BLD-Final | 4/30/2002 | 4/30/2002 | 4/30/2002 | P | PASS |
Jim Storey
|
|
|
###-#### CHRIS
|
DOC - Permit Finaled | 4/30/2002 | 4/30/2002 | 4/30/2002 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 4/30/2002 4:26:03 PM
|
BLD-Final | 4/23/2002 | 4/24/2002 | 4/24/2002 | A | CANC |
Jim Storey
|
|
|
###-#### chris call 1st
|
BLD-Final | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | NR |
Jim Storey
|
|
|
fn tim ###-#### need mech 4/23/2002 4:30:22 PM
|
BLD-Energy code compliance | 3/15/2002 | 3/15/2002 | 3/15/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 06:57:40. Contact: ###-####.
|
BLD-Energy code compliance | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 18:05:57. Contact: ###-####. Posted a c/n for a abs plumbing vent in the exterior wall of the 2nd floor bathroom, it has been caped and never got reconnected. 3/12/2002 10:28:59 AM
|
BLD-Framing/Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 18:51:31. Contact: ###-#### 3/8/2002 10:07:42 AM
|
BLD-Framing/Rough-in | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | FAIL |
Dave Hannah
|
|
|
chris- ###-#### fr c/n on site do not insulate until seal package has been inspected 3/5/2002 2:13:31 PM
|
BLD-Framing/Rough-in | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 17:59:21. Contact: ###-####. exterior nailling ok for cover. 2/14/2002 9:31:15 AM
|
BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 20:09:48. Contact: ###-####.shear panel inspection c/n on site 2/12/2002 10:43:32 AM
|
Voucher Form | | | 2/4/2002 | | DONE |
|
|
|
had a house on the lot that they removed so no park fees apply
|
BLD-Foundation | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 13:38:06. Contact: ###-####.
|
BLD-Footing | 1/15/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Jim Storey
|
|
|
DALE ###-#### pwoi 1/16/2002 3:10:58 PM
|
BLD-Footing | 1/15/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Jim Storey
|
|
|
DALE ###-#### pwoi 1/16/2002 3:10:58 PM
|
BLD-Footing | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | NR |
Jim Storey
|
|
|
DALE ###-####
|
BLD-Footing | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | NR |
Jim Storey
|
|
|
DALE ###-####
|
(F) Reprint permit | | | 1/2/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/28/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 12/19/2001 | 12/19/2001 | 12/19/2001 | | PASS |
Dan Overy
|
|
|
12/19/2001 09:06:58 DJO - activity updated through activity BLDA022 from case BLD01-03183.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/19/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/19/2001 | | |
|
|
|
|
Routing - PLANNING | 12/14/2001 | 12/14/2001 | 12/14/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/14/2001 | | 12/14/2001 | | PASS |
|
|
|
|
Application received | | | 12/13/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 12/14/2001 | | | | |
|
|
|
|
Pending Assignment by DJO | 12/13/2001 | | | | |
Dan Overy
|
|
|
|