BLD-Final | 7/12/2002 | 7/15/2002 | 7/15/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 10:54:14. Contact: ###-####.
|
DOC - Permit Finaled | 7/15/2002 | 7/15/2002 | 7/15/2002 | A | PASS |
Russ Owen
|
|
|
Finaled by inspector at 7/15/2002 10:55:23 AM
|
BLD-Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 12:26:32. Contact: ###-####.c/n posted on window. 7/11/2002 10:37:52 AM
|
BLD-Energy code compliance | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PASS |
Jim Sly
|
|
|
todd- ###-#### energy code
|
BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 | P | PASS |
Jim Sly
|
|
|
###-#### TODD
|
BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Dave Hannah
|
|
|
###-#### second floor calls for shear panels on the se and sw corners these are int walls need to install or get engineer alt 4/22/2002 1:44:27 PM
|
BLD-Foundation | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 13:14:47. Contact: .
|
BLD-Footing | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PART |
Jim Sly
|
|
|
ft insp - bob ###-####
|
Issue PAID IN FULL permit | | | 3/6/2002 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2002 | | DONE |
|
|
|
talked to todd to verify plans are ready/may have to change plans/todd will let me know/mls
|
Plan assigned to (DJO) | 12/21/2001 | 12/21/2001 | 12/21/2001 | | PASS |
Dan Overy
|
|
|
12/21/2001 09:17:42 DJO - activity updated through activity BLDA022 from case BLD01-03213.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/21/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 12/21/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plans ACCEPTED BY PLAN CHECK | | | 12/21/2001 | | |
|
|
|
|
Routing - PLANNING | 12/17/2001 | | 12/18/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/18/2001 | | 12/18/2001 | | PASS |
|
|
|
|
Pending Assignment by DJO | 12/17/2001 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/18/2001 | | | | |
|
|
|
|