Case Summary (BLD) | | | 7/3/2008 | | DONE |
|
|
|
|
BLD-Final | 10/18/2002 | 10/18/2002 | 10/18/2002 | | DONE |
Tom Arcoraci
|
|
|
Final - approved by Tom for perm. occ.
|
Permanent occupancy UNPAID FEE | | | 10/18/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9406 issued 10-18-02 to Albertson's Express.
|
Permanent Occupancy | | 10/16/2002 | 10/16/2002 | | DONE |
|
|
|
|
Temporary occupancy | | | 9/30/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4868 issued 9-30-02 to Albertson's Express #162.
|
BLD-Final | 9/26/2002 | 9/27/2002 | 9/27/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 22:40:06. Contact: ###-####. ok for temp pending plumbing 9/27/2002 3:05:20 PM
|
BLD-Final | 9/25/2002 | 9/26/2002 | 9/26/2002 | P | NR |
Tom Arcoraci
|
|
|
REX; Phone #: ###-#### Internet Inspection Request from: Darla Downs needs plumb ok 9/26/2002 4:00:59 PM
|
FIRE-Final Inspection | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 9/25/2002 8:48:35 AM
|
PubWorks Occupancy Approval | 9/23/2002 | 9/23/2002 | 9/25/2002 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 9/26/02. G.Fitts
|
Code Occupancy Approval | | | 9/25/2002 | | PASS |
|
|
|
ALL IN FINAL SIGNED OFF.
|
FIRE-Final Inspection | 9/22/2002 | 9/23/2002 | 9/23/2002 | A | FAIL |
Troy Cobbley
|
|
|
fire extinguishers on the gas islands need to have the correct inspection tags. all other items on the correction notice have been corrected 9/23/2002 3:50:10 PM
|
FIRE-Final Inspection | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide tags on island fire extinguishers, test duct smoke detector, test automatic shutoff of pumps, provide "door to remain unlocked" sticker, remove lock on cooler door, provide address on orchard street side of building, provide red curbing as discussed 9/9/2002 9:17:08 AM
|
BLD-Framing/Rough-in | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | PART |
Tom Arcoraci
|
|
|
SUSPENDED CEILING ###-#### REX grid ok 8/30/2002 9:06:33 AM
|
BLD-Framing/Rough-in | 8/9/2002 | 8/12/2002 | 8/12/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 17:15:53. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/5/2002 | 8/6/2002 | 8/6/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### rex needs all rough ins ok to cover ext walls 8/6/2002 9:29:56 AM
|
BLD-Other | 6/6/2002 | 6/10/2002 | 6/10/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 11:26:13. Contact: ###-####. set on lot by eng 6/10/2002 10:11:14 AM
|
(F) Reprint permit | | | 5/22/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/21/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/28/2002 | | 3/29/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/29/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/29/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2002 | | DONE |
|
|
|
talked to adam to verify plans are ready
|
Plan assigned to (M_P) | 1/17/2002 | | 3/29/2002 | | PASS |
Mike Phillips
|
|
|
3/29/2002 09:31:25 M_P - activity updated through activity BLDA022 from case BLD02-00097.
|
Routing - PLAN CHECK | 3/27/2002 | | 3/28/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/27/2002 | | 3/28/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 3/26/2002 | | 3/26/2002 | | PASS |
|
|
|
Land division ok. Returned to Plan Review. (blc)
|
Routing Off Site - STRUCTURAL | 3/13/2002 | | 3/15/2002 | | PASS |
|
|
|
contacted pdq to take revies calcs and geotec report of 3-8-02 to outside eng. kmm
|
Routing - PLAN CHECK | 2/19/2002 | | 3/13/2002 | | PEND |
|
|
|
Waiting for outside engineering, Public Works and Land Division to approve prior to issuing permit.
|
Routing - PLANNING Land Div | 2/19/2002 | | 2/19/2002 | | FAIL |
|
|
|
Still need deeds from 1972 to present. Returned to Plan Review. (blc)
|
Routing - FIRE | 2/12/2002 | | 2/15/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/5/2002 | | 2/12/2002 | | FAIL |
|
|
|
Plan review completed, additional information required for further review, prior to issuing permit.
|
Print Pending Permit.LaserJet4 | | | 2/12/2002 | | |
|
|
|
|
Routing - PLUMBING | 1/30/2002 | | 2/5/2002 | | PASS |
|
|
|
locate r.p. for the soda mechine over the mop sink to handle spillage, provide a floor sink below r.p's noted on page 4.1 note 4108, pipe 1 1/4" to most remote toilet, verify thermol expantion tank sizing with manufacturer for required 50 gal. water heater/ 30 gal water heater ok with recirc to farthest lav per cdhd approval, pipe water heater t&p drain to janitor sink.
|
Routing - PLANNING | 1/24/2002 | | 1/29/2002 | | PASS |
|
|
|
Approve per DRH01-194.
|
Routing - PUBLIC WORKS | 1/17/2002 | | 1/24/2002 | | FAIL |
|
|
|
Requires street light plan
|
Routing Off Site - STRUCTURAL | 1/17/2002 | | 1/24/2002 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. kmm
Second review required by outside engineering firm.
|
Plan routing begun/NEW & ADDTN | | | 1/17/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 1/17/2002 | | 1/17/2002 | | FAIL |
|
|
|
This is a portion of Lot 1, Block 17, Lambachs Hillboro Subdivision, so need to see chain of deeds to 10/30/65 to verify legal land division. Faxed Adam Mow. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2002 | | DONE |
|
|
|
|
First Notice | 1/16/2002 | 1/16/2002 | 1/16/2002 | | DONE |
|
|
|
|
Application received | | | 1/16/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/16/2002 | | |
|
|
|
|