DOC - Permit Finaled | | | 2/25/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/15/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 6/11/2003 | | |
|
|
|
|
BLD-Final | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PART |
Russ Owen
|
|
|
###-####. Ok temp oc pending zoning for a perm oc. 12/5/2002 3:51:31 PM
|
BLD-Final | 11/26/2002 | 11/27/2002 | 11/27/2002 | P | NR |
Russ Owen
|
|
|
###-####. Needs public works approval prior to a final inspection./27/2002 4:06:30 PM 11/27/2002 4:12:14 PM 11/27/2002 4:12:24 PM
|
FIRE-Final Inspection | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled. The contractor still needs to install the permanent lock set on the main exit/entry structural inspector to please verify 11/27/2002 11:13:54 AM
|
Letter of compliance | | | 11/27/2002 | | DONE |
|
|
|
Letter of Complaince #22780 issued 11-27-02.
|
Code Occupancy Approval | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | PASS |
Scott M.Brown
|
|
|
landscape in as required, ok for occupancy 11/26/2002 3:07:56 PM
|
Inspection Record Card- Bld | | | 11/26/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/26/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/22/2002 | 11/25/2002 | 11/25/2002 | P | PASS |
Steven Webb
|
|
|
###-#### ceiling inspection Sus. ceiling 11/25/2002 5:04:17 PM
|
Case Summary (BLD) | | | 11/22/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 | A | PASS |
Russ Owen
|
|
|
###-#### scott
|
Routing - PLAN CHECK | 9/6/2002 | | 9/6/2002 | | PASS |
|
|
|
Plan Modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/6/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/6/2002 | | DONE |
|
|
|
MESSAGE PLAN MOD READY AND FEES DUE
|
Plan assigned to (M_P) | 8/22/2002 | | 9/6/2002 | | PASS |
Mike Phillips
|
|
|
9/6/2002 14:44:59 M_P - activity updated through activity BLDA022 from case BLD02-00019.
|
Routing - FIRE | 9/3/2002 | | 9/6/2002 | | PASS |
Bill Alexander
|
|
|
Plan modification
|
Routing - PLAN CHECK | 8/28/2002 | | 9/3/2002 | | PEND |
|
|
|
Plan modification
9/3/02 Waiting for others to approve prior to issuing permit modification. MJP
|
Routing - PLANNING | 8/26/2002 | | 8/28/2002 | | PASS |
|
|
|
Plan Modification * Approve per DRH00-242.
|
Routing - PUBLIC WORKS | 8/26/2002 | | 8/26/2002 | | PASS |
|
|
|
Plan Modification. No changes
|
Plan routing begun/NEW & ADDTN | | | 8/26/2002 | | DONE |
|
|
|
Plan Modification - Waiting for original plans from records. Will start routing when I receive them. kmm
8/26/02 Received approved original plans.
|
CHANGE STATUS TO (PND) | | | 8/22/2002 | | DONE |
|
|
|
PLAN MODIFICATION RECEIVED
|
Plan Modification Accepted | | | 8/22/2002 | | DONE |
|
|
|
Plan Modification * The interior layout was adjusted to better accomidate the owners needs. (The lay out on building #1 she liked better) The stairs were turned the opposite direction. The exterior windows were made 1' taller around the entire building and were moved around to center offices.
|
BLD-Framing/Rough-in | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | PART |
Russ Owen
|
|
|
###-####ok pending floor plan modification. 8/7/2002 1:04:21 PM
|
BLD-Framing/Rough-in | 8/2/2002 | 8/6/2002 | 8/6/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### complete prior c/n. 8/6/2002 3:12:30 PM
|
BLD-Framing/Rough-in | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PART |
Russ Owen
|
|
|
nail truss repair 7/31/2002 3:16:22 PMper detail, fire caulk at stairs,a red hed a-b.s 7/31/2002 3:17:14 PM
|
CHANGE STATUS TO (ISS) | | | 7/31/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### SCOTTc/n 7/30/2002 10:42:13 AM
|
BLD-Framing/Rough-in | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | PART |
Russ Owen
|
|
|
shear ok. 7/23/2002 11:09:03 AM
|
BLD-Framing/Rough-in | 7/19/2002 | 7/22/2002 | 7/22/2002 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/19/2002 at 11:26:50. Contact: .
|
BLD-Framing/Rough-in | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | NR |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | NR |
Russ Owen
|
|
|
SCOTT- ###-#### FR . needs all other finals, called 5/31/2002 12:06:32 PM lefty message. 5/31/2002 12:06:40 PM
|
BLD-Foundation | 4/17/2002 | 4/18/2002 | 4/18/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 16:02:46. Contact: ###-####.
|
BLD-Footing | 3/29/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 10:25:25. Contact: ###-####.
|
(F) Reprint permit | | | 3/28/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/27/2002 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 3/27/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/4/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/4/2002 | | 3/4/2002 | | PASS |
Mike Phillips
|
|
|
3/4/2002 09:11:07 M_P - activity updated through activity BLDA022 from case BLD02-00019.
|
Routing - PLAN CHECK | 2/13/2002 | | 3/4/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/1/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets S-1 of 4 and S-3 of 4. Routed to Mike Phillips.
|
Routing - PLANNING | 2/13/2002 | | 2/13/2002 | | PASS |
|
|
|
Approve per DRH00-242
|
Routing - PLAN CHECK | 1/24/2002 | | 2/12/2002 | | FAIL |
|
|
|
Waiting for soil report using 2,000 p.s.f.
|
Plan resubmittals received | | | 2/7/2002 | | DONE |
|
|
|
Received two copies of revised sheets C-1, A-1, A-2, A-5, one copy of response letter. Routed to Mike P. kmm
|
Routing - FIRE | 1/23/2002 | 1/23/2002 | 1/23/2002 | | PASS |
Bill Alexander
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/23/2002 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/23/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/15/2002 | | 1/23/2002 | | FAIL |
|
|
|
Plan review completed. Additional information required for further review prior to issuing permit.
|
Routing - PLANNING | 1/11/2002 | | 1/15/2002 | | FAIL |
|
|
|
Applicant needs to submit detailed landscape plan and copy of floor plans and elevations prior to building sign-off per DR conditions of DRH00-242. Informed applicant's office on 1/11/02.
|
Routing - PLUMBING | 1/15/2002 | | 1/15/2002 | | PASS |
|
|
|
premise and thermol expantion protection will be required, provide a drain pan for the water heater. fax to arch wouldnt go thru
|
Routing - PUBLIC WORKS | 1/4/2002 | | 1/11/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/4/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/4/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 1/4/2002 | | 1/4/2002 | | PASS |
|
|
|
Land division ok. Routed to Public Works. (blc)
|
Application received | | | 1/3/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/3/2002 | | DONE |
|
|
|
|