Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00090
StatusFinaled
Name CIVIC PLAZA PA-3 APARTMENTS
Site Address 190 E FRONT ST
Project NameCIVIC PLAZA-PA3 APARTMENTS
Customer Number 
ePlanReviewNo
Description
(CIVIC PLAZA PA3-APARTMENTS) MODIFIED 10/8/03 TO REFLECT THREE ADDITIONAL UNITS, ONE ON EACH FLOOR, FLOORS TWO THRU FOUR. To construct a 152 unit, 4-levels of R-1 apartments on an existing three story, Type S-3 parking garage with a grade level leasing office and community center laundry room and storage facility for the apartment complex. Work to include landscaping spine and temporary (grade) parking lot. All construction per the approved plans and attached comment list. DRH01-186 CUP01-00120 Plan Check # 29-02 03/10/03 * PLAN MODIFICATION * Change exterior curtain walls to standard walls, with openable windows and grills over A/C units, remodel first floor leasing office space, move fire pump room and emergency generator room, install PTAC units in each habital room. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/17/2010  
Case Summary (BLD)  6/30/2008 DONE
(F) Reprint permit  4/21/2005  
Case Summary (BLD)  12/6/2004  
Fee Review-notes2/10/20032/10/20034/30/2004 DONE
Fee Review-notes1/15/20021/15/20024/30/2004 DONE
Permanent Occupancy 1/16/20041/16/2004 DONE
Details
First Notice 1/16/20041/16/2004 DONE
Override - Parcel Holds  1/16/2004  
Permanent occupancy  1/16/2004 DONE
Perm. Occ. Cert. # 9936 issued 1-16-04 to the Civic Plaza PA-3 Apartments.
FIRE-Final Inspection12/31/200312/31/200312/31/2003PPASS
DetailsRick Jackson
BLD-Final11/13/200311/14/200311/14/2003ADONE
DetailsDave Hannah
fn john-- ###-####
Override - Parcel Holds  11/13/2003  
FIRE-Final Inspection11/3/200311/3/200311/3/2003PPART
DetailsRick Jackson
###-#### verified doors to elevator lobby and they all release on fire alarm and have positive latching 11/3/2003 3:18:38 PM
FIRE-Final Inspection10/9/200310/9/200310/9/2003PPART
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs tested elevator lobby doors for release with fire alarm and that is okay but doors don't remain latched as strike is released on fire; fire doors to remain latched but release lock 10/9/2003 4:36:41 PM
FIRE-Final Inspection10/1/200310/2/200310/2/2003APART
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Dave Miller fire/life safety will be on temp occupancy until the access control system is tested and disables with fire alarm activation and approval of the pressure reducing valve is submitted and approved by plan review 10/2/2003 9:14:25 AM
Temporary occupancy  10/2/2003 DONE
Temp. Occ. Cert. #5005 issued 10-2-03 to the Civic Plaza Apartments.
BLD-Final9/30/200310/1/200310/1/2003ACANC
DetailsDave Hannah
FIRE-Final Inspection9/30/200310/1/200310/1/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/30/2003 at 6:23:04 PM. Contact: ###-####. doors not latching; need smoke seals on electrical room doors; left list with John with other items 10/1/2003 4:44:04 PM
BLD-Final9/30/200310/1/200310/1/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/30/2003 at 6:24:44 PM. Contact: ###-####. ok for temp occ 10/1/2003 7:34:26 PM
FIRE-Final Inspection9/26/20039/29/20039/29/2003AFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to verify phase reversal for fire pump; wasn't a final but tested all sprinkler tampers and flows for exsisting and new systems; see previous final for correction list 9/29/2003 10:25:20 AM
BLD-Final9/26/20039/29/20039/29/2003PPART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore walk project with john made a punch list 9/30/2003 11:25:03 AM
FIRE-Final Inspection9/25/20039/26/20039/26/2003AFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs 9/26/2003 12:11:47 PM smoke seal on all rated doors; need floor drain, emergency lights and heat in fire pump room; stair signage; sprinkler heads fire proofed in stairs and elevator machine room; fire extinguishers require current inspection tag; see alarm permit for other items 9/26/2003 12:14:47 PM
FIRE-Final Inspection9/24/20039/25/20039/25/2003AFAIL
DetailsRick Jackson
john ; Phone #: ###-#### Internet Inspection Request from: Annette Moore started testing the alarms; see FIR03-00104 for info 9/25/2003 12:23:43 PM
BLD-Wall cover9/22/20039/23/20039/23/2003APART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover9/19/20039/19/20039/19/2003PCANC
DetailsDave Hannah
JOHN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Wall cover9/17/20039/18/20039/18/2003APASS
DetailsDave Hannah
allen; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4th floor elev shaft #1 ok to hang lid 9/18/2003 10:22:18 AM
BLD-Conference9/17/20039/17/20039/17/2003PDONE
DetailsDave Hannah
list of items that need tobe completed for final 9/17/2003 4:32:28 PM
FIRE-Supply Line Cover9/15/20039/15/20039/15/2003PFAIL
DetailsRick Jackson
JOHN CEILING COVER FIRE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks not a supply line cover; penetrations in corridors still need work on all floors 9/15/2003 2:02:03 PM
BLD-Wall cover9/15/20039/15/20039/15/2003PNR
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Inspection Record Card- Bld  9/15/2003 DONE
Print Occupancy Form  9/15/2003  
Print Occupancy Form  9/15/2003 DONE
BLD-Wall cover9/12/20039/12/20039/12/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Framing/Rough-in9/11/20039/11/20039/11/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Conference9/11/20039/11/20039/11/2003ADONE
DetailsDave Hannah
meeting on final occ and what needs tobe completed 9/11/2003 1:56:15 PM
BLD-Framing/Rough-in9/9/20039/9/20039/9/2003PPART
DetailsDave Hannah
john// ceiling cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 9/9/2003 4:34:42 PM
FIRE-Sprinkler Rough-in9/9/20039/9/20039/9/2003PFAIL
DetailsRick Jackson
john// ceiling cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore corridors not approved for cover - many penetrations require firestopping 9/9/2003 2:54:29 PM
BLD-Conference9/5/20039/5/20039/5/2003PDONE
DetailsDave Hannah
BLD-Wall cover8/28/20038/28/20038/28/2003PPART
DetailsDave Hannah
john shed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore stair shafts ok fo second layer on one inside first on out stair 2 second on insde 8/29/2003 8:55:37 AM
BLD-Wall cover8/20/20038/21/20038/21/2003APART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
FIRE-Conference8/19/20038/20/20038/20/2003APART
DetailsRick Jackson
met with Dave Hannah, John Shed, JP and subs about final requirements for occupancy. John Shed will provide checklist for final sign off 8/20/2003 10:43:50 AM
BLD-Conference8/19/20038/20/20038/20/2003ADONE
DetailsDave Hannah
8:30am meeting with john and rick
BLD-Wall cover8/14/20038/15/20038/15/2003APART
DetailsDave Hannah
BLD-Framing/Rough-in8/13/20038/13/20038/13/2003PPART
DetailsDave Hannah
BLD-Wall cover8/13/20038/13/20038/13/2003PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
BLD-Wall cover8/11/20038/11/20038/11/2003PFAIL
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2hr expansion joint between floors 8/11/2003 3:36:31 PM
BLD-Framing/Rough-in8/7/20038/8/20038/8/2003ANR
DetailsCarl Dependahl
alan, expansion joint info...mfr's spec doesn't show 5" gap for 2hr system....resubmit 8/8/2003 11:52:13 AM
BLD-Conference8/8/20038/8/20038/8/2003PPASS
DetailsCarl Dependahl
still need joint detail as req'd 8/8/2003 2:58:18 PM
BLD-Other8/6/20038/7/20038/7/2003ANR
DetailsCarl Dependahl
expansion joint
BLD-Framing/Rough-in8/5/20038/6/20038/7/2003AFAIL
DetailsCarl Dependahl
alan for cover; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need listing & install info, product for 2hr expansion joint not as plans show...submit. This is main exp joint thru entire bldg... 8/7/2003 11:56:04 AM
BLD-Framing/Rough-in8/6/20038/6/20038/6/2003PNR
DetailsCarl Dependahl
BLD-Wall cover8/1/20038/1/20038/1/2003PNR
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/1/20038/1/20038/1/2003PNR
DetailsDave Hannah
BLD-Framing/Rough-in7/30/20037/30/20037/30/2003PPART
DetailsDave Hannah
allen; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4th floor west side shafts all ok but for one in unit nw corner stair towers ok to put first layer on outsid second layer on inside ok 7/31/2003 10:06:29 AM
BLD-Framing/Rough-in7/18/20037/21/20037/21/2003APART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover7/21/20037/21/20037/21/2003PPART
DetailsDave Hannah
4th floor west half ok to cover all but shafts 7/21/2003 2:13:28 PM
BLD-Wall cover7/15/20037/16/20037/16/2003APART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore se stair tower ok to cover with second layer of sheet rock 7/16/2003 10:46:06 AM
BLD-Wall cover7/14/20037/15/20037/15/2003APART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4th floor west half c/n with allin and se stair shaft first layer of rock 7/15/2003 10:58:28 AM
BLD-Framing/Rough-in7/10/20037/11/20037/11/2003APART
DetailsCarl Dependahl
alan ceiling cover ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; ok to tile fl. 1 corridor pending other insps. 7/11/2003 2:26:18 PM
BLD-Framing/Rough-in7/10/20037/10/20037/10/2003PPART
DetailsCarl Dependahl
ok to tile clg at east portion 1st fl corridor, to model apts....pending elec, etc.
BLD-Final7/10/20037/10/20037/10/2003PNR
DetailsCarl Dependahl
ALLAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection7/8/20037/9/20037/9/2003APART
DetailsRick Jackson
first floor office/laundry/etc area okay to occupy 7/10/2003 12:57:41 PM
FIRE-Final Inspection7/8/20037/8/20037/8/2003PFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need closures on doors to corridor; door to lobby locks and is required exit 7/8/2003 4:26:18 PM
BLD-Wall cover7/8/20037/8/20037/8/2003PDONE
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection7/7/20037/7/20037/7/2003PCANC
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore received call from Allen and he said they won't be ready until 7/8 and he would reschedule 7/7/2003 3:45:13 PM
BLD-Wall cover7/7/20037/7/20037/7/2003PCANC
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover7/2/20037/3/20037/3/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore third floor west half first floor elev loby se corner 7/7/2003 9:39:47 AM
BLD-Wall cover7/1/20037/2/20037/2/2003PFAIL
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore fire proofing not ready 7/3/2003 7:31:15 AM
BLD-Framing/Rough-in6/23/20036/24/20036/24/2003PPART
DetailsDave Hannah
###-#### 4th floor east half ok to cover rooms only 6/25/2003 7:49:11 AM
BLD-Wall cover6/19/20036/23/20036/23/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4th floor ne 1/4 rooms only no shafts ok to cover 6/23/2003 4:11:32 PM
FIRE-Sprinkler Rough-in6/23/20036/23/20036/23/2003PPART
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore discussed requirements for first floor occupancy; need sprinkler plans submitted and alarms working 6/23/2003 3:58:23 PM
BLD-Wall cover6/19/20036/20/20036/20/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore ground floor area ok to cover walls 6/20/2003 2:12:03 PM
BLD-Framing/Rough-in6/17/20036/17/20036/17/2003PPART
DetailsDave Hannah
dennis 2nd story west side; Phone #: ###-#### Internet Inspection Request from: Barbara Moore s.w 1/4 2nd floor ok to cover rooms leave shafts open 6/17/2003 5:00:10 PM
BLD-Wall cover6/12/20036/13/20036/13/2003ACANC
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 6/13/2003 12:30:47 PM
BLD-Wall cover6/13/20036/13/20036/13/2003PPART
DetailsDave Hannah
fris floor noth west 1/4 romms only and sec floor north west 1/4 rooms 6/16/2003 9:50:05 AM
BLD-Wall cover6/9/20036/10/20036/10/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover6/6/20036/9/20036/9/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 1st floor north west 1/4 ok to cover rooms 6/9/2003 10:08:31 PM
BLD-Wall cover6/3/20036/4/20036/4/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in6/2/20036/3/20036/3/2003APART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover shafts on east half of fist and second floors 6/3/2003 1:02:40 PM
BLD-Framing/Rough-in6/3/20036/3/20036/3/2003PDONE
DetailsDave Hannah
BLD-Framing/Rough-in5/27/20035/28/20035/28/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/28/20035/28/20035/28/2003PPART
DetailsDave Hannah
3rd floor ne half rooms ok all but for shafts and elec conduit main runs also se half 3rd floor same as ne section allen has punch list 5/28/2003 2:19:54 PM
BLD-Wall cover5/22/20035/23/20035/23/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore second floor east half 5/23/2003 12:55:09 PM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003PPART
DetailsDave Hannah
ALLEN--OK TO COVER ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second floor area b south half ok to cover al but bath rooms 5/19/2003 5:22:07 PM
BLD-Wall cover5/15/20035/16/20035/16/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore second floor north east 1/4 ok to start covering all but bath room ares 5/16/2003 4:15:21 PM
BLD-Other5/13/20035/14/20035/14/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/13/2003 at 12:59:54 PM. Contact: ###-####. rooms 100,01,02/04/06,145,146.48/50 ok to cover 5/14/2003 5:46:28 PM
BLD-Framing/Rough-in5/9/20035/12/20035/12/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in5/6/20035/7/20035/7/2003PPART
DetailsDave Hannah
ALAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs rooms 136,138,140,142,144,145 ok to cover 5/7/2003 3:40:34 PM
BLD-Framing/Rough-in5/1/20035/2/20035/2/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/2/20035/2/20035/2/2003PDONE
DetailsDave Hannah
BLD-Framing/Rough-in4/28/20034/29/20034/29/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/28/2003 at 12:07:40 PM. Contact: ###-####.
BLD-Conference4/22/20034/23/20034/23/2003ADONE
DetailsDave Hannah
###-#### john MOC UP APPT 1HR FIRE WALLS 4/23/2003 12:19:21 PM
BLD-Framing/Rough-in4/22/20034/22/20034/22/2003PCANC
DetailsCarl Dependahl
john level one ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in4/18/20034/18/20034/18/2003PDONE
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in4/17/20034/17/20034/17/2003PPART
DetailsDave Hannah
FIRE-Sprinkler Rough-in4/11/20034/11/20034/11/2003PPART
DetailsRick Jackson
area B on first floor okay to cover
CHANGE STATUS TO (ISS)  4/9/2003 DONE
not to reissue, modification pick up
(F) Reprint permit  4/9/2003 DONE
Telephone call  4/3/2003 DONE
MODIFICATION READY FOR PICK UP
Plan assigned to (M_P)2/11/20032/11/20034/1/2003 PASS
DetailsMike Phillips
4/1/2003 15:38:35 M_P - activity updated through activity BLDA022 from case BLD02-00090.
PLANS/APPL TAKEN TO FRONT DESK  4/1/2003 DONE
Override - Parcel Holds  4/1/2003  
Print Pending Permit.LaserJet4  4/1/2003 DONE
Routing - PLAN CHECK3/13/2003 4/1/2003 PASS
plan modification
BLD-Conference3/25/20033/26/20033/26/2003ADONE
DetailsDave Hannah
BLD-Framing/Rough-in3/25/20033/25/20033/25/2003PDONE
DetailsDave Hannah
Plan resubmittals received  3/24/2003 DONE
Received two sets of resubmittal sheets M1.0 and M2.0 with (1) letter from Elkhorn Engineers, and (1) cover/comment letter. Routed to Mike Phillips.
BLD-Conference3/19/20033/20/20033/20/2003ADONE
DetailsDave Hannah
###-#### PER MIKE PHILLIPS
BLD-Conference3/20/20033/20/20033/20/2003PCANC
DetailsDave Hannah
BLD-Conference3/17/20033/18/20033/18/2003PDONE
DetailsDave Hannah
at 1:30
BLD-Conference3/17/20033/18/20033/18/2003PPASS
DetailsCarl Dependahl
at 1: 30 w/ Dave H. other trades & PCL supt at site. 3/18/2003 5:30:06 PM
BLD-Conference3/13/20033/13/20033/13/2003PDONE
DetailsDave Hannah
john ###-####
Routing - FIRE3/10/2003 3/13/2003 PASS
Plan Modification 02/10/03.
BLD-Conference3/11/20033/12/20033/12/2003PDONE
DetailsDave Hannah
###-#### fire stopping 3/12/2003 4:49:32 PM
BLD-Conference3/12/20033/12/20033/12/2003PDONE
DetailsDave Hannah
Override - Parcel Holds  3/11/2003  
BLD-Conference3/10/20033/10/20033/10/2003PDONE
DetailsDave Hannah
talked wiyh john about fire proofing 3/10/2003 5:34:40 PM
Override - Parcel Holds  3/10/2003  
Print permit w/o conditions  3/10/2003  
Routing - PLAN CHECK2/25/2003 3/10/2003 FAIL
Plan Modification 2/10/03.
3/10/03 * Additional informaiton required on mechanical plans to meet the building code requirements. Sent correction report to architect requesting additional information to be submitted for further review.
BLD-Conference3/4/20033/4/20033/4/2003ADONE
DetailsDave Hannah
BLD-Conference2/25/20032/26/20032/26/2003ADONE
DetailsDave Hannah
###-####
Override - Parcel Holds  2/25/2003  
Routing - PLUMBING2/18/2003 2/25/2003 PASS
Plan Modification 02/10/03. make waste connections to stacks with suds producing fixtures 8' downstream of vertical offset, good luck on your hot water volume on this building too.
Routing - PLANNING2/12/2003 2/18/2003 PASS
Approved per DRH02-102.
BLD-Framing/Rough-in2/12/20032/13/20032/13/2003PPART
DetailsDave Hannah
BLD-Conference2/12/20032/12/20032/12/2003PDONE
DetailsDave Hannah
Routing - PUBLIC WORKS2/11/2003 2/12/2003 PASS
Plan Modification 02/10/03.
Plans ACCEPTED BY PLAN TECH  2/11/2003 DONE
Plan Modification. (No Civil or Landscape sheets)
Plan Modification Accepted  2/11/2003  
Plan Modification accepted for Civic Plaza PA3 for the redesign of the building skin revised most windows and framing from curtain wall system to conventional. Shafts were eliminated in courtyards. Revisions to rooms in the garage (North Central). New MEP Plans. Floor Plan Revisions to grade level, SHT A-1.01. Courtyard windows revised. Parapets revised. Complete set of plans submitted without Civil Sheets and Landscape Sheets.
CHANGE STATUS TO (PND)  2/10/2003  
PLAN MODIFICATION SUBMITED
Recd Pcfee & Taken To Pln CK  2/10/2003 DONE
PLAN MOD
BLD-Conference12/13/200212/13/200212/13/2002PDONE
DetailsDave Hannah
on site to walk project and check spec inspection reports
FIRE-Conference12/5/200212/9/200212/9/2002PPART
DetailsRick Jackson
###-#### met with GC and owners rep about requirements during construction; told them to get plans for the standpipe requirements for additional floors 12/10/2002 10:44:37 AM
BLD-Footing11/21/200211/22/200211/22/2002APART
DetailsJim Storey
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie coered with special insp. 11/22/2002 10:23:37 AM
BLD-Conference11/12/200211/12/200211/12/2002APASS
DetailsCarl Dependahl
Need P.T. eng's direction for possible nicked cables, q.c. for welded assy's...etc. 11/12/02 11:48:35 AM
BLD-Conference11/8/200211/11/200211/11/2002PCANC
DetailsCarl Dependahl
BLD-Conference11/7/200211/8/200211/8/2002AFAIL
DetailsDave Hannah
c/n posted #1 stop drilling holes in p/t deck #2 need engineer or architect of record to submit a plan for drilling the p/t deck #3 need engineer to check three holes that crew may have hit p/t cables in and make recommendations 11/8/2002 2:52:04 PM
BLD-Conference11/6/200211/7/200211/7/2002ADONE
DetailsDave Hannah
trying to get a meeting set up 11/7/2002 3:45:18 PM
BLD-Conference11/5/200211/6/200211/6/2002PCANC
DetailsSteven Webb
BLD-Conference11/5/200211/6/200211/6/2002PCANC
DetailsSteven Webb
BLD-Conference11/5/200211/6/200211/6/2002PCANC
DetailsSteven Webb
Randy, ###-#### Requested conference for 11/7/02 a.m not 11/6/02 p.m. 11/6/2002 2:03:35 PM
BLD-Conference11/4/200211/5/200211/5/2002APASS
DetailsCarl Dependahl
Randy....need spec insp procedure, eng's guidelines for drilling existing P.T. deck, etc. 11/8/02 4:13:06 PM
BLD-Conference11/1/200211/4/200211/4/2002ADONE
DetailsDave Hannah
BLD-Conference11/4/200211/4/200211/4/2002PPART
DetailsCarl Dependahl
Pre-con w/ Dave & Randy Jordan: need all changes, RFI's, etc onsite; provide special insp "schedule"...req's further review/for inspection operation. 11/4/02 4:23:45 PM
BLD-Conference10/31/200211/1/200211/1/2002ACANC
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Conference11/1/200211/1/200211/1/2002ACANC
DetailsDave Hannah
BLD-Conference11/1/200211/1/200211/1/2002ACANC
DetailsCarl Dependahl
###-####
BLD-Conference11/1/200211/1/200211/1/2002ACANC
DetailsDave Hannah
rescheduled from 11-1
Issue PAID IN FULL permit  10/28/2002  
Routing - Erosion and Sediment10/23/2002 10/24/2002 PASS
ESC Plan required. Per BCC 8-17 construction was not substantially completed within 60 days after implementation (May 29, 2002) of Ordinance.

ESC approved with conditions attached to plans.
Plan assigned to (M_P)5/22/2002 10/23/2002 PASS
DetailsMike Phillips
10/23/2002 08:42:56 M_P - activity updated through activity BLDA022 from case BLD02-00090.
Routing - PLAN CHECK10/23/2002 10/23/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/23/2002 DONE
Telephone call  10/23/2002 DONE
CALLED 10-23-02///DLD
Routing - PLANNING5/22/2002 10/22/2002 PASS
Approved per DRH02-102 and DRH01-186, and as specified in the conditions requiring submittal of materials samples for approval by Design Review Staff.
CHANGE STATUS TO (PND)  5/22/2002  
Do not issue. In planning for further review prior to issuing permit. Modifing D.R.
Plan assigned to (M_P)2/1/2002 4/18/2002 PASS
DetailsMike Phillips
4/18/2002 09:44:56 M_P - activity updated through activity BLDA022 from case BLD02-00090.
Routing - PLAN CHECK4/18/2002 4/18/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/18/2002 PASS
Print Occupancy Form  4/18/2002 DONE
Inspection Record Card- Bld  4/18/2002 DONE
Routing - PLANNING4/15/2002 4/17/2002 PASS
Approve as noted on Sheet A-0.01.
Plan resubmittals received  4/17/2002 DONE
Received two copies of mech. plans and one copy of letter from Matt Younger. Routed to Mike P.
Routing - PLAN CHECK3/26/2002 4/15/2002  
Routing to Planning
Plan resubmittals received  4/12/2002 DONE
Received response/details to courtyard ventilation. Routed to Mike Phillips.
Plan resubmittals received  4/9/2002 DONE
Received two copies of Court yard ventilation information. Not stamped or signed. Given to Mike P. to do his review. Engineer will be faxing stamped and signed cover sheet around the 15th of April. KMM
Routing - PLANNING3/22/2002 3/26/2002 FAIL
Generator and fuel tank are not approved in the location shown on Sheet A-0.01. Contacted Margie Kennedy with Armstrong Architects.
Routing - FIRE3/20/20023/22/20023/22/2002 PASS
DetailsBill Alexander
Looked at location and requirements for out side generator as noted on sheet A-0.01.
Added Fire Pump, elevator issues not covered under previous reviews.
"Approved-but appliance submittals are required prior to installation".

Routing - PLAN CHECK3/22/2002 3/22/2002  
Routing to planning.
Routing - PLUMBING3/12/2002 3/20/2002 PASS
detail 5/M4.02- vents less than 6" above flood level of the fixture shall be installed with drainage fittings and graded to drain, do not trap, pipe fire system drains to an approved location.
Routing Off Site - STRUCTURAL3/7/2002 3/13/2002 PASS
Plan resubmittals of 3/6/02 sent to outside eng via PDQ. kmm
Comments added to report no further review required by outside engineering firm.
Routing - PLAN CHECK3/1/2002 3/12/2002 FAIL
Need additional information about court yard ventilation and outside engineering. Routing to fire and planning and plumbing.
Plan resubmittals received  3/6/2002 DONE
One copy of letter to Tim Hogland.
Plan resubmittals received  3/6/2002 DONE
Received three complete copies of revised sets, and calculations. One response letter from MVE, Skillings (structural) and Keen (mechanical). All of the above routed to Mike Phillips with one copy of plans and calcs going to outside eng. One copy of request for alternate approval from Mr. Hogland, which was routed to him.
Routing - FIRE3/4/20023/4/20023/4/2002 PASS
RECIEVED copy of access approval signed by Dave Miller, 10/18/01
Routing - PUBLIC WORKS2/28/2002 3/1/2002 PASS
Routing - PLANNING2/27/2002 2/28/2002  
Approved per DRH01-186 by TKW & CUP01-120 by DAA
Plan Review Completed(1st rev)  2/27/2002 FAIL
Routing - FIRE2/21/2002 2/27/2002 FAIL
ACCESS ISSUES
Routing - PLAN CHECK2/13/2002 2/21/2002 FAIL
Plan review completed, sent notice via e-mail to architects. Additional information required for further review prior to issuing permit.
Routing - PLUMBING2/11/2002 2/13/2002 FAIL
waste diagrams are incomplete- please provide a plan showing waste branch size and locations, routing to waste stacks, include risers for future washers in 2 bedroom units noted on detail 1/M4.02, provide a plan showing the laundry room DWV & water piping, and office/ admin. area. provide a fixture schedule, please provide your water sizing calculations, include fixture unit loading for pipe sizes 3/4" thru 4", verious main and branch line sizes seem undersized, 1 1/2" supply to water heater?. show roof drain branch piping size and location to leaders. roof drainage system piping diagram is incomplete, provide a plan showing all piping in the system, size and locations, the courtyards will require a roof drainage system with an overflow system piped to an approved location, the roof overflow piping system will not be allowed to terminate in the courtyard, page M3.01.
Routing - PLANNING2/5/2002 2/11/2002 FAIL
Need to submit final plans to Planning. Contacted architect. Failed to allow for plans to keep routing.
Routing Off Site - STRUCTURAL1/16/2002 2/5/2002 FAIL
Contacted PDQ to take plans to outside engineering.
Received structural comments from outside engineering firm. Second review required by outside engineering firm.
Routing - PUBLIC WORKS1/18/2002 2/5/2002 FAIL
Architect to supply plumbing ledger of fixtures.
Plans ACCEPTED BY PLAN TECH  1/18/2002 DONE
Received three copies of civil. put with plans and routed to PW. Brian stated he does not need calcs, or O&M manual. kmm
Plan routing begun/NEW & ADDTN  1/17/2002 DONE
Routing - PLANNING Land Div1/17/2002 1/17/2002 PASS
Brandi, would you please route back to plan review when you are done. I am waiting for some additional information before we can route to PW. Thank you, Kathy

Land division ok - parcel meets >5 acre exception to the Subdivision Ordinance. Routed to Plan Review. (blc)
Plans ACCEPTED BY PLAN TECH  1/16/2002  
Pending three extra copies of civil, O&M, and calculations. The "Not part of Contract" will be changed by Margie Kennedy of Armstrong Architects ###-#### per telephone conversation with Margie Kennedy. I will start routing plans as soon as Margie comes in to take care of above mentioned items. kmm
Margie came in and crossed out "not part of contract", still waiting for PW information. kmm
Application received  1/15/2002  