BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm occ 3/1/2002 11:08:51 AM
|
Permanent Occupancy | | 3/1/2002 | 3/1/2002 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/1/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9054 issued 3-1-02 to Therapeutic Associates, Inc. in Parkcenter Mall.
|
BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | P | CANC |
Tom Arcoraci
|
|
|
###-#### NATHAN
|
BLD-Final | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PART |
Jim Storey
|
|
|
fn occ ###-####--nathan need tactal signage at bathroon/ lever hardware on all dors/ ok for temp upon ele sign off. 2/22/2002 11:16:30 AM
|
FIRE-Final Inspection | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PASS |
Rick Jackson
|
|
|
nathan- ###-#### fire fn
|
FIRE-Supply Line Hydro | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | CANC |
Rick Jackson
|
|
|
###-#### NATHAN wrong type of inspection 2/15/2002 3:45:20 PM
|
FIRE-Final Inspection | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | FAIL |
Rick Jackson
|
|
|
###-#### NATHAN sprinklers obstructed in bathroon; too close to TX rooms 1 and 2; outside sidewall sprinkler deflector damaged/bent 2/15/2002 3:46:21 PM
|
BLD-Framing/Rough-in | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | PART |
Jim Storey
|
|
|
###-#### ron framing ok pending ele insp. sch. for today. 1/24/2002 11:57:26 AM
|
Fee Review-notes | 12/28/2001 | 12/28/2001 | 1/24/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/23/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/17/2002 | | 1/22/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2002 | | PASS |
|
|
|
|
Print Occupancy Form | | | 1/22/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/22/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/22/2002 | | DONE |
|
|
|
permit ready
|
Plan assigned to (CJW) | 12/28/2001 | | 1/22/2002 | | PASS |
Carl Westfall
|
|
|
1/22/2002 14:31:41 CJW - activity updated through activity BLDA022 from case BLD01-03274.
|
Routing - FIRE | 1/14/2002 | | 1/17/2002 | | DONE |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/17/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/3/2002 | | 1/14/2002 | | PASS |
|
|
|
UBC plan review started January 11, 2002 and finished January 14, 2002. The drawings were approved with conditions. See the conditions list.
|
Routing - PLUMBING | 1/2/2002 | | 1/3/2002 | | PASS |
|
|
|
water system piping shall conform to upc 610, upc 409- toilet shall be elongated bowl with open front seat.
|
Routing - PUBLIC WORKS | 12/28/2001 | | 1/2/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/28/2001 | | DONE |
|
|
|
1. No building code data on plans.
2. Plans not fully dimensioned.
3. John Cook and Parkcenter Mall needs to be called when the permit for the building and demo are ready.
|
Application received | | | 12/28/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/28/2001 | | DONE |
|
|
|
|