Fee Review-notes | 7/14/2003 | 7/14/2003 | 7/14/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent occupancy | | | 5/13/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9132 issued 5-13-02 to Boise Mountain Eye in the Mahogany Office Park Bldg.
|
BLD-Final | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | PASS |
Jim Sly
|
|
|
fn tim- ###-#### OK for Perm. Occ. 5/10/2002 12:35:34 PM
|
Permanent Occupancy | | 5/10/2002 | 5/10/2002 | | DONE |
|
|
|
|
Fee Review-notes | 12/18/2001 | 12/18/2001 | 4/26/2002 | | DONE |
|
|
|
|
BLD-Final | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | PART |
Jim Sly
|
|
|
HERB 863 -2930 OK for temp Occ. C/N obtain perm occ status within 90 days of this notice. 4/12/2002 12:49:55 PM
|
Temporary occupancy | | | 4/12/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4787 issued 4-12-02 to Boise Mountain Eye.
|
FIRE-Final Inspection | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 3/25/2002 2:26:04 PM
|
BLD-Conference | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/25/2002 at 10:44:54. Contact: ###-####.
|
BLD-Other | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 10:05:56. Contact: ###-####. Ceiling grid OK. 3/1/2002 4:07:30 PM
|
FIRE-Conference | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | NR |
Troy Cobbley
|
|
|
Had conference with contractor. Asked him to install one more fire extinguisher in corridor, add exit sign at north exit. Placement of other exit signs and emergency lights OK 2/20/2002 2:09:02 PM
|
BLD-Framing/Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 11:25:39. Contact: ###-####.
|
Inspection Record Card- Bld | | | 1/14/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/14/2002 | | DONE |
|
|
|
|
Routing - PLUMBING | 1/7/2002 | | 1/11/2002 | | PASS |
|
|
|
the 3 sinks in the office area are future fixtures and no piping is to be installed for them. resubmittals will be required when they are installed.
|
Routing - PLAN CHECK | 1/11/2002 | | 1/11/2002 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/11/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (CJW) | 12/21/2001 | | 1/11/2002 | | PASS |
Carl Westfall
|
|
|
1/11/2002 14:36:45 CJW - activity updated through activity BLDA022 from case BLD01-03219.
|
Plan resubmittals received | | | 1/9/2002 | | DONE |
|
|
|
Received two copies of revised sheet A2. one copy of transmittal sheet. Routed to Carl W. kmm
|
Routing - PLAN CHECK | 12/26/2001 | | 1/7/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started January 4, 2002 and finished January 7, 2002. Revised drawings from the architect were required. See the conditions list. A plan review report was sent to the architect.
|
Routing - FIRE | 1/7/2002 | | 1/7/2002 | | PASS |
|
|
|
APPROVED AS DRAWN
|
Plan Review Completed(1st rev) | | | 1/7/2002 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/21/2001 | | 12/26/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/18/2001 | | DONE |
|
|
|
|
Application received | | | 12/18/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/18/2001 | | DONE |
|
|
|
|