Permit Information
Permit NumberBLD02-00055
StatusFinaled
Name ST LUKES STL210532
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer NumberSTL210532
ePlanReviewNo
Description
(ST LUKES-EAST TOWER-4TH FLR)(PEDIATRIC & PICU EXPANSION) 4/7/03 -PLAN MODIFICATION. TO MODIFY THE ORIGINAL PICU ROOM LAYOUT TO REDUCE NUMBER OF ROOMS; ADD NEW HVAC RTU'S TO SERVE 4TH FLOOR NOW & PREP FOR FUTURE 3RD FL SERVICE RTU; TO MODIFY ELECTRICAL, MECHANICAL, PLUMBING, SPRINKLERS & ALARM SYSTEMS TO MATCH LAYOUT CHANGES & ADDITIONS. To finish the interior build-out of the 18,000 sq. ft. 4th floor of the ETE-2000 shell & core. Work to include completion of the mechanical, electrical, plumbing, fire suppression & alarm / detection systems, exit corridor, patient suites, smoke barrier and fire resistive construction to create the pediatrics and PICU patient rooms & support areas. All per approved plans, red-line notes & attached plan review comments and conditions by all reviewing agencies. NOTE: This building is fully sprinklered. PC#02-016/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/6/20041/6/2004 DONE
Permanent occupancy UNPAID FEE  1/6/2004 DONE
Perm. Occ. Cert. # 9917 issued 1-6-0 to St. Luke's RMC.
BLD-Final11/24/200311/25/200311/25/2003APASS
DetailsDave Hannah
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rolled over from yesterday. ok for perm occ 11/25/2003 9:26:28 AM
Permanent Occupancy 11/25/200311/25/2003 DONE
Details
BLD-Final11/21/200311/24/200311/24/2003PFAIL
DetailsJim Storey
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rolled over no insp. 11/24/2003 2:24:13 PM
FIRE-Final Inspection11/20/200311/21/200311/21/2003APASS
DetailsRick Jackson
ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/6/200311/7/200311/7/2003APASS
DetailsDave Hannah
ceiling cover--ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover rest of the areas 11/7/2003 9:50:47 AM
BLD-Framing/Rough-in11/5/200311/5/200311/5/2003PPART
DetailsDave Hannah
ceiling cover ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie area b ok 11/5/2003 2:54:19 PM
BLD-Wall cover10/30/200310/31/200310/31/2003ANR
DetailsDave Hannah
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes crew will rework perm wires 10/31/2003 12:30:35 PM
BLD-Other10/23/200310/23/200310/23/2003PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/23/2003 at 7:50:01 AM. Contact: ###-####.
BLD-Framing/Rough-in9/9/20039/10/20039/10/2003APART
DetailsDave Hannah
RON; Phone #: ###-#### Internet Inspection Request from: Marc Lileks hard lids area c ok to cover 9/10/2003 11:05:00 AM
BLD-Framing/Rough-in8/26/20038/27/20038/27/2003APART
DetailsDave Hannah
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore 8/27/2003 11:11:33 AM 8/27/2003 11:33:56 AM checked fire cualking ok to cover ceilings with hard lids area B 8/27/2003 11:35:32 AM
BLD-Framing/Rough-in7/29/20037/30/20037/30/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/29/2003 at 3:00:21 PM. Contact: ###-####...soffits, part, area A...need clg insp & firestopping above lid 7/30/2003 9:57:49 AM
BLD-Framing/Rough-in7/28/20037/29/20037/29/2003PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/28/2003 at 9:43:01 AM. Contact: ###-####....area A, need firestop floor drains, walls ok, chk firesops at lid insp. 7/29/2003 4:19:19 PM
BLD-Framing/Rough-in7/9/20037/10/20037/10/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/9/2003 at 3:07:33 PM. Contact: ###-####....walls ok area c, chk firestops & soffits w/ ceiling 7/10/2003 12:13:29 PM
BLD-Framing/Rough-in7/8/20037/9/20037/9/2003AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/8/2003 at 2:14:00 PM. Contact: ###-####...area c, c/n firestop boxes, patch wall penetrations, complete frame at soiled linen for 1hr separation...recall. 7/9/2003 12:19:50 PM
BLD-Framing/Rough-in7/8/20037/8/20037/8/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/8/2003 at 7:52:09 AM. Contact: ###-####.
BLD-Wall cover6/23/20036/24/20036/24/2003ANR
DetailsDave Hannah
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore on site to check progress on project with contractor ,he has started drilling and epoxying rebar ,they have had engineer on site several times a week and M.T.I. on to do spec inspection on rebar and epoxy also have had pull test done on that they have epoxyed all pass to date work is in progress 6/24/2003 10:58:08 AM
BLD-Framing/Rough-in6/24/20036/24/20036/24/2003PPART
DetailsDave Hannah
area B walls only
Print Occupancy Form  5/5/2003 DONE
Telephone call  5/5/2003 DONE
e-mailed curtis
Override - Parcel Holds  5/5/2003  
Override - Parcel Holds  5/5/2003  
(F) Reprint permit  5/5/2003  
Routing Off Site -Energy5/2/2003 5/2/2003 PASS
Plan modification of 4/7/03 in energy box.
Plan modification comcheck data & notes on plan for new equipment being installed on roof and interior for areas being modified are in compliance with 2000 IECC based on submitted data.drs
Routing - PLANNING4/30/2003 5/2/2003 PASS
Approve. Plan mod
Routing - PLAN CHECK5/2/2003 5/2/2003 PASS
Plan mod. kmm 5/2/03 - All agencies have done review and approved plan modification review with comments & conditions of approval attached to plans by all reviewing agencies.
PLANS/APPL TAKEN TO FRONT DESK  5/2/2003 PASS
Plans to permit desk for issue.
Override - Parcel Holds  5/2/2003  
Print Pending Permit.LaserJet4  5/2/2003  
Plan assigned to (DRS)4/8/2003 5/2/2003 PASS
DetailsDan Stuart
5/2/2003 14:21:47 DRS - activity updated through activity BLDA022 from case BLD02-00055.
Routing Off Site - STRUCTURAL4/8/2003 4/30/2003 PASS
Plan modifcation: Contacted PDQ to take plan modification of 4/7/03 to outside eng. Refrence bld00-02375 (concrete package for the St. Lukes ED/NICU Tower expansion)
4/30/03 - Fax from structural review third party approving data as submitted. Copy attached to plans. drs
Routing - PLAN CHECK4/24/2003 4/30/2003 PEND
Routing to Tempra in P&Z for review and attachment of CZC.
Routing - FIRE4/21/2003 4/24/2003 PASS
Plan modification of 4/7/03
Routing - PLAN CHECK4/16/2003 4/17/2003 PEND
Plan modification of 4/7/03
4/17/03 - Routing to fire code analyst for review of plan modifications.
Override - Parcel Holds  4/17/2003  
Print Pending Permit.LaserJet4  4/17/2003  
Routing - PLUMBING4/9/2003 4/15/2003 PASS
Plan modification of 4/7/03 vents must be 6" above flood level prior to connection to other vents, floor sinks and indirect waste receptors must be out from under cabinets, in rooms with ventilators one outlet must be capable of a flow rate of 180 lpm
Routing - PUBLIC WORKS4/8/2003 4/9/2003 PASS
Plan modification of 4/7/03
Plan routing begun/TENANTS  4/8/2003 DONE
Plan modification of 4/7/03
Received Certificate of Value  4/8/2003 DONE
Plan modification * Initial value * project value $1,960,000 Elect. $288,000 plumb. $342,000 Mech.$574,000 fire sprinkler $32,400 Fire alarm system $72,000
Plan Modification Accepted  4/7/2003 DONE
Plan mod submitted St. Luke's
Plan Modification Accepted  4/7/2003  
Plan modification excepted for St. Lukes Regional Medical Center Pediatric & PICU Expansion for the modification of the air handling units, structural support and concrete removal, interior design changes, and mechanical and electrical changes.
BLD-Conference3/28/20033/31/20033/31/2003APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 3/28/2003 at 10:43:28 AM. Contact: ###-####....referred to Dan Stuart for resubmittal 3/31/2003 5:53:46 PM
BLD-Conference3/26/20033/28/20033/28/2003APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 3/26/2003 at 2:58:17 PM. Contact: ###-####...need stamped resub for revisions 3/28/2003 1:31:19 PM
BLD-Aging Inspection3/14/20033/14/20033/14/2003 PASS
DetailsCarl Dependahl
project in progress ...will submit for modifications 3/18/2003 10:16:59 AM
BLD-Conference10/9/200210/10/200210/10/2002APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/09/2002 at 10:27:01. Contact: ###-####....work slow due to HVAC changes, etc...WIP. 10/10/02 8:57:36 AM
BLD-Conference9/20/20029/23/20029/23/2002APASS
DetailsCarl Dependahl
WIP, hvac may be redesigned...slow. 9/23/2002 10:39:55 AM
BLD-Conference9/20/20029/20/20029/20/2002PCANC
DetailsTom Arcoraci
stan; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Issue & PRINT to be Invoiced  5/2/2002 DONE
CHANGE ISSUED DATE  5/2/2002 DONE
Print Occupancy Form  4/24/2002 DONE
Inspection Record Card- Bld  4/24/2002  
Routing - PLAN CHECK4/22/2002 4/23/2002 PASS
Approved as noted and attached comments as part of approved plans.
PLANS/APPL TAKEN TO FRONT DESK  4/23/2002 PASS
To permit desk to issue.
Plan assigned to (DRS)1/10/2002 4/23/2002 PASS
DetailsDan Stuart
4/23/2002 15:23:40 DRS - activity updated through activity BLDA022 from case BLD02-00055.
Routing - FIRE4/16/20024/16/20024/22/2002 PASS
DetailsBill Alexander
Routing - PLAN CHECK3/21/2002 4/16/2002 PEND
Inserted re-submittals from architect into plans & reviewed against the UBC plan review. Did not receive second copy of sheet G0.2, A2.6 & A2.6A as requested with plan review. Called architect and requested second copy. Routing to fire code analyst for re-review.
Plan resubmittals received  4/16/2002 DONE
Received two copies of revised sheets G0.2, A2.6, A2.6A. Routed to Dan S. kmm
Plan resubmittals received  4/8/2002 DONE
Received two copies of revised sheets A8.1, M2.1, M2.2, M2.3, E10.0, E10.1, E10.2, E12.0, E12.1, E12.2. Two copies of plan response letters. Routed to Dan S. kmm
Routing - FIRE3/15/20023/20/20023/20/2002 FAIL
DetailsBill Alexander
Seperation penetration SF dampers located in wrong places, missing. Neeed corelation with alarm control plans. Egress identification througout is not correct.
Plan Review Completed(1st rev)  3/20/2002 DONE
Routing - PLAN CHECK1/24/2002 3/15/2002 FAIL
RE-SUBMITTALS REQUIRED. COPY OF PLAN REVIEW COMMENTS / CONDITIONS FAXED AND MAILED TO ARCHITECT FOR RESPONSE. PLANS TO FIRE CODE ANALYST FOR REVIEW.
Plan resubmittals requested  3/15/2002 FAIL
COPY OF PLAN REVIEW CORRECTIONS REQUIRED SENT TO ARCHITECT BY FAX & MAIL.
Plan resubmittals received  3/5/2002 PASS
received two copies of revised sheets GO.2, A2.6, A2.6A, A8.1. One copy of cover letter. Routed to Dan S. kmm
Routing - PLUMBING1/14/2002 1/24/2002 PASS
max. horizontal lenght of venting to comply with table 7-5 upc, additional cross connection may be required, hopper sink, hemodialysis mech, etc.
Routing - PUBLIC WORKS1/10/2002 1/14/2002 PASS
Plans ACCEPTED BY PLAN TECH  1/10/2002 DONE