Permit Information
Permit NumberBLD01-03285
StatusFinaled
Name TAHOE CONSTRUCTION
Site Address 3912 S MILL SITE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two and half bathroom 1780 sq. ft. two story, single family dwelling (905 sq. ft. first floor/875 sq. ft. second floor) with a attached 542 sq. ft. two car garage and 130 sq. ft. of covered porch. Per approved plans, engineering and requirement list. CUP98-0116 per Roger Jones with Planning and Zoning. PC#851 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20025/6/20025/6/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/06/2002 at 11:28:03. Contact: ###-####.c.c # 23089 issued 5/6/2002 2:22:32 PM
DOC - Permit Finaled5/6/20025/6/20025/6/2002PPASS
DetailsDave Hannah
Finaled by inspector at 5/6/2002 2:22:36 PM
BLD-Energy code compliance3/7/20023/8/20023/8/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/07/2002 at 08:29:22. Contact: ###-####. Insulation not completed. 3/8/2002 9:12:21 AM
BLD-Energy code compliance3/8/20023/8/20023/8/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/08/2002 at 09:30:09. Contact: ###-####.
BLD-Framing/Rough-in3/5/20023/6/20023/6/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/05/2002 at 16:02:50. Contact: ###-####. c/notice items done 3/6/2002 11:10:26 AM
BLD-Framing/Rough-in3/5/20023/5/20023/5/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/05/2002 at 10:19:56. Contact: ###-####. c/n posted--ok to insulate. 3/5/2002 2:30:43 PM
BLD-Other2/20/20022/22/20022/22/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/20/2002 at 14:29:39. Contact: ###-####. Shear OK. 2/22/2002 10:00:59 AM
BLD-Foundation2/1/20022/1/20022/1/2002PPART
DetailsSteven Webb
###-#### CLINT 95% ready--hd not installed at time of inspection. 2/1/2002 2:32:03 PM
BLD-Footing1/30/20021/30/20021/30/2002PPART
DetailsSteven Webb
CLINT ###-#### wip--informed contractor that due to cold temps. blankets needed at least 72 hours. 1/30/2002 2:36:35 PM
Issue PAID IN FULL permit  1/25/2002 DONE
Print Pending Permit.LaserJet4  1/24/2002  
Plan Review Report  1/24/2002  
PLANS/APPL TAKEN TO FRONT DESK  1/24/2002 DONE
Inspection Record Card- Bld  1/24/2002 DONE
CHANGE STATUS TO (PND)  1/15/2002 PEND
Builder is planning on puting this house on a different lot. (Lots 8 & 9 Block 15 Harris Ranch #1)
Routing - PLAN CHECK1/3/2002 1/8/2002 DONE
Plan assigned to (SAM)1/7/2002 1/8/2002 PASS
DetailsSteve Munroe
1/8/2002 11:22:23 SAM - activity updated through activity BLDA022 from case BLD01-03285.
Plan Review Report  1/8/2002  
Plan Reviewer's activity  1/8/2002 PEND
1/8/02 10:45 I called the builder and left a message for him to call me. Jake called me back. He will call and talk to the truss company about the hip girders then get back with me. Plans on hold till then
PLANS/APPL TAKEN TO FRONT DESK  1/8/2002 DONE
Inspection Record Card- Bld  1/8/2002 DONE
Telephone call  1/8/2002 DONE
left mess that permit ready
Pending Assignment by DJO12/31/2001 1/7/2002 DONE
DetailsDan Overy
1/7/2002 14:00:42 SAM - activity updated through activity BLDA183 from case BLD01-03285.
Routing - PUBLIC WORKS1/2/2002 1/3/2002 PASS
Routing - PLANNING12/31/2001 1/2/2002 PASS
new lot same house
Application received  12/31/2001