Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00019
StatusFinaled
Name CALLIES BUILDING #2
Site Address 1556 S TIMESQUARE LN
Project NameCALLIES BLDG #2
Customer Number 
ePlanReviewNo
Description
Boise Timesquare * (CALLIES BUILDING #2 SHELL AND CORE) - (Plan Modification * Relocate the interior nonload bearing walls for the future tenant spaces, change stairway run and move restrooms per approved plans dated 9/3/02). To construct a new 2,822 sq. ft. wood framed, multi-tenant, office building with a 500 sq.ft. basement mechanical room. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. This permit includes on site improvements and landscaping. The basement will not to be used for storage or any other purpose other than mechanical equipment. NOTE: There will not be a certificate of occupancy issued with this permit. A Separate MIS permits will be required for each tenant space. MJP DRH00-00242 PC#010-02
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  2/25/2004 DONE
Case Summary (BLD)  9/15/2003  
Case Summary (BLD)  6/11/2003  
BLD-Final12/4/200212/5/200212/5/2002APART
DetailsRuss Owen
###-####. Ok temp oc pending zoning for a perm oc. 12/5/2002 3:51:31 PM
BLD-Final11/26/200211/27/200211/27/2002PNR
DetailsRuss Owen
###-####. Needs public works approval prior to a final inspection./27/2002 4:06:30 PM 11/27/2002 4:12:14 PM 11/27/2002 4:12:24 PM
FIRE-Final Inspection11/26/200211/27/200211/27/2002APASS
DetailsTroy Cobbley
life safety finaled. The contractor still needs to install the permanent lock set on the main exit/entry structural inspector to please verify 11/27/2002 11:13:54 AM
Letter of compliance  11/27/2002 DONE
Letter of Complaince #22780 issued 11-27-02.
Code Occupancy Approval11/26/200211/26/200211/26/2002PPASS
DetailsScott M.Brown
landscape in as required, ok for occupancy 11/26/2002 3:07:56 PM
Inspection Record Card- Bld  11/26/2002 DONE
Print Occupancy Form  11/26/2002 DONE
BLD-Framing/Rough-in11/22/200211/25/200211/25/2002PPASS
DetailsSteven Webb
###-#### ceiling inspection Sus. ceiling 11/25/2002 5:04:17 PM
Case Summary (BLD)  11/22/2002 DONE
BLD-Framing/Rough-in9/9/20029/10/20029/10/2002APASS
DetailsRuss Owen
###-#### scott
Routing - PLAN CHECK9/6/2002 9/6/2002 PASS
Plan Modification
PLANS/APPL TAKEN TO FRONT DESK  9/6/2002 DONE
Print Pending Permit.LaserJet4  9/6/2002 DONE
Telephone call  9/6/2002 DONE
MESSAGE PLAN MOD READY AND FEES DUE
Plan assigned to (M_P)8/22/2002 9/6/2002 PASS
DetailsMike Phillips
9/6/2002 14:44:59 M_P - activity updated through activity BLDA022 from case BLD02-00019.
Routing - FIRE9/3/2002 9/6/2002 PASS
DetailsBill Alexander
Plan modification
Routing - PLAN CHECK8/28/2002 9/3/2002 PEND
Plan modification
9/3/02 Waiting for others to approve prior to issuing permit modification. MJP
Routing - PLANNING8/26/2002 8/28/2002 PASS
Plan Modification * Approve per DRH00-242.
Routing - PUBLIC WORKS8/26/2002 8/26/2002 PASS
Plan Modification. No changes
Plan routing begun/NEW & ADDTN  8/26/2002 DONE
Plan Modification - Waiting for original plans from records. Will start routing when I receive them. kmm
8/26/02 Received approved original plans.
CHANGE STATUS TO (PND)  8/22/2002 DONE
PLAN MODIFICATION RECEIVED
Plan Modification Accepted  8/22/2002 DONE
Plan Modification * The interior layout was adjusted to better accomidate the owners needs. (The lay out on building #1 she liked better) The stairs were turned the opposite direction. The exterior windows were made 1' taller around the entire building and were moved around to center offices.
BLD-Framing/Rough-in8/7/20028/7/20028/7/2002PPART
DetailsRuss Owen
###-####ok pending floor plan modification. 8/7/2002 1:04:21 PM
BLD-Framing/Rough-in8/2/20028/6/20028/6/2002AFAIL
DetailsRuss Owen
###-#### complete prior c/n. 8/6/2002 3:12:30 PM
BLD-Framing/Rough-in7/31/20027/31/20027/31/2002PPART
DetailsRuss Owen
nail truss repair 7/31/2002 3:16:22 PMper detail, fire caulk at stairs,a red hed a-b.s 7/31/2002 3:17:14 PM
CHANGE STATUS TO (ISS)  7/31/2002 DONE
BLD-Framing/Rough-in7/29/20027/30/20027/30/2002AFAIL
DetailsRuss Owen
###-#### SCOTTc/n 7/30/2002 10:42:13 AM
BLD-Framing/Rough-in7/22/20027/23/20027/23/2002APART
DetailsRuss Owen
shear ok. 7/23/2002 11:09:03 AM
BLD-Framing/Rough-in7/19/20027/22/20027/22/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/19/2002 at 11:26:50. Contact: .
BLD-Framing/Rough-in7/22/20027/22/20027/22/2002PNR
DetailsRuss Owen
BLD-Framing/Rough-in5/30/20025/31/20025/31/2002ANR
DetailsRuss Owen
SCOTT- ###-#### FR . needs all other finals, called 5/31/2002 12:06:32 PM lefty message. 5/31/2002 12:06:40 PM
BLD-Foundation4/17/20024/18/20024/18/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/17/2002 at 16:02:46. Contact: ###-####.
BLD-Footing3/29/20024/1/20024/1/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/29/2002 at 10:25:25. Contact: ###-####.
(F) Reprint permit  3/28/2002  
Issue PAID IN FULL permit  3/27/2002 DONE
CHANGE ISSUED DATE  3/27/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/4/2002 DONE
Print Pending Permit.LaserJet4  3/4/2002 DONE
Inspection Record Card- Bld  3/4/2002 DONE
Plan assigned to (M_P)1/4/2002 3/4/2002 PASS
DetailsMike Phillips
3/4/2002 09:11:07 M_P - activity updated through activity BLDA022 from case BLD02-00019.
Routing - PLAN CHECK2/13/2002 3/4/2002 PASS
Plan resubmittals received  3/1/2002 DONE
Received two sets of resubmittal sheets S-1 of 4 and S-3 of 4. Routed to Mike Phillips.
Routing - PLANNING2/13/2002 2/13/2002 PASS
Approve per DRH00-242
Routing - PLAN CHECK1/24/2002 2/12/2002 FAIL
Waiting for soil report using 2,000 p.s.f.
Plan resubmittals received  2/7/2002 DONE
Received two copies of revised sheets C-1, A-1, A-2, A-5, one copy of response letter. Routed to Mike P. kmm
Routing - FIRE1/23/20021/23/20021/23/2002 PASS
DetailsBill Alexander
Print Pending Permit.LaserJet4  1/23/2002  
Plan Review Completed(1st rev)  1/23/2002 DONE
Routing - PLAN CHECK1/15/2002 1/23/2002 FAIL
Plan review completed. Additional information required for further review prior to issuing permit.
Routing - PLANNING1/11/2002 1/15/2002 FAIL
Applicant needs to submit detailed landscape plan and copy of floor plans and elevations prior to building sign-off per DR conditions of DRH00-242. Informed applicant's office on 1/11/02.
Routing - PLUMBING1/15/2002 1/15/2002 PASS
premise and thermol expantion protection will be required, provide a drain pan for the water heater. fax to arch wouldnt go thru
Routing - PUBLIC WORKS1/4/2002 1/11/2002 PASS
Plans ACCEPTED BY PLAN TECH  1/4/2002 DONE
Plan routing begun/NEW & ADDTN  1/4/2002 DONE
Routing - PLANNING Land Div1/4/2002 1/4/2002 PASS
Land division ok. Routed to Public Works. (blc)
Application received  1/3/2002  
Recd Pcfee & Taken To Pln CK  1/3/2002 DONE