Case Summary (BLD) | | | 6/20/2008 | | DONE |
|
|
|
|
Fee Review-notes | 1/16/2002 | 1/16/2002 | 4/21/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 6/5/2003 | 6/5/2003 | 6/5/2003 | | CANC |
Tom Arcoraci
|
|
|
|
BLD-Final | 6/5/2003 | 6/5/2003 | 6/5/2003 | P | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 6/5/2003 | 6/5/2003 | 6/5/2003 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 6/5/2003 2:58:08 PM
|
FIRE-Final Inspection | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 9/25/2002 8:48:49 AM
|
FIRE-Final Inspection | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide tags on island fire extinguishers, test duct smoke detector, test automatic shutoff of pumps, provide "door to remain unlocked" sticker, remove lock on cooler door, provide address on orchard street side of building, provide red curbing as discussed 9/9/2002 9:16:36 AM
|
BLD-Other | 6/6/2002 | 6/10/2002 | 6/10/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 11:28:06. Contact: ###-####. set on lot by eng 6/10/2002 10:11:31 AM
|
Issue PAID IN FULL permit | | | 5/21/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/28/2002 | | 3/29/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/29/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/29/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2002 | | DONE |
|
|
|
talked to adam to verify plans are ready
|
Plan assigned to (M_P) | 1/17/2002 | | 3/29/2002 | | PASS |
Mike Phillips
|
|
|
3/29/2002 09:33:17 M_P - activity updated through activity BLDA022 from case BLD02-00096.
|
Routing - PLAN CHECK | 3/27/2002 | | 3/28/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/27/2002 | | 3/28/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 3/26/2002 | | 3/26/2002 | | PASS |
|
|
|
Land division ok. Returned to Plan Review. (blc)
|
Routing Off Site - STRUCTURAL | 3/13/2002 | | 3/15/2002 | | PASS |
|
|
|
Contacted PDQ to take revised calcs and geotec report to outside eng. kmm
|
Routing - PLAN CHECK | 2/19/2002 | | 3/13/2002 | | PEND |
|
|
|
Waiting for outside engineering, Public Work and Land Division to approve prior to issuing permit.
|
Plan resubmittals received | | | 3/8/2002 | | DONE |
|
|
|
Received two copies of revised sheets 1.1D 1.1F 3.2A, 3.3A, two copies of Supplemental calcs., three Geotec. engineering reports. Two copies of sheet 1 0f 2 for reference only. Routed to Mike P. kmm
|
Routing - PLANNING Land Div | 2/19/2002 | | 2/19/2002 | | FAIL |
|
|
|
Still missing deeds from 1972 to present. Returned to Plan Review. (blc)
|
Routing - FIRE | 2/12/2002 | | 2/15/2002 | | PASS |
|
|
|
APPROVED WITHOUT COMMENT
|
Routing - PLAN CHECK | 2/5/2002 | | 2/12/2002 | | PEND |
|
|
|
Plan review completed waiting for others to approve prior to issuing permit.
|
Print Pending Permit.LaserJet4 | | | 2/12/2002 | | |
|
|
|
|
Routing - PLUMBING | 1/30/2002 | | 2/5/2002 | | PASS |
|
|
|
see bld02-00097 for review comments.
|
Routing - PLANNING | 1/24/2002 | | 1/29/2002 | | PASS |
|
|
|
Approve per DRH01-194 conditions.
|
Routing - PUBLIC WORKS | 1/17/2002 | | 1/24/2002 | | FAIL |
|
|
|
Requires street light plan
|
Routing Off Site - STRUCTURAL | 1/17/2002 | | 1/24/2002 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Second review required by outside engineering firm.
|
Plan routing begun/NEW & ADDTN | | | 1/17/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/17/2002 | | 1/17/2002 | | FAIL |
|
|
|
This is a portion of Lot 1, Block 17, Lambachs Hillboro Subdivision, so need to see chain of deeds to 10/30/65 to verify legal land division. Faxed Adam Mow. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2002 | | DONE |
|
|
|
|
Application received | | | 1/16/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/16/2002 | | |
|
|
|
|