Second Notice BLD | 4/14/2006 | 4/14/2006 | 4/17/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/27/2006 | 3/27/2006 | 4/14/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PASS |
Jim Sly
|
|
|
Final R. Owen C/C Cathy W.
|
DOC - Permit Finaled | 3/27/2006 | 3/23/2006 | 3/27/2006 | A | PASS |
Jim Sly
|
|
|
Previously finaled by Russ Owen....C/C by Cathy W.
|
Letter of compliance | | | 9/30/2002 | | DONE |
|
|
|
Letter of Compliance #22738 issued 9-30-02.
|
BLD-Final | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 13:33:10. Contact: ###-####.
|
FIRE-Final Inspection | 3/28/2002 | 3/28/2002 | 3/28/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 3/28/2002 8:19:57 AM
|
Issue & PRINT to be Invoiced | | | 2/4/2002 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/1/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets S2.1 and S2.2. routed to Dan Stuart.
|
Additional plans submitted | | | 2/1/2002 | | PASS |
|
|
|
NEW REVISED STRUCTURAL SHEETS PROVIDED. WILL INSERT INTO PLANS ALLREADY AT PERMIT DESK FOR ISSUE & INTO OFFICE PLAN COPY.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2002 | | PASS |
|
|
|
TO PERMIT DESK FOR ISSUE PROCESSING.
|
Inspection Record Card- Bld | | | 1/31/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/31/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/31/2002 | | DONE |
|
|
|
LEFT MESS FOR JOHN MULLIN THAT PERMIT IS READY
|
Plan assigned to (DRS) | 12/24/2001 | | 1/31/2002 | | PASS |
Dan Stuart
|
|
|
1/31/2002 07:29:15 DRS - activity updated through activity BLDA022 from case BLD01-03237.
|
Routing - FIRE | 1/25/2002 | 1/28/2002 | 1/28/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 1/28/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/11/2002 | | 1/25/2002 | | PEND |
|
|
|
Approved as noted and attached. Routing to fire code analyst for review.
|
Routing - PLUMBING | 12/26/2001 | | 1/11/2002 | | PASS |
|
|
|
these plans took so long to review because the arch. told me he would have the engineer call to answer questions and it took a week and a half, after my discussion with the engineer- move the icw r.p. to the main floor level over a 4" floor sink by the chillers, install a 1/2" r.p. in the basement over one of the sumps for the humidifiers. the sump pumps will have a gate or ball valve and check valve at the pumps. the chiller drain will not be directly connected to the sanitary sewer. floor sinks are to be trapped and vented.
|
Plan resubmittals received | | | 1/2/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheet S2.2 to include structural calculations. routed to Dan Stuart.
|
Routing - PUBLIC WORKS | 12/24/2001 | | 12/26/2001 | | PASS |
|
|
|
|
First Notice | 12/20/2001 | 12/20/2001 | 12/20/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2001 | | DONE |
|
|
|
|
Application received | | | 12/20/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/28/2002 | | 1/31/2001 | | PASS |
|
|
|
APPROVED AS NOTED AND ATTACHED PLAN REVIEW COMMENTS ALL PART OF THE APPROVED PLANS.
|