BLD-Final | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 08:17:45. Contact: . c, of c. #22185 issued 4/12/2002 2:31:58 PM
|
DOC - Permit Finaled | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 4/12/2002 2:32:06 PM
|
BLD-Wall cover | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 14:44:37. Contact: .
|
BLD-Energy code compliance | 3/6/2002 | 3/6/2002 | 3/6/2002 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 3/6/2002 10:50:52 AM
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 07:46:25. Contact: .c/n posted. 3/4/2002 2:42:47 PM
|
BLD-Other | 2/15/2002 | 2/19/2002 | 2/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 14:27:21. Contact: . ok to side 2/19/2002 11:00:22 AM
|
BLD-Foundation | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 12:26:56. Contact: ###-####. wip--reviewed cold weather requirements. 1/30/2002 9:38:55 AM
|
BLD-Footing | 1/29/2002 | 1/29/2002 | 1/29/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 07:22:12. Contact: . wip 1/29/2002 10:24:21 AM
|
Issue PAID IN FULL permit | | | 1/24/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/23/2002 | | PEND |
|
|
|
1/23/02 11:30 I talked with Dale Swink, the engineer. He let me know that the only difference for the foundation is the holdown anchors will have to be larger. He will have the builder drill and epoxy. I am issuing with this information the engineer gave me.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/23/2002 | | DONE |
|
|
|
left mess for bill that permit is ready
|
Plan assigned to (SAM) | 1/18/2002 | | 1/23/2002 | | PASS |
Steve Munroe
|
|
|
1/23/2002 11:48:21 SAM - activity updated through activity BLDA022 from case BLD02-00079.
|
Plan Reviewer's activity | | | 1/22/2002 | | PEND |
|
|
|
1/22/02 9:00 I called and talked to Bill Thorton. I let him know that I need overheight wall engineering for all walls over 10' in height. I also told him that I need lateral engineering for the back of the great room and front of the dining room. He said he will get it for me.
|
Case Summary (BLD) | | | 1/22/2002 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/22/2002 | | |
|
|
|
|
Pending Assignment by DJO | 1/14/2002 | | 1/18/2002 | | DONE |
Dan Overy
|
|
|
1/18/2002 13:49:32 SAM - activity updated through activity BLDA183 from case BLD02-00079.
|
Routing - PUBLIC WORKS | 1/15/2002 | | 1/16/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 1/14/2002 | | 1/15/2002 | | PASS |
|
|
|
|
Application received | | | 1/14/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 1/16/2002 | | | | |
|
|
|
|