Permit Information
Permit NumberBLD02-00099
StatusFinaled
Name AARON BROS. ART & FRAMING (SCISSOR LIFT)
Site Address 8101 W EMERALD ST
Project NameBOISE TOWN PLAZA
Customer Number 
ePlanReviewNo
Description
(AARON BROTHERS ART & FRAMING - SCISSOR LIFT) To install a scissor lift in the parking lot on the West side of an existing tenant space. The lift will be used for unloading and/or loading products into trucks. Work is to include a concrete pit drained to the existing storm water system, pipe bollards, concrete sidewalk, and power supply all per approved drawings, engineering, and plan review conditions on file. In addition to all State and local codes, the lift shall comply with all applicable ANSI and OSHA standards. In the lowered position, the lift deck shall be flush with the surface of the concrete sidewalk. PC02-0033 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/16/20021/16/20024/21/2004 DONE
DOC - Permit Finaled  8/18/2003 DONE
BLD-Final3/7/20023/8/20023/8/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/07/2002 at 16:24:52. Contact: ###-####. ok for perm occ 3/8/2002 8:56:08 AM
FIRE-Final Inspection3/6/20023/7/20023/7/2002APASS
DetailsTroy Cobbley
fire life/safety finaled 3/7/2002 11:11:51 AM
BLD-Final3/5/20023/6/20023/6/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/05/2002 at 11:36:44. Contact: ###-####. Needs other signatures . 3/6/2002 12:11:17 PM
BLD-Concrete2/18/20022/19/20022/19/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/18/2002 at 10:09:11. Contact: ###-####.Poured appears ok ,went over special inspection requirements for epoxy bolts. 2/19/2002 11:31:04 AM
Inspection Record Card- Bld  2/12/2002  
Issue PAID IN FULL permit  2/12/2002 DONE
Routing - PLANNING2/8/2002 2/11/2002 PASS
Approved.
Routing - PLAN CHECK2/11/2002 2/11/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/11/2002 PASS
Plan assigned to (CJW)1/17/2002 2/11/2002 PASS
DetailsCarl Westfall
2/11/2002 14:00:00 CJW - activity updated through activity BLDA022 from case BLD02-00099.
Routing - PLAN CHECK2/7/2002 2/8/2002 PASS
Drawings approved after resubmittal review.
Routing - FIRE2/4/2002 2/7/2002 PASS
Plan resubmittals received  2/7/2002 DONE
Received two copies of revised sheet a1.12 one copy of response letter, copy of letter to Cheryl from Lee Harrison and copy of letter to Cheryl from Josef Mecko CASCO Equipment Corporation. Routed to Carl W. KMM
Plan Review Completed(1st rev)  2/7/2002  
Failed first Planning and UBC review.
Routing - PLAN CHECK1/25/2002 2/4/2002  
Failed first UBC review. UBC plan review started January 31, 2002 and finished February 4, 2002. A response from the architect was required. See the conditions report.
Routing - PUBLIC WORKS1/23/2002 1/25/2002 PASS
Routing - PLANNING1/17/2002 1/23/2002  
Failed first review. Mailed letter to Andy Erstad, Architect, explaining reasons for fail status (see DRH00-41 file).
Plans ACCEPTED BY PLAN TECH  1/17/2002 DONE
1. No building code data listed on plans.
Application received  1/16/2002  
Recd Pcfee & Taken To Pln CK  1/16/2002