BLD-Final | 5/22/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 16:36:31. Contact: ###-####.
|
BLD-Grading Inspection | 5/23/2002 | 5/23/2002 | 5/23/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
DOC - Permit Finaled | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 5/23/2002 1:59:52 PM
|
BLD-Final | 5/22/2002 | 5/23/2002 | 5/22/2002 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 16:10:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/22/2002 at 16:35:14.
|
BLD-Final | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | NR |
Tony Young
|
|
|
TIM ###-####
|
FIRE-Final Inspection | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/21/2002 3:11:36 PM
|
BLD-Framing/Rough-in | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | PASS |
Tony Young
|
|
|
sheer wall ###-#### tim
|
BLD-Framing/Rough-in | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Russ Owen
|
|
|
###-#### TIMM Ok to drywall, call fotr int shear after completed. 3/11/2002 11:35:24 AM
|
BLD-Energy code compliance | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | DONE |
Russ Owen
|
|
|
tim ###-#### energy code . done at am insp. 3/11/2002 3:23:00 PM
|
BLD-Framing/Rough-in | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 18:54:56. Contact: .
c/n posted, ok to insulate,, need fire to sign off after tenting,,, need to see int shear, drywall 3/7/2002 3:01:27 PM
|
BLD-Framing/Rough-in | 3/6/2002 | 3/8/2002 | 3/6/2002 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 18:37:55. Contact: . Disp set to [CANC] by a contractor via Hello! on 03/06/2002 at 18:53:42.
|
BLD-Wall cover | 3/6/2002 | 3/7/2002 | 3/6/2002 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 17:32:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/06/2002 at 18:52:27.
|
BLD-Framing/Rough-in | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N Need trade R/I s approved. air seal Appr plans and Eng. 3/6/2002 12:18:21 PM
|
BLD-Grading Inspection | 1/16/2002 | 1/16/2002 | 1/16/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved foundation subgrade.
|
BLD-Foundation | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Steven Webb
|
|
|
###-#### wip 1/15/2002 11:31:04 AM
|
BLD-Footing | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | PART |
Tony Young
|
|
|
RYAN ###-####
|
BLD-Foundation | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 17:57:20. Contact: ###-####.basement walls, wip 1/4/2002 11:34:56 AM
|
BLD-Footing | 1/2/2002 | 1/3/2002 | 1/3/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/02/2002 at 17:56:56. Contact: ###-####.wip on basement walls 1/3/2002 9:49:38 AM
|
BLD-Footing | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 17:46:02. Contact: ###-####.
verbal ok on soil from Lou @ mti, letter to fax to Terry Records, forms up, steel mostly tied in place in basement ftgs 12/28/2001 11:46:39 AM
|
BLD-Grading Inspection | 12/28/2001 | 12/28/2001 | 12/28/2001 | | DONE |
Rita DeYoung
|
|
|
GEOTECHNICAL ENGINEER HAS APPROVED THE FOOTING SUBGRADE
|
Telephone call | | | 12/18/2001 | | DONE |
|
|
|
permit ready
|
Issue PAID IN FULL permit | | | 12/18/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 12/17/2001 | 12/17/2001 | 12/17/2001 | | PASS |
Dan Overy
|
|
|
12/17/2001 14:44:40 DJO - activity updated through activity BLDA022 from case BLD01-03154.
|
Case Summary (BLD) | | | 12/17/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 12/17/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/17/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/17/2001 | | |
|
|
|
|
Routing - FIRE | 12/10/2001 | | 12/10/2001 | | DONE |
|
|
|
Fire Sprinklers and Class A roof are required.
|
Routing - PUBLIC WORKS | 12/10/2001 | | 12/10/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 12/10/2001 | | 12/10/2001 | | PASS |
|
|
|
|
Application received | | | 12/7/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/7/2001 | | 12/7/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as category 3 with conditions of approval in letter attached to plans
|
Pending Assignment by DJO | 12/7/2001 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/11/2001 | | | | |
|
|
|
|