BLD-Final | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | PASS |
Tom Arcoraci
|
|
|
ACCESS CODE 3515 ENTER ###-#### GARY
|
DOC - Permit Finaled | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 6/14/2002 3:35:50 PM
|
BLD-Energy code compliance | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 11:23:30. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 08:44:32. Contact: ###-####. c/n on site ok to insulate 3/4/2002 3:27:08 PM
|
BLD-Framing/Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Jim Sly
|
|
|
###-#### OK to cover all of Ext. (siding). 2/22/2002 4:24:50 PM
|
BLD-Framing/Rough-in | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | PART |
Steven Webb
|
|
|
TIM ###-#### SHEAR NOT FRAMING--- c/n posted--ok to cover except front left of house(B.Room#3 face). This area needs nails or 13 guage staples per plans, also--rear wall of garage per plans need double layer of 5/8" gyp. board, need inspection prior to mud and tape. 2/14/2002 2:32:16 PM 2/14/2002 2:32:43 PM
|
BLD-Foundation | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PART |
Steven Webb
|
|
|
###-#### stem wall 95 % ready--except hd not installed at time of inspection. 1/23/2002 2:15:28 PM
|
BLD-Footing | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PART |
Steven Webb
|
|
|
###-####wip--Appr. 75% ready at time of inspection. 1/22/2002 2:10:14 PM
|
Issue PAID IN FULL permit | | | 1/22/2002 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 1/18/2002 | 1/18/2002 | 1/18/2002 | | PASS |
Dan Overy
|
|
|
1/18/2002 09:42:46 DJO - activity updated through activity BLDA022 from case BLD02-00081.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/18/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 1/18/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/18/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/18/2002 | | DONE |
|
|
|
LEFT MESSAGE ON ANSWERING MACHINE PLANS READY
|
Plans ACCEPTED BY PLAN CHECK | | | 1/18/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 1/16/2002 | | 1/16/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 1/14/2002 | | 1/15/2002 | | PASS |
|
|
|
|
Application received | | | 1/14/2002 | | |
|
|
|
|
Pending Assignment by DJO | 1/14/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 1/16/2002 | | | | |
|
|
|
|