Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00023
StatusFinaled
Name ROSENDAHL SHOE REPAIR
Site Address 125 S CURTIS RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(ROSENDAHL SHOES) Remodel to an existing 1,683 sq.ft. building and changing occupancy from an assembly use to a retail sales and shoe repair use per approved plans on file. Work to include miscellaneous interior and exterior demolition work, structural work to provide new exterior storefront windows/door in CMU wall, extending parapet walls to 30" minimum height on North and West exterior walls, CMU wall infill in one exterior door opening, new exterior sloped walk and stairs, new handrails at stairs, upgrading restroom to meet current accessibility standards, some new interior walls, some new interior doors, interior finish, new exterior landings, exterior site work, mechanical work, plumbing work, and electrical work. A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. NOTE: This building is NOT fire sprinklered. (PC#0011-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/4/20021/4/20021/24/2003 DONE
eng. included land value on cert. of value. owner had all statesment from the subs.
Voucher Form  1/24/2003 DONE
Permanent occupancy  10/15/2002 DONE
Perm. Occ. Cert. #9401 issued 10-15-02 to Rosendahl Shoe Repair.
Permanent Occupancy 10/11/200210/11/2002 DONE
Details
BLD-Framing/Rough-in10/10/200210/11/200210/11/2002ACANC
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
BLD-Final10/11/200210/11/200210/11/2002APASS
DetailsTom Arcoraci
ok for perm
FIRE-Final Inspection10/10/200210/10/200210/10/2002PPASS
DetailsTroy Cobbley
fire life/safety finaled
FIRE-Final Inspection10/8/200210/9/200210/9/2002AFAIL
DetailsTroy Cobbley
one duct smoke detector is mounted in an enclosure but the other is not and needs to be. Contractor to provide enclosure and test detectors 10/9/2002 12:22:52 PM
BLD-Final10/8/200210/9/200210/9/2002PPART
DetailsTom Arcoraci
don; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for perm when fire signs 10/9/2002 3:49:42 PM
FIRE-Final Inspection9/23/20029/24/20029/24/2002ANR
DetailsTroy Cobbley
inspection was actually just a conference. I went over door hardware issues with the owner, fire extinguisher and possible hvac automatic shutdown 9/24/2002 10:25:15 AM
FIRE-Final Inspection9/23/20029/24/20029/24/2002ANR
DetailsTroy Cobbley
inspection was actually just a conference. I went over door hardware issues with the owner, fire extinguisher and possible hvac automatic shutdown 9/24/2002 10:25:15 AM
BLD-Final9/20/20029/23/20029/23/2002ANR
DetailsTom Arcoraci
DON; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
(F) Reprint permit  6/18/2002 DONE
BLD-Framing/Rough-in6/6/20026/7/20026/7/2002APART
DetailsTom Arcoraci
###-#### don needs plumbing permit ok after plumbing ok 6/7/2002 10:48:04 AM
Override - Parcel Holds  6/6/2002  
BLD-Framing/Rough-in5/3/20025/3/20025/3/2002PPART
DetailsTom Arcoraci
###-#### JOHN ok for grout 5/3/2002 1:25:34 PM
Override - Parcel Holds  5/3/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: BLD02-00023 Do not issue permanent Certificate of Occupancy until Density Reduction Survey and Deed have been Recorded. Contact Dave Abo or Jason Blais. (3/20/2002) Reason for OverRide:
BLD-Conference4/30/20024/30/20024/30/2002PPASS
DetailsTom Arcoraci
###-#### JOHN needs eng ok for epoxy rebar change 4/30/2002 2:44:55 PM
Override - Parcel Holds  4/30/2002  
Override - Parcel Holds  3/25/2002  
Override - Parcel Holds  3/25/2002  
Issue PAID IN FULL permit  3/25/2002 DONE
Override - Parcel Holds  3/21/2002  
Inspection Record Card- Bld  3/21/2002 DONE
Print Occupancy Form  3/21/2002 DONE
Telephone call  3/21/2002 DONE
Plan assigned to (JCB)1/10/2002 3/20/2002 PASS
DetailsJason Blais
3/20/2002 16:25:48 JCB - activity updated through activity BLDA022 from case BLD02-00023.
Routing - PLANNING3/6/2002 3/20/2002 PASS
Approved.
Routing - PLAN CHECK3/20/2002 3/20/2002 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  3/20/2002 PASS
Plan resubmittals received  3/14/2002 DONE
Received three sets of resubmittal sheets "1 OF 1" and "2 OF 2" with calculations and Certificate of Value. Routed to Jason Blais.
Plan Review Completed(1st rev)  3/6/2002 FAIL
Routing - FIRE3/1/2002 3/6/2002 PASS
approved without written comment
Plan resubmittals requested  3/1/2002  
Plan resubmittals and response required for further review.
Plan resubmittals received  2/25/2002 DONE
Received two sets of resubmittal sheets "1 of 1" and "2 of 2" with letter from owner, structural calculations, and property boundries. Routed to Jason Blais.
Meeting  1/22/2002  
Met with Jaime Morris, architect's representative, and went over items missing from plans or items not meeting code. Explained it was a Change of Occupancy and needed to be reviewed under current code. Mr. Morris acknowledged and said items would be addressed and new plans provided.
Routing - PLAN CHECK1/11/2002 1/17/2002 FAIL
Did initial review of plans and there are numerous non-compliant code issues or missing information not shown on plans. Called architect and requested a meeting to go over these issues. He acknowledged and said he would call back on January 22, 2002, to set up a meeting. Plans will be put on HOLD until sufficient plans are provided for review and routing. The project also needs Planning approval for new exterior work.
Telephone call  1/16/2002 DONE
Called architect and let him know that plans do not comply with code and are incomplete. Requested meeting to go over several non-compliant or missing items. He acknowledged and said he would call back on Tuesday, January 22nd, to set up a meeting. Plans will be on HOLD.
Routing - PLANNING1/10/2002 1/11/2002 FAIL
T.I. requires a zoning certificate for the exterior work and to document change of use. Phone Tom Ensley and informed him of this.
Plans ACCEPTED BY PLAN TECH  1/4/2002 DONE
Application received  1/4/2002  
Recd Pcfee & Taken To Pln CK  1/4/2002 DONE
Routing - PLAN CHECK1/18/2002 3/1/2001 FAIL
Plan review report sent and faxed to architect and engineer. Plan resubmittals and response required for further review. Plans to route to Fire and Planning.