Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD01-03163
StatusFinaled
Name PAMELA HUMPHREY
Site Address 1311 -13 W EASTMAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3480 sq. ft. three story DUPLEX. Each unit is a two bedroom, two and half bathroom 1740 sq. ft. unit (152 sq. ft. first floor/794 sq. ft. second floor/794 sq. ft. third floor) with a attached 642 sq. ft. tandem garage on the first floor of each unit. There is also a 40 sq. ft. covered back porch, a 66 sq. ft. deck off the second floor and a 16 sq. ft. landing with stairs off the third floor to the second floor deck. Per approved plans, engineering and requirement list. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALLS IS DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. NOTE: conversion permits and either a recorded sebdivision or a zoning certificate and recorded record of survey must be completed prior to selling as individual units. PC#839 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20028/7/20028/7/2002PPASS
DetailsTony Young
DOC - Permit Finaled8/7/20028/7/20028/7/2002PPASS
DetailsTony Young
Finaled by inspector at 8/7/2002 2:53:21 PM
BLD-Conference8/5/20028/5/20028/5/2002PPASS
DetailsCarl Dependahl
duplex prior to conversion; parcel hold removed per malene. 8/5/2002 1:54:09 PM
BLD-Conference8/5/20028/5/20028/5/2002PCANC
DetailsCarl Dependahl
BLD-Conference8/5/20028/5/20028/5/2002PPASS
DetailsCarl Dependahl
w/ Marlene re final, parcel ok 8/5/2002 3:40:41 PM
BLD-Final7/31/20027/31/20027/31/2002PFAIL
DetailsJim Storey
ROB ###-#### parcial hold no final until resolved. 7/31/2002 3:23:44 PM
BLD-Conference6/28/20027/1/20027/1/2002ACANC
DetailsTony Young
check stairs on exterior
BLD-Conference7/1/20027/1/20027/1/2002PNR
DetailsRuss Owen
check stairs,( not yet built). 7/1/2002 4:04:43 PM
BLD-Framing/Rough-in6/28/20026/28/20026/28/2002PNR
DetailsTony Young
rick- ###-#### for stair insp
Override - Parcel Holds  6/28/2002  
BLD-Energy code compliance5/17/20025/17/20025/17/2002APASS
DetailsDave Hannah
Added by Inspector: 425 On 5/17/2002 7:33:39 AM
BLD-Framing/Rough-in5/16/20025/16/20025/16/2002PPASS
DetailsDave Hannah
###-#### justin fr ok to cover 5/16/2002 3:55:51 PM
BLD-Energy code compliance5/15/20025/16/20025/16/2002APART
DetailsDave Hannah
###-#### JUSTN CALL 1ST still working on c/n items 5/16/2002 11:17:47 AM
Override - Parcel Holds  5/16/2002  
   5/15/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: DO NOT issue final letter of compliance for the duplex until the land division issues are cleared up. A duplex requries a ROS to combine parcels into one parcel. A townhouse requires a ROS to reduce density. Either way new deeds may be required. - Karen Reason for OverRide:
BLD-Energy code compliance5/14/20025/14/20025/14/2002PFAIL
DetailsCarl Dependahl
justin ###-#### -for duplex
BLD-Framing/Rough-in5/14/20025/14/20025/14/2002PFAIL
DetailsCarl Dependahl
2nd c/n...
Override - Parcel Holds  5/14/2002  
BLD-Framing/Rough-in5/6/20025/7/20025/7/2002APART
DetailsTony Young
JUSTIN ###-#### FR
ok ti insulate, c/n posted, need truss engineering, fire blocks, point load studs, seal r/a, etc. 5/7/2002 11:30:52 AM
Override - Parcel Holds  5/6/2002  
BLD-Framing/Rough-in5/3/20025/3/20025/3/2002PNR
DetailsCarl Dependahl
keep c/n, add fireblocks, backing for gyp at 1hr walls, etc...met bldr onsite...wip 5/3/2002 6:06:02 PM
Override - Parcel Holds  5/3/2002  
BLD-Framing/Rough-in4/29/20024/30/20024/30/2002ANR
DetailsCarl Dependahl
###-####....call 1st please, justin.; complete fireblocking, prep 1hr walls, support landings int/ ext...recall. 4/30/2002 11:03:34 AM
BLD-Framing/Rough-in4/29/20024/29/20024/29/2002PNR
DetailsCarl Dependahl
###-####
Override - Parcel Holds  4/29/2002  
BLD-Framing/Rough-in3/21/20023/21/20023/21/2002PPART
DetailsCarl Dependahl
shear wall justin ###-#### hd's, sheqarwall nailing ok; ok to side 3/21/2002 3:42:23 PM
Override - Parcel Holds  3/21/2002  
BLD-Framing/Rough-in3/15/20023/15/20023/15/2002PPART
DetailsCarl Dependahl
ready at 1 ###-#### party wall attic trusses rocked on int, ok 3/15/2002 2:03:07 PM
Override - Parcel Holds  3/15/2002  
BLD-Framing/Rough-in3/13/20023/14/20023/14/2002PPART
DetailsCarl Dependahl
JUSTIN ###-#### 3rd fl int side fire walls, fireblocks in at 10' horiz. intervals 3/14/2002 11:24:13 AM
BLD-Conference3/14/20023/14/20023/14/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/14/2002 10:05:37 AM w/ framer re firewall req's; need shearwall hdwe installed; wip. Spoke w/ truss manuf'r re rough handling of trusses (Sta-Rite Truss) at delivery...chk trusses for damege at full frame insp.
Override - Parcel Holds  3/13/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: DO NOT issue final letter of compliance for the duplex until the land division issues are cleared up. A duplex requries a ROS to combine parcels into one parcel. A townhouse requires a ROS to reduce density. Either way new deeds may be required. - Karen Reason for OverRide:
Override - Parcel Holds  3/13/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: DO NOT issue final letter of compliance for the duplex until the land division issues are cleared up. A duplex requries a ROS to combine parcels into one parcel. A townhouse requires a ROS to reduce density. Either way new deeds may be required. - Karen Reason for OverRide:
BLD-Framing/Rough-in3/5/20023/6/20023/6/2002APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/5/2002 5:47:01 PM party walls/fireblocks, 1st fl. party walls & rim area ok to stand...5/8 gyp ok as shear ...ok to delete osb at party wall 3/6/2002 1:18:44 PM
BLD-Framing/Rough-in3/5/20023/5/20023/5/2002PNR
DetailsCarl Dependahl
JUSTIN ###-#### ( MASON )
Override - Parcel Holds  3/5/2002  
Override - Parcel Holds  3/5/2002  
BLD-Framing/Rough-in3/4/20023/4/20023/4/2002PNR
DetailsTom Arcoraci
center wall insp for duplexes justin ###-#### per 340 3/4/2002 1:39:06 PM
Override - Parcel Holds  3/4/2002  
BLD-Conference3/1/20023/1/20023/1/2002PPASS
DetailsCarl Dependahl
###-#### provide dbl 1hr walls , int layer gyp3/1/2002 4:48:23 PM 3/1/2002 4:49:51 PM
Override - Parcel Holds  3/1/2002  
BLD-Conference2/28/20022/28/20022/28/2002PPASS
DetailsCarl Dependahl
###-####, need details, add'l insps for firewalls...no good as built. 2/28/2002 12:20:11 PM
BLD-Foundation1/31/20021/31/20021/31/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/31/2002 at 07:21:19. Contact: ###-####. walls,, discussed bolt placement, ok to wet set 1/31/2002 12:10:55 PM
BLD-Footing1/25/20021/25/20021/25/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/25/2002 at 06:10:09. Contact: ###-####....add bar at int ftgs as shown; clarify hold down bolts at front & rear walls...3 ft depth req'd by plan chk...watch anchor bolt spacing at shear walls 1/25/2002 12:05:10 PM
Routing - PLAN CHECK12/27/2001 1/17/2002 DONE
Plan assigned to (SAM)1/2/2002 1/17/2002 PASS
DetailsSteve Munroe
1/17/2002 10:18:52 SAM - activity updated through activity BLDA022 from case BLD01-03163.
Plan Review Report  1/17/2002  
PLANS/APPL TAKEN TO FRONT DESK  1/17/2002 DONE
Inspection Record Card- Bld  1/17/2002 DONE
Telephone call  1/17/2002 DONE
spoke with pam plans ready
Issue PAID IN FULL permit  1/17/2002 DONE
Plan Reviewer's activity  1/3/2002 PEND
I called and talked to Rob Truax on 1/2/02. He is planning on coming to City Hall on 1/3/02 in the morning to pick up of list of corrections and plans.
Pending Assignment by DJO12/10/2001 1/2/2002 DONE
DetailsDan Overy
1/2/2002 09:18:26 SAM - activity updated through activity BLDA183 from case BLD01-03163.
Routing - PLANNING12/10/2001 12/27/2001 PASS
Routing - PUBLIC WORKS12/26/2001 12/27/2001 PASS
Application received  12/10/2001