Permit Information
Permit NumberBLD01-03229
StatusFinaled
Name VFP VC
Site Address 3548 S FINDLEY AVE
Project NameFAMILY CENTER
Customer Number 
ePlanReviewNo
Description
(PETCO)(FAMILY CENTER PAD P2) New 11,791 sq.ft. retail tenant with pet grooming in vacant shell building done under BLD01-03228 per approved plans on file. Work to include widening rear exterior exit door, two new accessible restrooms, new interior entry vestibule, new interior walls and doors, new interior windows, interior finish, some new suspended ceiling areas, fire sprinkler work, new plumbing, new mechanical work including HVAC rooftop units, and new electrical work. The one-hour rated tenant demising wall is existing from the shell building permit. A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. NOTE: This building is fully fire sprinklered for area increase. This building and the building to the south were reviewed as all one building for allowable area provisions under the shell permit. NOTE: Some Racking/Shelving exceeding 8' in height will be provided in the space and will be done under a separate permit. (PC#0935-01) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/20037/14/20037/14/2003 DONE
Permanent occupancy  12/17/2002 DONE
Perm. Occ. Cert. #9476 issued 12-17-02 to PETCO.
Permanent Occupancy 12/16/200212/16/2002 DONE
Details
FIRE-Final Inspection12/13/200212/16/200212/16/2002APASS
DetailsRick Jackson
Joseph, ###-####
BLD-Final12/13/200212/16/200212/16/2002PPASS
DetailsJim Storey
Joseph - ###-####
Telephone call  10/24/2002 DONE
telcon with Joseph Lamay in conjuction with a call from him on another project. Advised him of expiry date for this TOC and reminded him of our previous discussion of the need for doing additional alarm work and getting FA plans in before doing required work. He was aware of this but hadn't been able to determine who the alarm contractor was who installed the sprinkler monitoring alarm system at shell stage. Advised him that it was ADS; gave him name and phone # to contact them . He indicated he would get them on it right away.
Telephone call  10/24/2002 DONE
Talked w/Joe Lamay re: status of temp. - going to resubmit plans for fire alarm & will send letter requesting extension for temp. occ.
Meeting  10/8/2002 DONE
Upon FD review of the alarm situation, relative to the two buildings being considered as one builidng under the Bldg Code, it is agreed to allow/accept the separate alarm system installed at the shell stage of this building. Since these buildings are physically separated by approximately 20' and have separate addresses, having separate alarm systems will present less confusion to the responding FD unit. Resolution of the "temporary occupancy certificate" will only require FA system monitoring of duct smoke detectors for airhandler shut down, as required by UMC 608. A separate FA permit will be required to install/connect these duct detectors to the alarm system. Joseph Lemay. TOK, advised by phone of this decision and the requirement for a FA permit for the duct detectors.
BLD-Final7/25/20027/26/20027/26/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/25/2002 at 08:10:22. Contact: ###-####. temp ok pending others. 7/26/2002 1:10:14 PM
FIRE-Final Inspection7/26/20027/26/20027/26/2002PPART
DetailsRick Jackson
temp occ approved per approval from Sam Rogers pending resolution of the fire alarms for Petco
Temporary occupancy  7/26/2002 DONE
Temp occ #4840 issued 7/26/02 aml To Petco
Plan Reviewer's activity  7/25/2002 DONE
RE FA's. FA system plans for Petco were rejected 6/27/02 under FIR02-00243, because it has to include the eintire building which includes the adjacent existing building, as noted in the BLD reviewers scope comments. However, a FA system for this shell building was inadvertently approved 5/22/02 under FIR02-00112, and has been installed. Per approval of Dave Miller, this "shell" building FA system, if approved per those plans by final field inspection, may be accepted temporarily to allow a TOC to be issued to Petco to occupy the building. This TOC is for 90 days, to allow the necessary modifications to be completed to connect the new building to the existing building alarm system, in an approved manner.
BLD-Other7/15/20027/16/20027/16/2002PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/15/2002 at 15:21:22. Contact: ###-####.need to check wires on lights at final. 7/16/2002 3:56:46 PM
BLD-Framing/Rough-in6/5/20026/5/20026/5/2002APASS
DetailsJim Storey
walls ok for cover.
Issue PAID IN FULL permit  5/7/2002 DONE
Routing - PLAN CHECK4/19/2002 5/6/2002 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  5/6/2002 PASS
Inspection Record Card- Bld  5/6/2002 DONE
Print Occupancy Form  5/6/2002 DONE
Plan assigned to (JCB)12/21/2001 5/6/2002 PASS
DetailsJason Blais
5/6/2002 13:18:28 JCB - activity updated through activity BLDA022 from case BLD01-03229.
Plan resubmittals received  5/3/2002 DONE
Received two copies of revised sheetsA0.1, A2.3, A2.5, A3.1, A8.1, E2.1, F2M and one copy of response letter. Routed to Jason B. kmm
Plan Review Completed(1st rev)  4/19/2002 FAIL
Routing - FIRE4/12/2002 4/19/2002 PASS
Routing - PLAN CHECK1/18/2002 4/12/2002 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  4/12/2002  
Plan resubmittals and written response required for further review.
Routing - PUBLIC WORKS12/21/2001 1/18/2002 PASS
Routing - PLAN CHECK1/18/2002 1/18/2002 HOLD
Tenant Plans on HOLD. Shell building permit has not been reviewed or issued yet.
Plans ACCEPTED BY PLAN TECH  12/20/2001 DONE
1. Plans not fully dimensioned.
First Notice12/19/200112/19/200112/19/2001 DONE
Application received  12/19/2001  
Recd Pcfee & Taken To Pln CK  12/19/2001 DONE