DOC - Permit Finaled | | | 2/25/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | | DONE |
Russ Owen
|
|
|
|
First Notice | | 6/16/2003 | 6/16/2003 | | DONE |
|
|
|
|
BLD-Final | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### Finish firecaulk and hinges. 9/20/2002 8:46:45 AM
|
BLD-Final | 9/20/2002 | 9/20/2002 | 9/20/2002 | P | PASS |
Jim Sly
|
|
|
###-#### OK for Perm Occ. 9/20/2002 1:53:38 PM
|
Letter of compliance | | | 9/20/2002 | | DONE |
|
|
|
Letter of Compliance #22593 issued 9-20-02.
|
Temporary occupancy | | | 9/13/2002 | | DONE |
|
|
|
Temp. Occ. cert. #4865 issued 9-13-02 to Callies Bldg. #1 shell and core.
|
BLD-Final | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 21:12:05. Contact: ###-####.ok temp oc , c/n posted on site 9/12/2002 1:06:47 PM
|
BLD-Framing/Rough-in | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | CANC |
Russ Owen
|
|
|
###-####. Wrong insp, called in. 9/11/2002 11:49:09 AM
|
BLD-Final | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | FAIL |
Russ Owen
|
|
|
###-####c/n posted. 9/11/2002 11:49:26 AM
|
FIRE-Final Inspection | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 9/6/2002 1:14:18 PM
|
BLD-Final | 9/5/2002 | 9/6/2002 | 9/6/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 18:15:09. Contact: ###-####.c/n posted. 9/6/2002 2:57:52 PM
|
FIRE-Final Inspection | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | FAIL |
Troy Cobbley
|
|
|
no approved plans on site so I did not start inspection. I noticed that exit door hardware is incorrect on both doors and atleast one of the exit signs did not work 9/5/2002 2:35:04 PM 9/5/2002 2:38:12 PM
|
Code Occupancy Approval | 9/5/2002 | 9/5/2002 | 9/5/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Approved 9/5/2002 12:31:45 PM
|
Print Occupancy Form | | | 8/29/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/13/2002 | 8/14/2002 | 8/14/2002 | A | PART |
Dave Hannah
|
|
|
###-#### SCOTT ceiling grid ok to drop in panels 8/14/2002 10:12:56 AM
|
BLD-Framing/Rough-in | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | PASS |
Russ Owen
|
|
|
re-insp russ- ###-####
|
BLD-Framing/Rough-in | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | FAIL |
Russ Owen
|
|
|
###-####posted a c/n. 7/12/2002 5:03:59 PM
|
BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | NR |
Russ Owen
|
|
|
###-####needs electrical and plumbing. 7/8/2002 5:22:44 PM
|
BLD-Framing/Rough-in | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | PART |
Russ Owen
|
|
|
###-#### erin
|
BLD-Framing/Rough-in | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | PART |
Russ Owen
|
|
|
###-####. ok to side, needs eaves at left and right sides sheetrocked as per plan. 6/21/2002 4:03:45 PM
|
(F) Reprint permit | | | 6/20/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### scott,staple lower walls and nail blocking thru deck no c/n posted. 6/13/2002 4:40:36 PM
|
BLD-Foundation | 4/4/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 17:06:30. Contact: .
|
BLD-Footing | 3/29/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 10:24:05. Contact: ###-####.
|
(F) Reprint permit | | | 3/28/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/27/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/4/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/4/2002 | | 3/4/2002 | | PASS |
Mike Phillips
|
|
|
3/4/2002 08:34:21 M_P - activity updated through activity BLDA022 from case BLD02-00018.
|
Routing - PLAN CHECK | 2/13/2002 | | 3/4/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/1/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets S-1 of 3, S-3 of 3. Routed to Mike Phillips.
|
Routing - PLANNING | 2/13/2002 | | 2/13/2002 | | PASS |
|
|
|
Approve per DRH00-242
|
Routing - PLAN CHECK | 1/31/2002 | | 2/12/2002 | | FAIL |
|
|
|
Waiting for soil report using 2,000 p.s.f.
|
Plan resubmittals received | | | 2/8/2002 | | DONE |
|
|
|
Received two copeis of revised sheet E-2. Routed to Mike P. kmm
|
Plan resubmittals received | | | 2/7/2002 | | DONE |
|
|
|
received two copies of revised sheetsA-1, A-2, A-3, A-4, A-5, A-6, S-1, S-2, M-1, M-2, one copy of response letter. Routed to Mike P. kmm
|
Routing - FIRE | 1/29/2002 | 1/31/2002 | 1/31/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 1/31/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/22/2002 | | 1/29/2002 | | FAIL |
|
|
|
Plan review completed sent correction report requesting additional information be submitted for further review.
|
Print Pending Permit.LaserJet4 | | | 1/29/2002 | | |
|
|
|
|
Routing - PLUMBING | 1/15/2002 | | 1/22/2002 | | PASS |
|
|
|
provide premise protection and thermol expantion protection on main water supply prior to any branch lines.
|
Routing - PLANNING | 1/10/2002 | | 1/15/2002 | | FAIL |
|
|
|
Applicant needs to submit detailed landscape plan and copy of floor plans and elevations prior to building sign-off per DR conditions of DRH00-242. Informed applicant's office on 1/11/02.
|
Routing - PUBLIC WORKS | 1/4/2002 | | 1/10/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/4/2002 | | 1/4/2002 | | PASS |
|
|
|
Land division ok. Routed to Public Works. (blc)
|
Application received | | | 1/3/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/3/2002 | | |
|
|
|
|