Permit Information
Permit NumberBLD01-03261
StatusFinaled
Name J R SIMPLOT SELF DECLARATION
Site Address 5998 S QUAMASH WAY
Project NameWILLOW TREE DENTAL
Customer Number 
ePlanReviewNo
Description
Willow Tree Dental * To construct a one story Type VN wood frame 6500 sq.ft. dental clinic with engineered truss roof and crawl space. PC#943-01 CUP01-00154. 4/25/02-SITE PLAN MODIFICATION submitted and approved for the curb, gutter and paving for this specific project. Based on this approval the balance of the subdivision site development does not have to be complete in order to occupy this structure. (S. Jones/B.Murphy/B. Alexander)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/20037/14/20037/14/2003 DONE
PubWorks Occupancy Approval12/10/200212/10/200212/10/2002 DONE
Drainage project complete, signed permanent occupancy 12/10/02. D.Erskine & R.Cummings
Permanent occupancy  8/16/2002 DONE
Perm. Occ. Cert. #9301 issued 8-16-02 to Willow Tree Dental.
Code Occupancy Approval8/15/20028/15/20028/15/2002PPASS
DetailsWm. Michael Meloy
Permanent Occupancy 8/15/20028/15/2002 DONE
Details
BLD-Final7/25/20027/25/20027/25/2002PPASS
DetailsSteven Webb
BRIAN ###-####
Fee Review-notes12/26/200112/26/20017/12/2002 DONE
Temporary occupancy  7/8/2002 DONE
temp occ #4838 issued 7/8/02 to Willow Tree Dental aml Pending plumbing, public works, structural, and zoning.
FIRE-Final Inspection7/1/20027/2/20027/2/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/01/2002 at 16:00:52. Contact: ###-####.
BLD-Final7/1/20027/2/20027/2/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/01/2002 at 16:01:35. Contact: ###-####.ok for temp occ needs other trades to sign off perm and install floor molding in bath rooms and fix thresholds at doors over 1/2 inch 7/2/2002 12:38:58 PM
BLD-Final7/1/20027/2/20027/2/2002PCANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/01/2002 at 16:01:35. Contact: ###-####.
FIRE-Final Inspection6/27/20026/28/20026/28/2002PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/27/2002 at 11:01:37. Contact: ###-####. door hardware at two exits; need passage set for hallway door; gas labeling; resubmittal wasn't on site for curb change at entrance 6/28/2002 3:29:02 PM
BLD-Other6/25/20026/26/20026/26/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 06/25/2002 at 13:49:08. Contact: ###-####.
BLD-Other6/26/20026/26/20026/26/2002PPASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 6/26/2002 1:12:31 PM Remaining grid ceiling on south side--ses. pod in place. 6/26/2002 4:45:08 PM
BLD-Other6/24/20026/25/20026/25/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/24/2002 at 11:00:55. Contact: ###-####. large treatment room at south side needs seismic pods, over 144 square foot contractor notified will call back before tile ,All other areas ok . 6/25/2002 10:49:42 AM
FIRE-Conference5/13/20025/13/20025/13/2002APART
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/13/2002 10:22:18 AM left resubmittal with GC concerning curb cut at entrance off Quamash Way; FD access required here 5/13/2002 10:24:18 AM
BLD-Framing/Rough-in5/6/20025/7/20025/7/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/06/2002 at 13:47:17. Contact: ###-####. Mechanical r.i to be performed after hard lid is installed--ok to cover. 5/7/2002 8:56:02 AM
BLD-Framing/Rough-in5/3/20025/3/20025/3/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/03/2002 at 11:25:19. Contact: ###-####. lat supports in trusses and plumbing r/i ok to insulate after plumbing r/i 5/3/2002 1:56:01 PM
Plan Reviewer's activity  5/3/2002 DONE
DetailsBill Alexander
Recieved second set (plan F-1). Put plan in Rick Jacksons mail box to take to site.
Telephone call  5/2/2002 DONE
Called Larry Knopp Architects (8:00 am) and asked for one more C-3 plan for attachements, which was modified to allow F.D. turn radius access, for exit or entrance from the west, facilities south east corner turn north or from north turn west (was restricted).
Plan Reviewer's activity  5/1/2002 DONE
Received revised plan (1) with acceptable turn radius requirement (reference review). Need one more for attachements.
BLD-Energy code compliance4/29/20024/30/20024/30/2002ANR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/29/2002 at 12:53:47. Contact: ###-####.
BLD-Framing/Rough-in4/29/20024/30/20024/30/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/29/2002 at 14:54:53. Contact: ###-####. SHEAR--c/n posted--excessive nail penetration on north and northeast sides of building--hd on south mislocated-provide eng or retrofit by framing. 4/30/2002 8:36:54 AM
BLD-Framing/Rough-in4/30/20024/30/20024/30/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/30/2002 at 10:18:52. Contact: ###-####. Shear--ok to cover exterior. 4/30/2002 4:13:13 PM
Plan Reviewer's activity  4/25/2002 DONE
PARKING LOT CHANGES plan was approved and given to contractor. This allows curb, gutter and paving for this specific building so it can obtain a certificate of occupancy without having to have the entire subdivision paving installed. No additional fees paid.
Print Occupancy Form  4/25/2002 DONE
Routing - FIRE4/19/20024/19/20024/19/2002 PASS
DetailsBill Alexander
Routing - FIRE4/18/2002 4/19/2002 FAIL
DetailsBill Alexander
PARKING LOT CHANGES-Bill A.
5-0 curb radius on the S.E. driveway entry, of building #5, West entry and turn north will not allow fire department apperatus turn radius requirements.
Routing - PLANNING4/18/2002 4/18/2002 FAIL
PARKING LOT CHANGES * Sev Jones
Fail - application not in compliance with CUP01-00154 conditions of approval.
Routing - PUBLIC WORKS4/16/2002 4/18/2002 PASS
PARKING LOT CHANGES-Brian M.
Plan resubmittals received  4/16/2002 DONE
PARKING LOT MODIFICATION RECEIVED. Sent to PW (Brian), Planning (Sev) and Fire (Bill) then route back to Marlene.
BLD-Foundation3/20/20023/21/20023/21/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/20/2002 at 14:10:47. Contact: ###-####.
BLD-Footing3/15/20023/18/20023/18/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/15/2002 at 12:21:29. Contact: ###-####.
(F) Reprint permit  3/12/2002  
Issue PAID IN FULL permit  3/11/2002 DONE
Routing - PLANNING Land Div3/4/2002 3/8/2002 PASS
Land division ok. Returned to Plan Review. (blc)
PLANS/APPL TAKEN TO FRONT DESK  3/8/2002 DONE
Inspection Record Card- Bld  3/8/2002 DONE
Print Occupancy Form  3/8/2002 DONE
Telephone call  3/8/2002 DONE
SPOKE WITH LARRY PERMIT READY
Plan assigned to (MLO)1/2/2002 3/8/2002 PASS
DetailsMike Otto
3/8/2002 13:22:16 MLO - activity updated through activity BLDA022 from case BLD01-03261.
Additional plans submitted  3/4/2002 DONE
Received one copy of Plat showing Havenwood Subdivision. Put with plans and re-routed to Planning land development. kmm
Routing - PLAN CHECK2/26/2002 2/26/2002 PASS
Routing - FIRE2/20/2002 2/25/2002 PASS
Plan resubmittals requested  2/20/2002 FAIL
DRAFTSTOPS
Routing - PLANNING Land Div2/13/2002 2/19/2002 FAIL
Subdivision still not recorded. Can not sign off for land division. Returned to Plan Review. (blc)
Routing - PUBLIC WORKS2/6/2002 2/13/2002 PASS
route back to PW when initial review complete MLO 1/27/2002
Routing - PLUMBING1/31/2002 2/6/2002 PASS
max. length of 11/2" horizontal vent piping is 20'. min. 3" waste to toilet in room 120. note 5 page P-2 and note 16 page A3- increase pipe sizing to sprinkler head in nitrous closet to allow for min. 14.82 gpm. dcva required for sprinkler head in nitrous closet. additional cross connection protection may be required.
Plan resubmittals received  2/5/2002 DONE
Received two sets of resubmittal sheet A3 with cover letter. Routed to Mike Otto.
Plan resubmittals received  2/5/2002 DONE
Received two copies of revised sheets A1, A3, P-1, P-2, P-3, one copy of response letter. Routed to Mike O. kmm
Routing - FIRE1/30/20021/31/20021/31/2002 FAIL
DetailsBill Alexander
Need verification of Hazadous Material Quantities for gas "Oxidizer" and "Other Health Hazards". Need water supply verifcation on correct addressing/Hydrant. Sprinkler desing for gas room notes is incorrect. Need to verify gas room door "type".
Plan Review Completed(1st rev)  1/31/2002 DONE
Routing - PLAN CHECK1/25/2002 1/30/2002 FAIL
corrections faxed and mailed to architect
Plan resubmittals requested  1/30/2002 FAIL
UBC corrections
Routing - PLUMBING1/15/2002 1/24/2002 FAIL
Routing - PUBLIC WORKS1/4/2002 1/14/2002 FAIL
Subdivision not recorded.
Requires drainage plan and geotect report fill material per Brian Murphy.
Routing - PLANNING1/14/2002 1/14/2002 PASS
Additional plans submitted  1/11/2002 DONE
Received two sets of Sheet MG1 and MG2 to be attached to already submitted plans. routed to Mike Otto.
Routing - PLANNING Land Div12/27/2001 1/4/2002 FAIL
This is currently being re-subdivided as Havenwood, but plat not yet recorded. Site plan does not reflect current lot of record. Routed t oPublic Works. (blc)
Plan resubmittals received  1/4/2002 DONE
Received two copies of revised sheets E-1, E-2, E-3. Put with plans. kmm
Pending Assignment by JCM12/27/2001 1/2/2002 DONE
DetailsJohn Menard
1/2/2002 08:28:29 JCM - activity updated through activity BLDA174 from case BLD01-03261.
Plan routing begun/NEW & ADDTN  12/27/2001 DONE
Plans ACCEPTED BY PLAN TECH  12/27/2001 PEND
no extra civil submitted with plans
Application received  12/26/2001  
Recd Pcfee & Taken To Pln CK  12/26/2001  
Routing - PLAN CHECK2/19/2002 2/20/2001 FAIL
ARCHITECT CONTACTED BY PHONE REGARDING DRAFTSTOPS
Routing - PLAN CHECK4/19/2002    
PARKING LOT CHANGES-route to Marlene.