|
|
|
|
BLD-Conference | 1/8/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Jim Schmer
|
|
|
ELE01-04260 has been finaled by Jim Schmer.
|
BLD-Conference | 1/7/2002 | 1/7/2002 | 1/7/2002 | A | PART |
Bob Archibald
|
|
|
Met with Jim Schmer and electrical contractor reviewed electrical requirements and interior non bearing walls that had been opened. No structural issues on interior non bearing walls. Owner was not present.
|
Case Summary (BLD) | | | 1/3/2002 | | DONE |
|
|
|
|
BLD-Conference | 12/31/2001 | 12/31/2001 | 12/31/2001 | A | PART |
Bob Archibald
|
|
|
Left CN with employee at site that utilities will be terminated if structure is occupied. Jim Schmer reported that buisness was open for lunch on 12/28/01. Outdoor barbeque was in operation and it appeared they were preparing for lunch on this date.
|
BLD-Other | 12/31/2001 | 12/31/2001 | 12/31/2001 | P | PART |
Bob Archibald
|
|
|
Returned to site at 3pm. Buisness not in operation and no one present. Photographed sign on front door.
|
BLD-Conference | 12/27/2001 | 12/27/2001 | 12/27/2001 | | PASS |
Jim Schmer
|
|
|
refer to ele01-04260
|
(F) Reprint permit | | | 12/21/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/21/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/20/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 12/20/2001 | | |
|
|
|
The data has been moved to a Word document attached to this case.
|
Conference | 12/19/2001 | 12/19/2001 | 12/19/2001 | | FAIL |
Lee Rice
|
|
|
Met with marty from Drake Mechanical and Jim Johnson(360) and Stan johnson(352) to survey building for Plumbing code compliance and investigate illegal plumbing work done by unlicensed contractor without permits. Findings:
1. building needs water main premise backflow valve(DCVA) and corresponding thermal expanion tank. 2. need backflow test for outside sprinkler valve. 3. need to immediately disconnect cross connection between potable water and sanitary sewer at pot washing/food prep sink. 4. Disconnect direct connection to sanitary sewer at Pot washing/food prep sink and pipe to floor sink. 5. install rp backflow valve on new line to espresso and coffee machines and have it tested along with existing rp to soda dispenser. also rehang and secure. 6. Fix apparant water leak behind Men's room door. 7. Move soda dispenser to eliminate tripping hazard caused by water line and facilitate drip pan drain and pipe to floor sink. 8. Move and re-rough in any plumbing that might be required in bathrooms as a result of any relocations of plumbing fixtures required for accessibillity for handicapped standards. 9. Repipe water heater pressure relief safety valve drain line according to code. Install grease intercepter as per West Boise Sewer District letter of 12/04/01. 10. install DCVA backflow valve on water supply to Ice maker. 11. Re-install 1/2 inch drain curranly running water onto and across floor to approved location in approved manner. 12. provide grate for floor sink. 13. Call Central District Health for reinpection after above Plumbing Code Corrections.
Will provide code sections for above numbered items upon request. Lee Rice
|
Case Summary (BLD) | | | 12/19/2001 | | DONE |
|
|
|
|
BLD-Conference | 12/18/2001 | 12/18/2001 | 12/18/2001 | A | FAIL |
Bob Archibald
|
|
|
Conference with permit holder, informed him that his Temp. Occ. had been revoked and structure was not approved for occupancy. Electrical and Plumbing supervisors were also present and issued CN'S requireing permits and inspections by licensed contractors. A site review of reported inprovements to site confirmed that masonry barbecue was still welded shut, a gas line had been added along the new wall seperating kitchen area from front counter, gas burning appliances in this same area without a hood system, and french frying machine being used under the disconnected type I hood which is in violation of plan review item # s 3 & 4.
|
BLD-Conference | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | PART |
Bob Archibald
|
|
|
Returned to site and left copies of Correction Notice at front and rear door listing items for revokation of Temp. Occ.. Notice also mailed to property.
|
BLD-Conference | 12/18/2001 | 12/18/2001 | 12/18/2001 | A | PASS |
Jim Schmer
|
|
|
Added by Inspector: 324 On 12/27/2001 8:04:31 AM U.A.C.-301.1 Permit required, 305.1 Inspection required / B.C.E.O.- 4-5-08 Permit Applicant (Work done by non-licensed Electrical Contractor, no permit acquired, work covered) Electrical Contractor SHALL obtain permit within 24 hours or further action will be taken (ie: power disconnected to structure) Contractor to call for conference to evaluate work allready doe & covered up.
|
BLD-Conference | 12/6/2001 | 12/6/2001 | 12/6/2001 | A | PART |
Bob Archibald
|
|
|
Reviewed property for life safety and plan review requirements. Masonry barbecue welded shut, no heat- processing (grease vapor) appliances being used. Informed permit holder to post occ. sign, block access to deck, complete fire dept. requirements and work on conditions required within 90 days. Temp. occ. would be approved on these conditions.
|
BLD-Final | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | PART |
Tom Arcoraci
|
|
|
fn -- fn gree- ###-####, ###-####, ###-#### ok for temp cn issued 12/6/2001 11:01:15 AM
|
FIRE-Final Inspection | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled 12/6/2001 1:57:08 PM
|
Temporary occupancy | | | 12/6/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4677 issused 12-6-01 to the Barbecue Pit.
|
Plan assigned to (DRS) | 11/30/2001 | 11/30/2001 | 12/5/2001 | | PASS |
Dan Stuart
|
|
|
12/5/2001 10:10:06 DRS - activity updated through activity BLDA022 from case BLD01-03113.
|
Override - Parcel Holds | | | 12/5/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2001 | | PASS |
|
|
|
Approved based on conditions, agreements & plan review comments. Routing to permit desk for issue.
|
Inspection Record Card- Bld | | | 12/5/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/5/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/5/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2001 | | DONE |
|
|
|
talked to gregg to verify plans are ready
|
Issue PAID IN FULL permit | | | 12/5/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/4/2001 | | 12/5/2001 | | PASS |
|
|
|
Approved based on attached plan review conditions, signed agreements between Gregory Carcolice and the PDS plan check division, Planning & CDH, all as part of the approved plans. There is a Deferred Submittal per section 106.2.3.4 of the UBC for the Masonry BBQ Pit Oven construction which needs to be provided, approved and work completed in compliance with code, inspected anf approved before the pit can be used to prepare food.
The steel doors to the PIT have been tack welded closed to prevent use until approval has been given for use by the plan check and inspection divisions of PDS Dept.
|
Meeting | | | 12/5/2001 | | |
|
|
|
Several meeting with owner / tenant, Greg Cracolie revealed that an enclosed masonry oven pit for BBQ of food has been installed without and approval or permits by the Building or Planning Divisions of PDS Dept. An agreement has been made with the owner that he will serve foods prepared outside of the building until the matter of engineering analysis & details for the structure have been presented, approved and work done per the plan completed, inspected and approved befor the BBQ pit can be used. The preparation of food items that do not give off grease laden vapors is allowed, i.e. heating of soup, toasting of bread, micro waving, etc. Mr. Cracolice has signed a letter agreeing to the conditions of that will allow operation of the restaurant whild working on required plans & code upgrades. A copy is attached to the plans.
|
Routing - PUBLIC WORKS | 12/4/2001 | | 12/4/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 12/4/2001 | | 12/4/2001 | | PASS |
|
|
|
|
Application received | | | 11/30/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/30/2001 | | DONE |
|
|
|
1. No specifications included on plans.
2. No building code data on sheets.
|
SUPER- Supervisor's review | 1/4/2002 | 1/4/2002 | | | |
|
|
|
Received copy of e-mail letter sent by Gregory Cracolice to Mayor's Office concerning alleged wrongdoing by inspectors on project. Have referred matter to police for a full investigation. Police indicate that they will be contacting to Teresa Sobotka for more details concerning allegations.
|