Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-03197
StatusExpired
Name BOISE AIRPORT - SECURITY CHECKPOINT
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-SECURITY CHECKPOINT
Customer Number 
ePlanReviewNo
Description
(BOISE AIRPORT - SECURITY CHECKPOINT) This building is fire sprinklered for building area increase. To remodel the Security Checkpoint at the Boise City Air Terminal to accommodate additional security screening equipment. Two security offices will be eliminated. Work is to include the demolition of interior nonbearing walls, modifying the existing suspended ceilings, and patching the carpet all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. This permit DOES NOT alter the Airport's Certificate of Occupancy. PC01-0924 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/21/20037/21/20037/21/2003 PASS
DetailsJim Storey
bldg. is no longer here demo. 7/21/2003 8:27:13 AM
DOC - Permit Expired7/21/20037/21/20037/21/2003APASS
DetailsJim Storey
Expired by inspector at 7/21/2003 8:27:16 AM
BLD-Aging Inspection5/20/20035/20/20035/20/2003 NR
DetailsJim Storey
pending others. 5/20/2003 8:41:08 AM
BLD-Aging Inspection3/18/20033/18/20033/18/2003 PART
DetailsJim Storey
dwyane marller with airpot mangment to follow up. 3/21/2003 11:38:09 AM
FIRE-Final Inspection3/14/20023/14/20023/14/2002PFAIL
DetailsRick Jackson
duane --###-#### fre fn-- need additional sprinkler at new wall where sprinklers are overspaced 3/14/2002 1:41:41 PM
BLD-Conference3/5/20023/5/20023/5/2002PPART
DetailsJim Storey
Scheduled by Inspector: 301 On 3/5/2002 4:06:13 PM final ok pending ele and fire sign offs. 3/5/2002 4:14:25 PM
Issue & PRINT to be Invoiced  2/15/2002 DONE
Routing - FIRE1/2/20021/3/20021/3/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  1/3/2002 DONE
Routing - PLAN CHECK1/3/2002 1/3/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/3/2002 PASS
Inspection Record Card- Bld  1/3/2002  
Print Occupancy Form  1/3/2002 DONE
Telephone call  1/3/2002 DONE
CALLED AND LEFT VOICE MESSAGE FOR MATT
Print Occupancy Form  1/3/2002  
Plan assigned to (CJW)12/19/2001 1/3/2002 PASS
DetailsCarl Westfall
1/3/2002 08:43:35 CJW - activity updated through activity BLDA022 from case BLD01-03197.
Routing - PLAN CHECK12/19/2001 1/2/2002 PASS
Drawings approved.
Plans ACCEPTED BY PLAN TECH  12/14/2001 DONE
Application received  12/13/2001  
Fee Review-notes12/13/200112/13/2001   
will be a JV