BLD-Final | 6/7/2002 | 6/10/2002 | 6/10/2002 | A | PASS |
Tony Young
|
|
|
fn -bobbi- ###-####
|
DOC - Permit Finaled | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 6/10/2002 11:43:28 AM
|
BLD-Final | 6/6/2002 | 7/7/2002 | 6/7/2002 | P | CANC |
Tony Young
|
|
|
bobbi ###-####--cancel wrong date???
|
BLD-Grading Inspection | 6/7/2002 | 6/7/2002 | 6/7/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Framing/Rough-in | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Tony Young
|
|
|
KIM ###-####
|
BLD-Framing/Rough-in | 3/25/2002 | 3/27/2002 | 3/27/2002 | A | PART |
Tony Young
|
|
|
###-####
went through truss specs, added c/n, ok to insulate. 3/27/2002 11:14:05 AM
|
BLD-Framing/Rough-in | 3/25/2002 | 3/26/2002 | 3/26/2002 | P | PART |
Tony Young
|
|
|
###-#### BOBBI
c/n posted,, ok to insulate 3/26/2002 2:23:30 PM
|
BLD-Framing/Rough-in | 3/12/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Tom Arcoraci
|
|
|
SHEER ###-#### RICK ok for ext cover 3/13/2002 1:49:46 PM
|
BLD-Framing/Rough-in | 3/11/2002 | 3/12/2002 | 3/12/2002 | P | NR |
Russ Owen
|
|
|
shear---kim ###-#### Will recall .talked with contractor. 3/12/2002 3:26:59 PM
|
BLD-Framing/Rough-in | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 13:24:55. Contact: . C/n posted. to many items to list. 3/11/2002 12:54:18 PM
|
BLD-Foundation | 1/23/2002 | 1/24/2002 | 1/24/2002 | P | PART |
Tony Young
|
|
|
###-#### MIKE
|
BLD-Footing | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PART |
Tony Young
|
|
|
###-####
recvd letter from soil engineer oking sub grade and compaction 1/23/2002 3:37:08 PM
|
Inspection Record Card- Bld | | | 1/16/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/16/2002 | | DONE |
|
|
|
left message of fees
|
Issue PAID IN FULL permit | | | 1/16/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/4/2002 | | 1/15/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/9/2002 | | 1/15/2002 | | PASS |
Steve Munroe
|
|
|
1/15/2002 14:01:30 SAM - activity updated through activity BLDA022 from case BLD01-03269.
|
Plan Reviewer's activity | | | 1/14/2002 | | PEND |
|
|
|
1/14/02 15:05 I called and left a message for Lee Harison to call me regarding beam sizes and footings. I then called to talk to Bobbi to let her know what is happening on the plans and to get a attic truss profile.
|
Case Summary (BLD) | | | 1/14/2002 | | |
|
|
|
|
Plan Review Report | | | 1/14/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 1/11/2002 | | PEND |
|
|
|
1/11/02 10:45 I talked with the engineer (ET), Lee Harrison. He will get with the designer and show him the corrections then he will fax me the revised calculations and a memo.
|
Plan Reviewer's activity | | | 1/10/2002 | | PEND |
|
|
|
1/10/02 11:30 I called and left a message for Bobbi Dewitt to call me. I let her know that I'm finding problems on the plans. (Sections, details, bearing, foundation, shear, natural light, engineering calcs for foundation, beam calcs) She and her husband are coming down here to meet with me at 13:30.
|
Plan Reviewer's activity | | | 1/10/2002 | | PEND |
|
|
|
1/10/02 15:35 I talked to the engineer. He will call me in the morning after he gets a set of plans to look at. I informed the builder after talking to the engineer what was going on.
|
Pending Assignment by DJO | 12/27/2001 | | 1/9/2002 | | DONE |
Dan Overy
|
|
|
1/9/2002 15:12:07 SAM - activity updated through activity BLDA183 from case BLD01-03269.
|
Routing - PLANNING | 1/2/2002 | | 1/3/2002 | | PASS |
|
|
|
|
Routing - FIRE | 1/3/2002 | | 1/3/2002 | | DONE |
|
|
|
No fire sprinklers required.
|
Routing - PUBLIC WORKS | 12/31/2001 | | 1/2/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/27/2001 | | 12/31/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as category 3 with conditions of approval in letter attached to the plans.
|
Application received | | | 12/27/2001 | | |
|
|
|
|