BLD-Aging Inspection | 9/16/2010 | 9/16/2010 | 9/16/2010 | | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 9/16/2010 | 9/16/2010 | 9/16/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 7/21/2009 | 7/21/2009 | 7/21/2009 | | FAIL |
Tom Arcoraci
|
|
|
still needs other finals
|
BLD-Final | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | PEND |
Jim Sly
|
|
|
Called and asked again to obtain all finals.....then call for structural final
|
BLD-Aging Inspection | 1/17/2008 | 1/17/2008 | 1/17/2008 | | PEND |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 3/6/2007 | 3/6/2007 | 3/6/2007 | | PEND |
Jim Sly
|
|
|
Called respective parties....no return call.
|
BLD-Aging Inspection | 11/28/2006 | 11/28/2006 | 11/30/2006 | | DEFR |
Jim Sly
|
|
|
Pending C/N........Need all req signatures prior to calling for struct final.
|
BLD-Aging Inspection | 8/7/2006 | 8/7/2006 | 8/7/2006 | | DEFR |
Jim Sly
|
|
|
Let them know that we need all Req signatures prior to calling for Bldg final.
|
BLD-Aging Inspection | 4/17/2006 | 4/17/2006 | 4/17/2006 | | DEFR |
Jim Sly
|
|
|
Need all req signatures deferred to trades
|
BLD-Final | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/11/2002 at 10:59:17. Contact: ###-####. Need all req. signatures ...... 12/12/2002 11:30:34 AM
|
BLD-Final | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 14:11:03. Contact: ###-####.door opening in cmu wall ok 8/28/2002 10:31:52 AM
|
BLD-Final | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/30/2002 | 7/30/2002 | 7/30/2002 | A | PASS |
Dave Hannah
|
|
|
insulation also in ok to cover
|
BLD-Framing/Rough-in | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 16:32:36. Contact: ###-####. needs elec r/i 7/16/2002 10:10:11 AM needs elec r/i 7/16/2002 10:52:26 AM
|
Issue PAID IN FULL permit | | | 3/22/2002 | | |
|
|
|
|
Plan assigned to (MLO) | 1/8/2002 | | 3/20/2002 | | PASS |
Mike Otto
|
|
|
3/20/2002 08:49:50 MLO - activity updated through activity BLDA022 from case BLD02-00040.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/20/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2002 | | DONE |
|
|
|
talked to russ plans were ready
|
Routing - FIRE | 3/19/2002 | 3/19/2002 | 3/19/2002 | | PASS |
Bill Alexander
|
|
|
On condition that an updated fire flow report is provided prior to final!
|
Plan Review Completed(1st rev) | | | 1/24/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 1/24/2002 | | 1/24/2002 | | PASS |
|
|
|
Land division ok. Routed to Plan Review incl. new site plans received 1/22/02. (blc)
|
Routing - FIRE | 1/23/2002 | | 1/24/2002 | | FAIL |
Bill Alexander
|
|
|
Lack enough hydrants - locations to provide a minimum 4500 gpm. Lack fire flows available information. (UFC 901.2.2.2, 901.3, 903)
|
Routing - PLAN CHECK | 1/17/2002 | | 1/23/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/16/2002 | | 1/17/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 1/17/2002 | | 1/17/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/9/2002 | | 1/16/2002 | | FAIL |
|
|
|
Need a scaled site plan which shows entire parcel and gives dimensions. Faxed Russ Phillips and left message. Routed to Public Works. (blc)
|
Telephone call | | | 1/9/2002 | | DONE |
|
|
|
Received call from Kurt of Olson & Associates regarding floor drain in storage building addition. The owner wants to park his vehicle in this area, so the floor drain will be required. I told Kurt to call Lee Rice for the plumbing requirements to show drain connecting to sewer. Kurt informed me that they were pouring concrete, and I told him I would call the inspectors. In the meantime for him to bring in the requirements asap.
|
Telephone call | | | 1/9/2002 | | DONE |
|
|
|
Received a phone call from Kurt. He is working on plumbing plans and with Bench sewer district. He hopes to have something to us as soon as possible. kmm
|
Meeting | | | 1/8/2002 | | DONE |
|
|
|
1. Called and talked to Kurt with Olson & Associates - we need structural calculations. He brought over Calcs., we questioned drain w/grease trap and checked with Jim Wylie. No Civil required, but talked to Lee Rice. Lee stated that if a drain w/grease trap is used for storage of vehicle in the building, then we need plumbing showing connection to sewer. Kurt with Olson & Associates will call client to see what he wants to do. Hold plans for (1) day per Marlene.
|
Pending Assignment by JCM | 1/8/2002 | | 1/8/2002 | | DONE |
John Menard
|
|
|
1/8/2002 13:37:38 JCM - activity updated through activity BLDA174 from case BLD02-00040.
|
Application received | | | 1/8/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/8/2002 | | DONE |
|
|
|
|
Fee Review-notes | 1/8/2002 | 1/8/2002 | | | |
|
|
|
|