(CAPITAL CITY FAMILY MEDICINE) This building will be fire sprinklered to substitute for 1-hr fire-resistive construction. To remodel the first floor of a 2 story (with basement) building for occupancy by a medical office. This tenant space will occupy 7,535 square feet of the 8,674 square foot first floor. Building upgrade work covered under this permit includes constructing a new 1-hr stair enclosure, enclosing an existing stairway, and upgrading the elevator to be accessible to the disabled. The entire building shall be fire sprinklered before occupancy. Work is to include 3 restrooms accessible to the disabled, interior nonbearing walls, an exterior canopy with masony columns, 2 interior open stairways, exterior wall finishes, doors, windows, millwork, finishes, and suspended ceilings all per approved drawings, engineering, and plan review conditions on file. Work also includes selective demolition. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. DRH01-00205 PC01-0904 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/20037/14/20037/14/2003 DONE
Additional values from subcontractors.
Permanent Occupancy 6/27/20026/27/2002 DONE
Details
BLD-Final6/27/20026/27/20026/27/2002PPASS
DetailsCarl Dependahl
rec'd stamped eng'g... & eifs certificates ok 6/27/2002 2:12:54 PM
Permanent occupancy  6/27/2002 DONE
Perm. Occ. Cert. #9225 issued 6-27-02 to Capital City Family Medicine.
BLD-Final6/26/20026/26/20026/26/2002PFAIL
DetailsCarl Dependahl
Rob..ENG'G APPROVAL LETTER REQ'S STAMP...SHOULD NOTE CONFIGURATION PER DESIGN...NOT JUST WELDS. 6/26/2002 12:33:56 PM
BLD-Final6/20/20026/21/20026/21/2002ANR
DetailsCarl Dependahl
###-#### ROB keep c/n 6/21/2002 3:12:21 PM
BLD-Conference6/21/20026/21/20026/21/2002PPASS
DetailsCarl Dependahl
8414712 ;keep c/n...need eifs install certs per listing...weep screeds???6/21/2002 3:32:25 PM 6/21/2002 3:33:23 PM
BLD-Conference6/17/20026/18/20026/18/2002AFAIL
DetailsCarl Dependahl
keep c/n; spec insp report inadequate...need eng's ok; EIFS doc's incomplete, install chain barrier at bsmt stair at north enclosure. keep c/n. 6/18/2002 10:59:37 AM
BLD-Conference6/17/20026/17/20026/17/2002PCANC
DetailsCarl Dependahl
rob- ###-#### for conf
BLD-Conference6/17/20026/17/20026/17/2002ANR
DetailsCarl Dependahl
BLD-Conference6/12/20026/12/20026/12/2002PNR
DetailsCarl Dependahl
ROB ###-#### PLEASE CALL 15 MIN BEFORE GOING OUT AS ROB IS AT B. S. U . recall ...need all eifs specs/certifications.... 6/12/2002 4:10:53 PM
BLD-Final6/4/20026/5/20026/5/2002ANR
DetailsCarl Dependahl
awaiting eifs report 6/5/2002 10:34:05 AM
BLD-Conference6/4/20026/4/20026/4/2002APASS
DetailsCarl Dependahl
w/ Guho supt re bsmt barrier...ok to use chain & sign if single gate is obstruction to north exit path per GS. keep c/n, need eng's ok re beams...eifs certification/specs
BLD-Final5/28/20025/29/20025/29/2002ACANC
DetailsCarl Dependahl
###-#### called reschedule 5/29/2002 11:22:10 AM
BLD-Final5/29/20025/29/20025/29/2002PFAIL
DetailsCarl Dependahl
8414712 need efis certs, full eng's' spec insp reports 5/29/2002 4:48:24 PM
Fee Review-notes12/7/200112/7/20015/23/2002 DONE
FIRE-Final Inspection5/21/20025/21/20025/21/2002PPASS
DetailsRick Jackson
ROB ###-####
BLD-Final5/13/20025/14/20025/14/2002AFAIL
DetailsCarl Dependahl
###-#### rob rec'd partial spec.insp report, efis listings...keep c/n...complete other items; OK for t/o only. 5/14/2002 11:39:25 AM
Temporary occupancy  5/14/2002 DONE
Temp. Occ. Cert. #4808 issued 5-14-02 to Capital City Family Medicine.
FIRE-Final Inspection5/13/20025/13/20025/13/2002PPASS
DetailsRick Jackson
ROB ###-####
BLD-Final5/13/20025/13/20025/13/2002PFAIL
DetailsCarl Dependahl
ROB ###-#### c/n other finals, efis listing & install ( verify support at ext infill wall...weep screeds, ec.) 1hr stair enclosure, bsmt barrier gate; Need eng's/spec. insp reports. recall. 5/13/2002 4:19:21 PM
BLD-Final5/10/20025/10/20025/10/2002PNR
DetailsCarl Dependahl
###-####...neeed fire, efis listing, etc..no further insp. 5/10/2002 4:24:40 PM
FIRE-Final Inspection5/10/20025/10/20025/10/2002PFAIL
DetailsRick Jackson
###-#### elevator recall not working; need alarm plans; door hardware at main exit; door closures on stair enclosures; 5/10/2002 4:20:19 PM
FIRE-Alarm Testing5/10/20025/10/20025/10/2002PFAIL
DetailsRick Jackson
###-#### need alarm plans 5/10/2002 4:20:40 PM
FIRE-Final Inspection5/9/20025/9/20025/9/2002PFAIL
DetailsRick Jackson
rob ###-#### door hardware at main exit; alarms not ready; sprinkler escutcheons; FACP and sprinkler control signs on doors; 5/9/2002 4:13:59 PM
FIRE-Sprinkler Rough-in5/3/20025/3/20025/3/2002APASS
DetailsRick Jackson
Added by Inspector: 409 On 5/3/2002 8:12:34 AM okay to cover
BLD-Framing/Rough-in4/30/20025/1/20025/1/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/30/2002 at 16:56:58. Contact: ###-####. add spreaders at grid...ok to tile pend elec/hvac 5/1/2002 2:08:23 PM
BLD-Framing/Rough-in4/26/20024/26/20024/26/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/26/2002 at 07:07:17. Contact: ###-####. ext canopy ok to cover; show efis listings 4/26/2002 2:01:56 PM
BLD-Framing/Rough-in4/22/20024/23/20024/23/2002AFAIL
DetailsCarl Dependahl
###-#### keep c/n, add blocks at canopy., chk stair enclosures...shaft not req'd at riser per rick j. 4/23/2002 12:21:57 PM
BLD-Framing/Rough-in4/22/20024/22/20024/22/2002PFAIL
DetailsCarl Dependahl
fr insp- ###-####- rob ...c.n canopy , grid clg, firestops, recall 4/22/2002 3:10:42 PM 4/22/2002 3:14:52 PM
Plan resubmittals received  4/1/2002 DONE
Received two copies of revised sheet A1.1. Approved by Sarah Schafer 4/1/02. Put one copy with plans and second copy to site via Billy English. kmm
BLD-Foundation3/15/20023/15/20023/15/2002PPART
DetailsCarl Dependahl
found rob ###-#### , upper lift at masonry cols ok 3/15/2002 1:31:56 PM
BLD-Foundation3/14/20023/14/20023/14/2002PPART
DetailsCarl Dependahl
found rob ###-####
BLD-Foundation3/13/20023/13/20023/13/2002PPART
DetailsCarl Dependahl
found rob ###-#### masonry lift ok; wip on stair enclosures 3/13/2002 4:15:31 PM
BLD-Foundation3/12/20023/12/20023/12/2002PPART
DetailsCarl Dependahl
found rob- ###-#### , masonry cols, bsmt col ftgs ok 3/12/2002 2:35:06 PM
BLD-Conference3/8/20023/11/20023/11/2002APART
DetailsJim Storey
###-#### ROB grout ok under steel colums. 3/11/2002 1:56:40 PM
BLD-Conference3/11/20023/11/20023/11/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/11/2002 11:25:55 AM w/ bldr re stair framing...provide 1hr detail
BLD-Framing/Rough-in3/4/20023/4/20023/4/2002PPASS
DetailsTom Arcoraci
###-#### ROB 1st floor ok for cover 3/4/2002 2:29:27 PM
BLD-Footing2/27/20022/28/20022/28/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/27/2002 at 17:18:37. Contact: ###-####...1st lift cols. at entry ok. 2/28/2002 5:30:05 PM
BLD-Footing2/20/20022/21/20022/21/2002APART
DetailsCarl Dependahl
ROB ###-####
BLD-Conference2/7/20022/7/20022/7/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/7/2002 11:45:37 AM w/ Guho supt...widen stairs as req'd in plan notes
BLD-Conference2/6/20022/6/20022/6/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/6/2002 12:14:57 PM w/ GS & Bob onsite...re stair width, install at 44"
BLD-Conference2/4/20022/4/20022/4/2002PPASS
DetailsCarl Dependahl
###-####; w/ arch. Billy English & bldr, re-calc occ. load & submit request for use of 36" stairs where > 50 occupants per UBC 1003. 2/4/2002 2:35:29 PM
Telephone call  1/25/2002 DONE
left mess for billy english that permit is ready-also need a.c.h.d./mls
Issue PAID IN FULL permit  1/25/2002 DONE
Routing - PLANNING1/23/2002 1/24/2002  
Failed. The revised plan showing the 5% landscaping has not been incorporated into the building set.
Routing - PLAN CHECK1/24/2002 1/24/2002 PASS
Plan resubmittals received  1/24/2002 DONE
Received two copies of revised sheets A1.1, A1.2, one copy of cover letter. Routed to Carl W. kmm
Routing - PLANNING1/24/2002 1/24/2002 PASS
Approved per DRH01-00205.
PLANS/APPL TAKEN TO FRONT DESK  1/24/2002 PASS
Inspection Record Card- Bld  1/24/2002 DONE
Print Occupancy Form  1/24/2002 DONE
Plan assigned to (CJW)12/11/2001 1/24/2002 PASS
DetailsCarl Westfall
1/24/2002 14:19:28 CJW - activity updated through activity BLDA022 from case BLD01-03156.
Routing - PLAN CHECK1/18/2002 1/23/2002 PASS
Drawings approved, with conditions, after 2nd resubmittal review.
Plan resubmittals received  1/22/2002 DONE
Received two sets of resubmittal sheets A2.1, A5.1, A5.2, A5.3, A5.4, A6.1, A6.2, (2) SETS OF STRUCTURAL CALCULATIONS, AND COVER LETTER. ROUTED TO CARL WESTFALL.
Routing - PLAN CHECK1/2/2002 1/17/2002  
Failed 2nd UBC plan review. January 14, 2002 resubmittal reviewed January 17, 2002. Resubmitted drawings were required from the architect. See the conditions list.
Routing - PLANNING1/17/2002 1/17/2002  
Failed. The change in parking layout does not incorporate the 5% landscape requirement. Applicant has been notified.
Plan resubmittals received  1/15/2002 DONE
Received two copies of revised sheets A1.1 and A1.2, one copy of cover letter. routed to Carl W. kmm
Plan resubmittals received  1/14/2002 DONE
Reeived two copies of A1.2 and three copies of revised sheets A0.0, A1.1, A1.2, A2.0,, A2.1, A2.2, A3.1, A4.1, A5.1, A5.2, A5.3, A5.4, A6.1, A6.2, A7.1, M1.0, M2.0, M3.0, M3.1, M4.0, FP1.0, Routed to Carl W. kmm
Routing - FIRE12/31/2001 1/2/2002 PASS
Plan Review Completed(1st rev)  1/2/2002  
Failed first UBC and Planning review.
Routing - PLAN CHECK12/19/2001 12/31/2001  
Failed first UBC review. UBC plan review started December 26, 2001 and finished December 31, 2001. Resubmitted drawings from the architect were required. See the conditions list. A report was sent to the architect.
Plan resubmittals received  12/28/2001 DONE
Received two sets of resubmittal sheet A1.1 with cover letter. Routed to Carl Westfall.
Routing - PLANNING12/18/2001 12/19/2001  
Failed. Sarah Schafer. Does not comply with conditions of DRH01-205.
Routing - PLUMBING12/13/2001 12/18/2001 PASS
verify thermol expantion tank sizing with field inspector, if an automatic soap dispensor is installed at the janitor sink, provide a water supply for it, if 1st floor isnt concrete, provide a drip pan for the water heater, table 7-5 note, run 2 1/2" vent to the water closet at col. D-8, 2" vents at col. A-3 page M3.0 must tie together above flood level rim of the fixtures,
Routing - PUBLIC WORKS12/11/2001 12/13/2001 PASS
Plans ACCEPTED BY PLAN TECH  12/7/2001 DONE
1. Plans not fully dimensioned.
Application received  12/7/2001  
Recd Pcfee & Taken To Pln CK  12/7/2001 DONE