(VANILLA FINISH-NO TENANT)(EXECUTIVE CENTER) To construct 8,934 sq.ft. warehouse space office and possibly retail area for future tenant per approved plans on file. Separate permit required for occupancy and storage racks over eight feet high. Work to include, construction of interior nonbearing partitions, construction of two accessible restrooms, installation of suspended ceiling system and related interior finishes, Separate permits required for Electrical, mechanical and plumbing work. THIS building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. This building was constructed in ADA County and annexed into the City of Boise. NO OCCUPANCY ALLOWED UNDER THIS PERMIT. (pc#020-02) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD3/29/20063/29/20063/29/2006 DONE
First Notice has not been responded to.
First Notice3/14/20063/14/20063/29/2006 DONE
DetailsMike Jordan
BLD-Aging Inspection3/14/20063/14/20063/14/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled3/14/20063/14/20063/14/2006PPASS
DetailsMike Jordan
Letter of compliance  5/15/2002 DONE
Letter of Compliance #22493 issued 5-15-02.
BLD-Final4/29/20024/30/20024/30/2002APASS
DetailsRuss Owen
###-####. this is ok, all trades ect have signed card, no occupancy is allowed under this permit. Vanilla finish only. 4/30/2002 3:33:45 PM
FIRE-Final Inspection4/30/20024/30/20024/30/2002PPASS
DetailsTroy Cobbley
fire life/safety and fire sprinklers for the vanilla finish OK 4/30/2002 12:08:59 PM
BLD-Other4/19/20024/22/20024/22/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/19/2002 at 12:22:17. Contact: ###-####.--ceiling grid
BLD-Framing/Rough-in3/22/20023/25/20023/25/2002APASS
DetailsRuss Owen
###-#### GILL . Ok after electrical inspection. 3/25/2002 11:05:04 AM
Issue PAID IN FULL permit  2/13/2002  
Inspection Record Card- Bld  2/7/2002 DONE
Telephone call  2/7/2002 DONE
LEFT MESSAGE PLANS READY
Routing - PLAN CHECK2/5/2002 2/6/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/6/2002 PASS
Plan assigned to (R_H)1/17/2002 2/6/2002 PASS
Details
2/6/2002 11:31:58 RMH - activity updated through activity BLDA022 from case BLD02-00060.
Routing - PLAN CHECK1/18/2002 2/6/2002 PASS
Routing - FIRE2/1/20022/5/20022/5/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  2/5/2002 DONE
Plan Reviewer's activity  2/1/2002 PEND
DetailsRon Hill
Plans passed in building plan review, Permit pending fire departments review, Routed plans to the fire department on 2/01/02.
Case Summary (BLD)  2/1/2002 DONE
Routing - PUBLIC WORKS1/17/2002 1/18/2002 PASS
Pending Assignment by MYS1/15/2002 1/17/2002 DONE
DetailsMarlene Southard
1/15/02-HOLD per contractor. Revised plans to be submitted for a basic vanilla finish only and not for occupancy. 1/17/02-Plans resubmitted for vanilla finish with no tenant. Began routing. Future tenant to be a fertilizer warehouse.
Additional plans submitted  1/16/2002  
Received two sets of revised plans for a vanilla finish. Routed to Marlene Southard.
Plans ACCEPTED BY PLAN TECH  1/11/2002 PEND
Plans are showing racks over 8'0". Contacted Bob Ross to have tenant obtain racking information. Requesting Occupancy questionaire. Location of chemicals on racks and % of what are in their chemicals. Had Bob speak with Dan S. kmm
First Notice1/10/20021/10/20021/10/2002 DONE
Application received  1/10/2002  
Recd Pcfee & Taken To Pln CK  1/10/2002 DONE