Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-03219
StatusFinaled
Name BRUCE MURDOCH (OWN REP)
Site Address 13125 W PERSIMMON LN Unit: 101
Project NameMAHOGANY BUSINESS PARK
Customer Number 
ePlanReviewNo
Description
(BOISE MOUNTAIN EYE) This building is NOT fire sprinklered. To construct a 1,878 square foot Optometrist Office within a 6,040 square foot building. Also, to construct 714 square feet of common area (hallway, vestibules, and restrooms) within the same building. Work is to include interior nonbearing walls, 3 restrooms accessible to the disabled, interior finishes, and suspended ceilings all per approved drawings and plan review conditions on file. PC01-0927 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/20037/14/20037/14/2003 DONE
Additional values from subcontractors.
Permanent occupancy  5/13/2002 DONE
Perm. Occ. Cert. #9132 issued 5-13-02 to Boise Mountain Eye in the Mahogany Office Park Bldg.
BLD-Final5/9/20025/10/20025/10/2002APASS
DetailsJim Sly
fn tim- ###-#### OK for Perm. Occ. 5/10/2002 12:35:34 PM
Permanent Occupancy 5/10/20025/10/2002 DONE
Details
Fee Review-notes12/18/200112/18/20014/26/2002 DONE
BLD-Final4/12/20024/12/20024/12/2002PPART
DetailsJim Sly
HERB 863 -2930 OK for temp Occ. C/N obtain perm occ status within 90 days of this notice. 4/12/2002 12:49:55 PM
Temporary occupancy  4/12/2002 DONE
Temp. Occ. Cert. #4787 issued 4-12-02 to Boise Mountain Eye.
FIRE-Final Inspection3/25/20023/25/20023/25/2002PPASS
DetailsTroy Cobbley
fire life/safety finaled 3/25/2002 2:26:04 PM
BLD-Conference3/25/20023/25/20023/25/2002PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/25/2002 at 10:44:54. Contact: ###-####.
BLD-Other3/1/20023/1/20023/1/2002PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/01/2002 at 10:05:56. Contact: ###-####. Ceiling grid OK. 3/1/2002 4:07:30 PM
FIRE-Conference2/20/20022/20/20022/20/2002PNR
DetailsTroy Cobbley
Had conference with contractor. Asked him to install one more fire extinguisher in corridor, add exit sign at north exit. Placement of other exit signs and emergency lights OK 2/20/2002 2:09:02 PM
BLD-Framing/Rough-in2/7/20022/8/20022/8/2002PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/07/2002 at 11:25:39. Contact: ###-####.
Inspection Record Card- Bld  1/14/2002 DONE
Issue PAID IN FULL permit  1/14/2002 DONE
Routing - PLUMBING1/7/2002 1/11/2002 PASS
the 3 sinks in the office area are future fixtures and no piping is to be installed for them. resubmittals will be required when they are installed.
Routing - PLAN CHECK1/11/2002 1/11/2002 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  1/11/2002 PASS
Inspection Record Card- Bld  1/11/2002 DONE
Print Occupancy Form  1/11/2002 DONE
Telephone call  1/11/2002 DONE
left mess that permit is ready
Plan assigned to (CJW)12/21/2001 1/11/2002 PASS
DetailsCarl Westfall
1/11/2002 14:36:45 CJW - activity updated through activity BLDA022 from case BLD01-03219.
Plan resubmittals received  1/9/2002 DONE
Received two copies of revised sheet A2. one copy of transmittal sheet. Routed to Carl W. kmm
Routing - PLAN CHECK12/26/2001 1/7/2002  
Failed first UBC review. UBC plan review started January 4, 2002 and finished January 7, 2002. Revised drawings from the architect were required. See the conditions list. A plan review report was sent to the architect.
Routing - FIRE1/7/2002 1/7/2002 PASS
APPROVED AS DRAWN
Plan Review Completed(1st rev)  1/7/2002 DONE
Routing - PUBLIC WORKS12/21/2001 12/26/2001 PASS
Plans ACCEPTED BY PLAN TECH  12/18/2001 DONE
Application received  12/18/2001  
Recd Pcfee & Taken To Pln CK  12/18/2001 DONE